測站高程 的英文怎麼說
中文拼音 [cèzhàngāochéng]
測站高程
英文
height of site- 測 : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
- 站 : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
- 高 : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
- 程 : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
-
Z coordinate and direction angle of the instrument can be calculated and reset by measuring z coordinate of known points ( max. 10 points ) displayed
通過觀測已知點的高程(最多10個點)來計算並重新設置測站點的高程與方位角。A general talk about total station apparatus triangulated height measurement
淺談全站儀三角高程測量According to the engineering practice, the theoretical basis and method that survey directly the horizontal distance and height difference by the total station system as fourth grade and below fourth grade control network are put forward instead of surveying slant distance and zenith distance
摘要根據工程實踐,提出了用全站儀直接測量平距、高差來代替測斜距、天頂距作四等及四等以下控制網測量的理論依據和方法,並以張河灣抽水蓄能電站施工控制網為例進行了比較計算。Observed tidal harmonic constants in many stations are used to verify the astronomical tides in the compound fluid model. the wave model is tested by a set of wave flume data at first. then the results are compared by the actual processes of significant wave height in gauging stations
其中復合流場模型中的天文潮利用眾多測站的實測調和常數進行驗證;波浪模型首先進行了水槽實驗的檢驗,然後在臺風過程中,進行了測站有效波高過程線的比較。Because the elevation data we have acquired through gps is too variable to satisfy the mapping accuracy requirement the elevation value is solved by the water lever observation in the hydrology station and datum horizon correction of sounding observation
由於gps的rtk模式測量所獲取的高程精度不能滿足測圖精度要求,因此其高程值是通過測量水深值、結合其統一到基準面的改正數、根據相關水文部門各水位站提供的水位觀測資料綜合計算獲得。Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project
溪洛渡水電站超大型地下洞室群圍巖穩定的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關子水電站攔河閘壩及地基的應力應變分析:被成都勘測設計研究院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措施研究:為廠房壩段並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤防滲漏管涌破壞提供分析軟體; ( 5 )向家壩地下洞室群圍巖穩定的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和穩定的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大工程壩體的靜動力安全穩定性及溫控方案提供依據。Specification for calculation of protecting distance for ac high voltage overhead power transmission lines to shortwave radio direction finding stations and receiving stations
交流高壓架空送電線對短波無線電測向臺站和收信臺站保護間距的計算規程During the course of the research, the criterions of the interpolation effect are mean error ( me ), mean absolute error ( mae ), root mean squared interpolation error ( rmse ) and the difference of mean square deviation between the measured and the estimated surface air temperature. the conclusions are as follows : ( 1 ) by contrasting the gaussian weighted model associated with the error modification with the gaussian weighted model, the error modification is proved to considerably ameliorate the precision of spatial interpolation ; ( 2 ) on the base of the gaussian weighted model, taking altitudinal effect into account can reflect the trend in which temperature changes according to the topographic altitude and may ameliorate the precision of spatial interpolation correspondingly and apparently, which indicates that topographical effect on the preciseness of spatial interpolation can not be disregarded in terms of the region with complicated topography ; ( 3 ) the map of daily surface air temperature distribution, using the modified gaussian weighted model a and b, can accurately reflect the temperature - changing - with - topographical - altitude trend. among them, the better is the model a, whose me is below 0. 03 ?
在此過程中,採用平均誤差( me ) ,平均絕對誤差( mae ) ,插值平均誤差平方的平方根( rootmeansquaredinterpolationerror ,簡稱rmsie ) ,插值前後測站要素值的均方差( meansquaredeviation ,簡稱msd )差值作為判定插值效果的標準,得出如下結論:通過高斯權重法與結合逐步訂正的高斯權重法的對比,說明結合逐步訂正方案的高斯權重法可大大提高地面日氣溫的插值精度;在高斯權重法中加入海拔影響項可以反映出溫度隨地形高度的變化趨勢,同時也能較大地提高地面日氣溫的空間插值精度,說明在地形復雜的區域,地形影響在插值精度中是不可忽略的;對于高斯權重法的兩種改進方案得到的地面日氣溫分布圖都能很好地反映出表面大氣氣溫隨地形高度的變化趨勢。Currently sewage in sewage pumping station system is pumped manually. so the station is working in low water level and energy is consumed. this mode ca n ' t predict the inflow ' s changing
當前污水泵站排放系統主要採用人工值守方式排水,低水位高揚程耗能嚴重,且缺乏預測能力,流量洪峰來臨時易產生污水溢出污染。Recommended practice for determining the electric power station ground potential rise and induced voltage from a power fault
測定電源故障引起的電站地面電位升高和感應電壓的推薦規程To overcome this problem, not only the meteorological observation network has to be equipped with automated, higher precision, and more economical devices and instruments, but also a synthetic mobile observation system is required for filling in the data gaps between the surface and upper air sounding stations
為了克服這一問題,除了研製自動化程度高、測量精度高和性能價格比高的儀器設備來裝備現有的定點大氣觀測網外,還應建設一些流動的大氣監測系統,以獲得常規大氣觀測臺站空檔間(如大洋、山區和荒漠等無人區)的天氣現象和大氣環境變化的信息。With 20, 000m2 of floor area, 100, 000m2 of building area, including a product exhibition and trading center combining exhibition, business negotiation and business meeting, a enterprise service center for one stop service combining base management, industrial and commercial and administration, customs, tax affairs and trading, a r & d center for mould technology combining mould manufacturing technology research and development, test and inspection, consultation and enterprise technical service, a mould technology training center for training professional people including senior technical staff, senior sales and marketing staff and senor technicians, and an information service platform combing the synergetic data exchange and corporations interaction to achieve cad / cam / cae / capp, electronic commerce, “ corporation database of mechanical industry ”, “ database of mechanical and electrical products ”, “ database of talents resource for mechanical industry ”, “ database of experts brain for mechanical industry ” as well as providing public information to the enterprises in the base
佔地面積2萬平方米,建築面積10萬平方米,包括集產品展示、貿易洽談、商務會議於一體的產品展示交易中心;集基地管理、工商行政、海關、稅務、經貿等一站式服務的企業服務中心;集模具製造技術研究開發、檢測、咨詢、企業技術服務於一體的模具科技研發中心;用於培養培訓高級工程技術人員、高級營銷管理人員、高級技術工人等專業人才的模具技術培訓中心;集實現cad / cam / cae / capp的異地協同數據交換和企業間的交互、電子商務、 「機械行業企業數據庫」 、 「機電產品數據庫」 、 「機械行業人才資源庫」 、 「機械行業專家腦庫」於一體並為基地企業提供公眾服務的信息服務平臺。The paper expounds the principle of triangular elevation surveying and its accuracy, and further presents the accuracy norm for 4 ( superscript th ) grade of leveling surveging
摘要闡述全站儀三角高程測量的原理及精度,在此基礎上得出達到四等水準測量的精度要求。The method of the total station transfer leveling parameter applied to the construction of yunyang yangtse river highway bridge shows that in can not only ensure the surveying precision but also improve the work efficiency
通過雲陽長江大橋施工中的應用表明,在一定的條件下採用全站儀間視法三角高程測量來實現高程的傳遞,不僅能保證測量精度,而且可以提高工作效率。Senior engineer deputy director, x environmental monitoring central station
市環境監測中心站副站長高級工程師The key problem to be solved in multi stations tdoa system is spatial and time synchronism between stations, weak signal detection and solution for high precision location equation
多站時差定位系統也有其自身要解決的關鍵技術和難點:多接收站之間的時間、空間的同步問題,目標回波的弱信號檢測問題,高精度的定位方程組求解方法。Analysis and application of topcon gts - 602 total - station instrument to measure elevation
602全站儀高程聯系測量的分析及應用Abstract : aimed at surveying method of three - dimensional traverse, this paper makes research on accuracy matching of three - dimensional traverse by electronic total station, and comes to the conclusion that rating - planimetric - traverse matches well with corresponding rating - vertical - traverse
文摘:利用全站儀可以將平面控制測量和高程式控制制測量融為一體三維控制測量.針對全站儀三維導線的作業方法,討論了它的精度匹配問題,得出等級平面導線與對應的等級高程導線相匹配的結論The author analyses present situation of dancing studies in normal colleges in jiangxi, such as prefessional extra test, general knowledge test and course arrangement, and then draws a conclusion about educational objective of dancing specialty in normal colleges, which not only should satisfy social needs to provid primary and secondary school and mass art organization with dancing education, but also should train educators with comprehensive qualities who understand dancing art education and educational art in a new big vison
摘要通過對江西省高等師范院校舞蹈學專業在專業加試、文化測試、課程設置等幾方面現狀進行分析,認為高等師范舞蹈學專業的教育目標,不僅要面向社會,根據中小學舞蹈教育及群眾文藝等非職業舞蹈教育的需要,同時要站在國際舞蹈教育大視野的角度,培養具備舞蹈藝術與教育藝術以及人文綜合素養的跨學科的教育者。Main problems are the anti - slide test report and inspection record of high strength bolts that connecting structure steels have not been provided according to the requirement of design ; since there is no measurement certificate attached to the test report issued by the jincheng mine project quality inspection station of shanxi coal mine industry administration bureau, it will not be allowed to use these test reports as the one of unit project quality control documents
主要是未按設計要求提供出鋼架連接處高強度螺栓抗滑移系數試驗報告和檢測紀錄;由山西省煤炭工業管理局晉城礦區工程質量檢測站出具的試驗報告無計量認證章,在今後的工程中不能再作為單位工程質量控制資料中的試驗報告。分享友人