測試內容 的英文怎麼說

中文拼音 [shìnèiróng]
測試內容 英文
test content
  • : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
  • : 名詞(古代占卜用的器具) astrolabe
  • : 名詞1. (內部; 里頭; 里邊) inner; inside; within 2. (妻子或妻子的親屬) one's wife or her relatives 3. (姓氏) a surname
  • 測試 : test; testing; checkout; measurement
  1. Officers submit themselves to educative " integrity tests " around high - risk aspects of their work

    執法人員會接受誠信圍繞他們工作上的高危層面。
  2. Based on the characteristics and performance parameters of hj - 1c small satellite and its sar remote sensor, the novel task, to propose the on - orbit test contents and methods for the sar images, is explored for the first time

    本論文的成果在於,根據hj - 1c小衛星及其sar遙感器的特點及性能參數,初步論證了hj - 1c星載s波段sar在軌測試內容和方法。
  3. Validation rules test for the existence of content

    驗證規則測試內容是否存在。
  4. An evaluation on the test of chinese common speech level : its content and method

    關于普通話水平測試內容與方法的思考
  5. You can now test the content page to be sure it is referencing the master page s

    現在可以測試內容頁,以便確定它是否正確引用母版頁的
  6. Once a subscription is successfully saved, you will be able to test the content adapter

    一旦成功保存訂閱,就可以開始測試內容適配器。
  7. The methods mentioned above is effectual in the derived test of pki

    以上測試內容和方法應用到具體的pki系統評之中取得了良好的效果。
  8. Second, the test types, test objects, test levels and test methods have been argued

    第二,介紹web應用類型、測試內容層次劃分及方法。
  9. Finally, the system test content for serial conditional access and the solution for the problem in test are given

    最後文章給出了串口條件接收系統測試內容,及過程中所遇到問題的解決方案。
  10. The performance information shown in the preceding table was collected using a beta version of domino 7, and is subject to change

    上表中顯示的性能信息是使用domino 7的一個beta版本並通過更改測試內容收集的。
  11. This works should be helpful to establish the system of the on - orbit test contents and methods for our country ’ s hj - 1c small satellites

    這項工作在我國還是第一次開展,對建立hj - 1c衛星在軌測試內容和方法的體系具有重要參考價值。
  12. The tests included measures of short - term and delayed memory, which asked these older people to recall elements of a story that had just been read to them

    測試內容包括衡量他們短期和延時記憶,也就是讓這些老人回憶剛給他們講過的故事
  13. The emphasis is about the metal line reliability, contact reliability, gate oxide integrity, and hot carrier injection in test. based on the test datum, the reliability of 1. 0 m process on single failure mechanisms is evaluated, and all the test structures are explained

    測試內容上著重介紹了金屬化完整性、氧化層完整性、連接完整性和熱載流子注入,根據數據,對1 . 0 m工藝線單一失效機理的可靠性進行了評價,對不同結構的作用進行了說明。
  14. The in - situ testing includes surface deformations, sub - surface movements, earth pressures, pore water pressures, underground water levels, spt, stresses of pipes and pipe - soil contact stresses. in addition, the total jacking forces, deviations in line and level of the pipe line and earth pressures in the earth pressure balance machines ( epbm ) are also recorded. the results of field - testing are analyzed, and the variety of testing datum include earth pressures, pore water pressures and underground water levels during the course of the shield through it are studied

    現場測試內容包括地面變形、深層土體變形、土壓力變化、孔隙水壓力變化、地下水位變化、土體標準貫入驗、管道力變化、管土接觸應力變化以及頂管施工現場記錄(包括頂力、土壓力、平面偏差、高程偏差等) 。
  15. Ground subsidence, rebound deformation and horizontal deflection were measured, displacements inside the excavated slope were monitored and ground cracks and failure modes caused by extra excavation were investigated

    測試內容包括土體位移、地表沉降、基底隆起、地面裂縫及超挖引起的破壞形態。
  16. This experiment include many contents, in a word, that is summer condition experiment, winter condition experiment > summer - winter transition condition experiment and winter - summer transition condition experiment, furthermore summer condition experiment still include flux changing experiment and winter condition experiment still include thermal balance experiment this article dealt with the data of the test, calculating out energy absorbing ( energy discharging ) of buried pipe in winter condition ( summer condition ), input power of heat pump x heat exchanging of piece buried pipe length x co - efficiency performance ? op ( energy efficiency rate ? er ) and average heat exchanging coefficient ; in additiont this article compares the inlet water temperature and outlet water temperature of underground the first layer and the second layer buried pipe when heat pump was running, the results are that the heat exchanging ability of the second layer buried pipe outgos the first layer buried pipe, and heat exchanging is more stable ; and still analyse earth temperature resuming in the transition season. the results are earth temperature resume fast in the first week when the heat pump runs off

    本文測試內容相當多,概括地說就是四個工況的,即夏季製冷工況的、冬季供熱工況的、夏?冬過渡季和冬?夏過渡季;另外在夏季工況的中還進行了變流量,在冬季工況的中還進行了熱平衡。本文對數據進行了處理,計算出了冬(夏)季工況埋管吸(放)熱量、熱泵空調器供熱量(製冷量) 、熱泵空調器輸入功率、埋管單位管長換熱量、供熱性能系數(製冷能效比)和平均傳熱系數等;另外,還比較了熱泵運行時地下一二層埋管進出水溫度變化情形,得出地下二層埋管換熱能力優于地下一層埋管,且換熱很穩定;並分析了過渡季地下一二層埋管溫度恢復情形,得出熱泵系統停機一周地溫恢復特別快。
  17. ( 2 ) it negotiated the idea of xp programming. it put forward the process of making unit testing, the method of predigesting the content of it, and the measures of realizing the simple design. ( 3 ) it analyzed the relations of xp team practices

    ( 2 )討論了xp編程的思想,給出了進行單元的步驟、對單元測試內容的簡化方法,為實現簡單設計而在消除重復代碼上所採取的功能細粒度、創建新方法的措施。
  18. It is proved that the formula is exclusive in this test system by experiment. the standard tft - lcd module has been tested by this test software, including contrast ratio, color chromaticity, viewing angle, bad dot and luminance. these tested data are compared with those parameters of standard tft - lcd module, which proved that varying amplitudes are all in the required region of tft - lcd module testing

    應用本軟體對經檢驗合格的標準tft - lcd模塊進行測試內容主要為對比度、色度、視角范圍、壞點、亮度等,將得的數據與標準tft - lcd模塊的參數進行比較,其數據變化幅度均在tft - lcd模塊所規定的范圍之,符合tft - lcd模塊的要求。
  19. As can 、 lin 、 uart 、 van, there are lots of car protocol coming out. among them, lin gives the whole network technology new energy and shows us a cheap and stabilized protocol. in this background, faw - volkswagen use the lin bus in the car comfort system, and it is a special word in the car, it mainly control the windows - lifter 、 locks - closedown 、 top lighting - control 、 and baggage trunk.

    從lin總線的實現原理及舒適系統的組成結構入手確定了系統的測試內容;根據確定了軟硬體的選擇,並進行了控系統的整體結構設計和連接,完成了臺的搭建和調;最後按照所要的步驟編寫了上下位機軟體。
  20. Study two, drawing up " promote group cooperative inquiry teaching strategy " in view of group factor and " buoyancy " as test content, discussed the effect on inquiry learning by using the teaching strategy in physics class

    研究二針對小組因素制定了「促進小組合作探究的教學策略以「浮力」為測試內容,探討了在物理課堂教學中引入該策略對學生探究性學習的影響。
分享友人