測試站 的英文怎麼說

中文拼音 [shìzhàn]
測試站 英文
test station
  • : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
  • : 名詞(古代占卜用的器具) astrolabe
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  • 測試 : test; testing; checkout; measurement
  1. Methods of testing airflow measurement stations for rating

    空氣流量評定的驗方法
  2. So far i have tested xm with two web sites, ananas. org and another site that is still under development

    迄今為止,我已經在兩個網過xm ,其中一個是ananas . org ,另一個還在開發中。
  3. To keep the environment people live in, we should restrict or prevent many kinds of pollution, which includes electromagnetic radiation pollution. while we are considering setting up base station or evaluating the electromagnetism pollution of environment, we can measure on the spot. to save time, hard work and cost taken by measuring on spot, it is necessary to calculate and analyze the electromagnetic wave propagation in urban area

    在對現有電磁輻射源(如移動通信基、廣播電視發射天線等)環境電磁污染狀況進行評估時可以進行實地,但是對在建或擬建的輻射源則不可能進行先,同時為了避免實地的費時、費力和較大的費用,通過計算機來計算分析城市環境電波傳播顯得很有必要。
  4. You can use the equivalency charts to see exactly how many points you will earn based on your test results

    這是在官方網上的說明,最後一條說:語言結果一定不能比你提交申請的時間早過一年。
  5. They are sulphide and free hydrogen sulphide. from 1989, selected monitoring stations also monitored e. coli and faecal coliforms, which indicate faecal contamination from domestic sewage and animal waste. these two bacterial parameters were extended to all stations from 1999

    自1989年開始,部分河溪監開始監大腸桿菌及糞大腸菌群以顯示住宅污水及動物糞便所造成的水污染其後在1999年起,所有監此兩項細菌參數。
  6. After many years of civil construction and facility renovation, shmp become a modern large enterprise with complete management organization, strong technical ability, sufficient manufacturing facility, advanced procedure, perfect testing method to finish design and manufacturing of heavy equipment for power industries, metallurgy and rolling industries, forging and pressing industries, minery and cement industries, water conservancy, and also high quality heavy casting and forging

    我公司經過多年的基本建設和技術改造,現已成為一個組織管理機構健全,技術力量雄厚,加工設備齊全,工藝手段先進,方法完善,可以獨立設計、製造大型電、冶煉、軋鋼、鍛壓、礦山、水泥建材設備和大型優質鑄鍛件的現代化大型企業。
  7. The way of taking one nth out of capacitor ' s the first harmonic capacitive reactance as its nth harmonic impedance is verified whit the data from tang7c. according to the approximately estimating method, the first harmonic impedance of 220kv system is calculated. on the basis of the models, this paper gives the harmonic equivalent circuit of substation and gives the b ( n ) function of the harmonic time n. when the capacitors has different combination, b ( n ) ' s value will also change, with the inputting local measurement data, the paper studies the series and parallel resonance at the substation, and deduces that the reason the capacitor ' s fuse of tang6c is frequently interrupted is that its capacitor current contains a large number of 5th harmonics, and that the reason the discharging pt of tang7c capacitor being exploded is also that the 7th and 9th harmonic currents are amplified

    據此,對該進行了串聯諧振分析和並聯諧振分析,並結合數據和有關變電的運行記錄,指出了導致該電容器湯6c頻繁燒保險的主要原因是5次諧波電流含量偏高,引起湯7c放電pt爆炸也是因為7次和9次諧波電流被放大。針對這些導致湯陰變電補償電容器故障的原因,提出了相應的諧波治理措施,包括針對湯6c電容器5次諧波電流含量偏高的原因,提出了停運湯6c電容器或者通過把湯sc電容器的部分容量併入湯6c電容器(湯sc其餘部分停運)以增加湯6c諧波承受能力的措施;針對# 2變低壓側7次和9次諧波電流被放大的現象,提出了在湯7c電容器上加裝一定百分比的串聯電抗器的措施。
  8. Spot test and result analysis of a pumping station

    某泵的現場及結果分析
  9. Michael, we ' re just coming into the test ban now. the fact that you ' ve won the last two races, is that a pointer for the future races coming up

    問:邁克爾,我們現在進入了禁令期。你在前兩比賽中的勝利是否是對隨后即將進行的比賽的一個指示?
  10. Q : michael, we ' re just coming into the test ban now. the fact that you ' ve won the last two races, is that a pointer for the future races coming up

    問:邁克爾,我們現在進入了禁令期。你在前兩比賽中的勝利是否是對隨后即將進行的比賽的一個指示?
  11. Y2k test and upgrade for nt servers and workstations

    Nt伺服器與工作之y2k和升級
  12. Test results show that under 2 - tone test in 5mhz tone spacing, the power amplifier system achieves - 50dbc imd3 with 20w output power, improved 20db in imd3 compared with the one without linearity. estimated value of aclr comes to 53db, which satisfies the 3gpp requirement for wcdma base - station transistor. further tests with alterative input power indicate a steady suppression to the imd3 controlled by the adaptive system

    結果表明,自適應前饋功放系統在雙音輸出功率20w時三階交調系數小於- 50dbc ,鄰通道泄漏抑制比( aclr )的估算結果大於53db ,在理論上滿足3gpp對wcdma基發射機的指標要求。
  13. Based on seismic wave method, borehole acoustic method and indoor rock mechanics test, the dynamic and static parameters of the foundation rock for the toe slab of the concrete face rockfill dam for shuibuya hydropower station are tested, and then the relationship among the rock quality, dynamic parameter and static parameter are established with the parameters obtained from the test, furthermore, the classification and the quality evaluation are made as well

    摘要採用地震波法、鉆孔聲波法以及室內巖石力學驗法,對水布埡水電面板壩趾板建基巖體進行了動、靜參數,並根據所獲的參數建立了巖體質量、巖體動力學和靜力學參數三者之間的相關關系,對工程巖體進行了質量分級和質量評價。
  14. This article through installs the reactor with air core in the transformer substation transmission, to control the thunder electric wave amplitude and steepness in the transformer substation ; through over voltage on - line monitoring device testing, inquire into lightning protection of the reactor with air core

    本文通過在變電的輸電線路的出口處加裝空心電抗器,對通過輸電線路侵入變電的雷電波的幅值和陡度進行抑制;並通過安裝過電壓在線監裝置進行的方法,初步探討了空心電抗器防雷的作用。
  15. When you test multiple web sites on your own computer and those web sites do not share a common root directory, you might want to hard - code the path to the web site in each test instead of using the

    當您在自己的計算機上多個網,並且這些網不共享同一個根目錄時,您可能想在每個中硬編碼網路徑,而不是使用
  16. Because in the toy has sufficient, therefore from power cut time stands in the peak body weight 90kg grown - up touches when the place stops, needs at least after the test 70 second above slowly the time of fall, therefore cannot cause the damage to the child

    因為玩具內有充足的空氣量,所以自停電時起在最高點的體重90kg的成年人腳觸地時止,經至少需要70秒鐘的以上的緩緩下落時間,所以不會對兒童造成傷害。
  17. On the day they tested the machine, the temperature refused to budge, and the men took turns standing on the stepladder and dumping buckets of boiling water over the gas canisters

    白天他們在設備,可溫度沒有變化,工人輪流在活梯上將一桶桶污水倒在天然汽灌上。
  18. Opposite of motor test pot of cixi

    慈溪市車輛測試站對面
  19. Focus on production yield rate, test yield review and monitoring ; analyze exceptional process, the reject or complain from customer, improve process to match quality request, establish rework process or claim scrap

    關注製程良率的控制,時時追蹤檢討測試站良率;對生產過程異常,不良品或客戶投訴進行分析,修改更新工藝滿足品質要求,制定返工工藝或提請報廢
  20. Testing site map binding

    測試站點地圖綁定
分享友人