測量標樁 的英文怎麼說

中文拼音 [liángbiāozhuāng]
測量標樁 英文
measuring plug
  • : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • : Ⅰ名詞1 [書面語] (樹梢) treetop; the tip of a tree2 (枝節或表面) symptom; outside appearance; ...
  • : Ⅰ名詞(樁子) pile; pole; stake Ⅱ量詞(用於事情)
  • 測量 : measure; survey; gauge; meter; measurement; measuring; surveying; mensuration; metering; gauging;...
  1. The rule of loads and settlement is concluded from numbers of settlement observation points ’ data. and in actual construction, this rule could be used to prevent immediate settlement under the accelerated load, and also, the serious result of the soil destruction could be avoided. at last, a proper method of settlement computing is derived from the identified rules, which can be used to guide the practical construction work, of course, meeting the compulsory standards of the settlement control well

    採用逆作法施工,現實地解決了、土與筏板接觸面的變形協調關系;通過對、土受荷過程的實際試,得出了、土分擔荷載比例和變化過程,從而為、土的荷載計算提供實際依據;從設置的大沉降觀點中所得到的沉降資料,得出荷載、沉降變化規律,從而指導在實際施工中,防止加載過快而導致速沉,避免由此帶來的土體破壞的嚴重後果;通過沉降規律分析,得出了適用於軟土地區的基沉降計算方法,用於指導實際施工,以滿足沉降控制的強制性準。
  2. Article 323 whoever intentionally damages the boundary tablets, boundary markers or permanent survey indicators along the national border shall be sentenced to fixed - term imprisonment of not more than three years or criminal detention

    第三百二十三條故意破壞國家邊境的界碑、界或者永久性志的,處三年以下有期徒刑或者拘役。
  3. A good many case of approaching excavation are studied in this article, such as the study of infection of be coal mining to the huayingshan tunnel, technology study of strucked tunnels of metro in shenzhen, countermeasure study of tunnel approaching pile foundation of metro in guangzhou, excavation methods optimized of large cross section subaqueous tunnel approaching pile foundation of lrt in chongqing, etc. on the basic of analysing and concluding relative study production all over the the world by the numbers, classification of approaching excavation, partition of approach zone, formula of partition of approaching zone, approach degree and countermeasure grade of generalized approaching excavation of underground works are put forward. general methods studying and trea

    本文結合作者多年來對華鎣山隧道減少壓煤研究、深圳地鐵重疊隧道第11頁西南交通大學博士研究主學位論文技術研究、廣州地鐵公紀區間廣紡聯段鄰施工對策研究和重慶輕軌大坪大斷面車站鄰近基礎淺埋暗挖工法優化分析等諸多近接施工問題案例的研究,在系統分析和歸納總結國內外相關研究成果的基礎上,系統地提出了廣義的地下工程近接施工的分類、分區、分區指表達式、近接度與對策等級概念以及分區、分度準則,給出了研究和解決近接施工問題的普遍方法,如數值分析先行,模型試驗、現場試驗證等。
  4. With the retrospection of the developing course of the bored pile foundation and combining with my practical experience, the paper expatiates upon the design principle of percent of fit of the stone - fill grouted concrete and the main factors of the influence strength target, and the final pile technique introduction of the hollow pile of the stone - fill grouted concrete and the precast prestressed concrete ; baesd on the theory of slurry hydraulics, empirical calculation formulas of the radis and height of diffuse slurry are deduced in this paper ; it analyzes the test pile materials of the hollow pile foundation, such as luoyang yi river bridge and dangwang jian river bridge ; the new technique of the hollow pile, which provides the generalization and application with base materials, expounds its feasibilities, adaptabilities and economy

    本文通過綜合分析國內外鉆孔基礎的發展歷程及研究現狀,重點討論了填石壓漿混凝土空心、預制預應力混凝土空心的成工藝、填石壓漿混凝土的配合比設計原理及影響強度指的主要因素;根據泥漿水力學原理,導得了考慮各種因素的水泥漿液在預填骨料中的流動影響半徑和上升高度;結合河南省洛陽伊河大橋、黨灣澗河大橋工程實踐,討論了填石壓漿混凝土空心基礎的質方法及準;並在此基礎上,深入分析了側、端承載能力,提出了填石壓漿混凝土空心的設計計算理論和方法。最後,論證了空心新工藝的可行性、適應性、經濟性,為大力推廣應用空心新技術提供了可靠的技術資料。
  5. Use level survey to mark the paving design elevation of the cement stabilized macadam with obvious mark on indication piles both sides

    利用水準,在兩側指示上用明顯出,水泥穩定碎石的鋪築設計高。
  6. Based on the data of vertical and horizontal displacements from a certain construction site in cixi city of zhejiang province, the validity of controlling earth - extrusion effects in saturated soft clay ground caused by statically piling was quantitatively analyzed and compared with different technical measures, including reduction of piling rate and installation of stress - relax holes

    摘要根據在浙江省慈溪市某靜壓法沈施工現場所監的地基土位移數據,定分析比較了控制施工進度、設置應力釋放和排水深孔等工程技術措施對減輕飽和軟粘土地基沈擠土效應的有效性,並初步提出了現場地基土位移及其變化速率的監控準。
分享友人