測試準則 的英文怎麼說

中文拼音 [shìzhǔn]
測試準則 英文
testing protocol
  • : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
  • : 名詞(古代占卜用的器具) astrolabe
  • : Ⅰ名詞1 (標準) standard; guideline; criterion; norm 2 (目標) aim; target Ⅱ動詞1 (依據; 依照)...
  • : Ⅰ名詞1 (規范) standard; norm; criterion 2 (規則) regulation; rule; law 3 (姓氏) a surname Ⅱ...
  • 測試 : test; testing; checkout; measurement
  • 準則 : norm; standard; criterion; rule; formula; square
  1. When measuring the magneto performance parameter , we find that the instrument which use to measure voltage and current is still the simple voltmeter and amperemeter in the national standard , and the form of wave that we observed is anomaly. based on the measure principles, it obviously ca n ' t be used to do quantitative analysis ; because the discharge process of ignition system is quite complex, accompanies with very strong electromagnetism interference, and the ignition current and voltage are variable , it make the measure of ignition energy become a difficult thing of ignition system performance detection

    在磁電機常規量時,發現在國家標中用於量電壓、電流的儀器仍然是普通的電壓、電流表,而觀到的波形多為不規的形狀,根據量原理,顯然不能用其來做定量的分析;由於點火系統的放電過程比較復雜,伴隨著很強的電磁干擾,點火電流、點火電壓都是變量,使得點火能量的量成為點火系統性能的一個難點。
  2. Guide lines for the use of basic standards and for the preparation of noise test codes

    使用基礎標與制訂噪聲規范的
  3. For quality estimate model, it describes the quality factors ( maintainability, reusability etc ) and guide lines ( mensurability, readability etc ) that imported from halstead, mccabe, verilog metric methodologys

    質量評價模型描述了從halstead 、 mccabe的度量方法學和verilog引入的質量方法學中的質量因素(可維護性、可重用性等)和質量(可性、可讀性等) 。
  4. While 58 of the 100 people tested accurately wrote down the emotional words when spoken into their right ears, that number jumped to 70 when vocalized into their left

    用右耳進行的人員對情話的確記憶是58 % ,而用左耳進行的人員對情話的確記憶達到了70 % 。
  5. In this paper, we analyse canny criteria and canny operator in detail. we compare and evaluate the algorithms mentioned above

    本文詳細介紹分析了這三條和canny演算法,並對canny演算法進行了實現並其效果。
  6. Information technology. open systems interconnection. conformance testing methodology and framework. requirements on test laboratories and clients for the conformance assessment process

    信息技術.開放式系統互連.一致性方法和.第5部分:一致性評定過程對驗室和客戶的要求
  7. By means of laboratory and field experimentation of typical semi - rigid base materials, the relationships among laboratory experimental values, field maintain values, field core values and construction criteria are put forward. and the relationships between different test methods are established. using time - temperature conversion principle, it processes the intensity assessment of field cores, then offers the method of determining the test deflection of pavement surface

    通過典型半剛性基層材料的室內外驗,研究主要設計參數的室內驗值、野外養生值、現場取芯值及施工指標間的關系,建立了不同驗方法間的相關關系,運用時溫換演算法,對現場芯樣進行強度評定,並提出了路表彎沉檢的確定方法。
  8. The agreement follows a direct request from the cga that the r a provide expert rules of golf coaches, structured learning materials and a new graduated examination system that leads to accredited national and international referee status

    協議滿足了中國高爾夫球協會的要求,即:皇家古老高爾夫俱樂部提供高爾夫球規方面的專家教練、安排教學材料和學員是否符合國家級或國際級裁判員標的考核系統。
  9. To demonstrate compliance with the overriding public need test

    說明符合凌駕性公眾需要的測試準則
  10. Report on cogent and convincing materials to demonstrate compliance with the overriding public need test

    說明符合凌駕性公眾需要的測試準則的具有力和令人信服的資料
  11. Report on review of criii by applying the court of final appeal s " overriding public need test

    運用終審法院所訂"凌駕性公眾需要測試準則"檢討中區填海第三期工程的報告
  12. A review of central reclamation phase iii by applying the court of final appeal s " overriding public need test

    引用終審法院訂立的凌駕性公眾需要測試準則檢討中區填海第三期工程
  13. Guidelines for smoke testing

    >冒煙測試準則
  14. Software evaluation and test involves identifying the deliverables to be evaluated / tested ; determining the types of evaluations / tests to be performed ; defining the success criteria for each evaluation / test ; designing, building, and executing the necessary evaluations / tests ; verifying the evaluation / test results ; verifying that the set of tests fully cover the defined evaluation / test criteria ; creating and executing regression libraries to re - verify deliverables that have been modified ; and logging, reporting, and tracking defects identified

    軟體評價和包括識別需進行評價和的交付產品;確定需要執行的評價和類型;定義每個評價和的成功;設計、構建、執行所需的評價和;驗證評價和結果;驗證集全面覆蓋既定的評價和測試準則;創建和執行回歸庫以用於在交付產品發生修改後進行重新驗證;登記、匯報、跟蹤發現的缺陷。
  15. All alpha stage products should be tested under the prescribed test standard, the main testing reference is protect outline of vpn product

    所有送檢產品的都必須依據相應的測試準則vpn產品的基本參考資料就是vpn產品保護輪廓。
  16. This single test has replaced the three tests previously laid down by the high court

    這單一測試準則取代了早前高等法院提出的三項
  17. By analyzing expression between a and fuzzy entropy from the view of analytics, this paper analyses the relationship of between a and fuzzy entropy and the changing trend of fuzzy entropy function with the increase of a, then discusses the sensitivity of the parameter a to classification result such as total nodes, rule number, classification accuracy of fuzzy decision tree, proposes an experimental method of obtaining optimal a, it is proved by experiment that the optimal value a obtained by this method can make the classification result of fuzzy decision tree best, and therefore provides the academic evidence of selecting parameter a in order to gain the best classification result

    本文在visualc + +軟體開發平臺及模糊id3演算法的基礎上,從解析的角度出發,通過分析參數與模糊熵之間的函數關系式,討論了隨著的增加,模糊熵函數的變化趨勢,進一步分析了參數對模糊決策樹的分類結果在訓練確率、確率、規數等方面所表現出的敏感性,探討了得到最優參數的實驗方法。實驗證明,利用這一方法得到的最優參數的值,可以使模糊決策樹的分類結果達到最好的效果,從而為人們用模糊決策樹進行分類時選取參數以獲得最優的分類結果,提供了良好的理論依據。
  18. 19. reclamation for the cwb meets the overriding public need test. there is no reasonable alternative

    19 .中環灣仔繞道的填海工程符合凌駕性公眾需要的測試準則,同時亦無其他合理的替代方案。
  19. The administration completed an engineering review of criii confirming that it can meet the high court s " three tests "

    檢討報告證實,中區填海第三期工程能符合高等法院所頒布的三項測試準則
  20. We will review the remaining reclamation in wan chai north and south east kowloon against the single test laid down by the court

    今後,我們將按照終審法院訂定的單一測試準則去檢討餘下的灣仔北和東南九的填海工程。
分享友人