溝鐵 的英文怎麼說

中文拼音 [gōutiě]
溝鐵 英文
crude pig iron; sow iron
  • : 名詞1 (挖掘的水道或工事) channel; ditch; gutter; trench 2 (淺槽;似溝的窪處) groove; rut; furr...
  • : Ⅰ名詞1 (金屬元素) iron (fe) 2 (指刀槍等) arms; weapon 3 (姓氏) a surname Ⅱ形容詞1 (形容...
  1. Laiwu hydrothermal metasomatic iron deposit is located at contact zone of ordovician carbon - ate rock ( majiagou formation ) and late yanshanian diorite or nearby

    摘要萊蕪接觸交代熱液礦賦存於奧陶系馬家組碳酸鹽巖與燕山晚期閃長巖的接觸帶及其附近。
  2. The haizigou bridge located at houyue railway dk62 + 688 in yicheng city, is a double line railway bridge, 88. 5meter in heigh, 370. 32 meter in total length

    海子大橋位於山西省翼城縣境內,侯月路dk62 + 688處,是一座跨越黃土沖的雙線路橋,橋高88 . 5m ,橋長370 . 32m 。
  3. Research and exploration on beneficiation method for mengjiagou hematite ore

    孟家礦選礦方法研究與探討
  4. With the high furnace becoming larger with operation under high pressure and high wind temperature, more stringent requirements are raised for fire - retardant materials

    隨著高爐的大型化以及高壓、高風溫操作,對耐材提出更多更苛刻的要求,針對這一情況,本公司聯合有關科研院校進行技術攻關,開發出新一代出澆注料。
  5. The products are widely applied to lander, branch lander and safety liners of large and medium - sized high furnaces with one - time iron capacity of over 100thousand tons. after rectifying, the iron capacity can be as much as over 300thousand tons

    同時具有抗氧化、耐熱震、烘烤時間短、施工方便等優點,廣泛應用於大中型高爐出、支和安全襯,一次性通量十萬噸以上,經修補后通量可達三十萬噸以上。
  6. Malleable iron pipe fitting ductile iron grooved fitting

    槽管件
  7. Mining practice of residual ore body for open pit slope of shirengou iron mine

    石人溝鐵礦露天邊幫殘留礦體開采實踐
  8. The water was now high in the streams, squirting through the weirs, and tinkling under culverts ; the smallest gullies were all full ; there was no taking short cuts anywhere, and foot - passengers were compelled to follow the permanent ways

    溪流中的水漲高了,在渠里嘩嘩地流著,在暗里叮咚叮咚地響著最小的渠里的水也漲得滿滿的無論到哪兒去都沒有近路,步行的人不得不從路上走。
  9. 300 psi malleable iron pipe fitting

    槽管件1
  10. 150 psi malleable iron pipe fitting

    槽管件
  11. The bread must suffice to remunerate all these labourers, and several others ; such as the carpenters and bricklayers who erected the farm - buildings ; the hedgers and ditchers who made the fences necessary for the protection of the crop ; the miners and smelters who extracted or prepared the iron of which the plough and other instruments were made

    麵包必須足以對所有這些勞動者和其他勞動者付酬,所謂其他勞動者是指建造農場房屋的木匠和瓦匠、為保護農作物而修建圍籬和挖的工人、開采或冶煉製作犁及其他農具所用鋼的礦工和冶煉工。
  12. A raised wire frame should be placed under it with a drain provided in the floor.

    在它的下面應當有一個高出地面的絲網,地板里設有排水
  13. A brick - made fireplace was uncovered on the east side, inside was a trough which contains fragments of burnt coal and iron bars

    東側有一個以磚塊堆疊的方形火灶,其內包含凹槽內可見零星細碎的煤炭與條。
  14. Hundreds of resellers, system integrators, end users as well as medium visited our booth and showed great interests in dsts products

    同時,鼎視通還贏得了遼寧省嶺市政府甘肅省氣象局河北省農業廳北京市門頭教委河北灤河實業集團等用戶的信賴。
  15. Application of smooth blasting in development of vertical shaft of shirengou iron mine

    光面爆破在石人溝鐵礦主豎井掘進中的應用
  16. The practice of air interval charging of blasthole at shirengou iron mine

    石人溝鐵礦的炮孔空氣間隔裝藥實踐
  17. Difficulties and countermeasures of shirengou iron ore mine during conversion from an open pit to an underground mine

    石人溝鐵礦露天轉地下開采中的難點及對策
  18. Discussion on problems in construction during conversion from open cast to underground mining of shirengou iron mine

    石人溝鐵礦露天轉地下開采施工中的問題探討
  19. Study on stability of middle room pillars in southern room shi rengou iron mine in transition from surface to underground

    石人溝鐵礦露天轉地下開采南區房間礦柱穩定性
  20. Based on a directional cast linear charge blasting in meng jia gou mine at 17, 9, 2003, the measurement and results of blasting vibration are fully analyzed

    結合2003年9月16日在首鋼孟家溝鐵礦成功進行的一次條形藥包露天礦揭頂剝離松動大爆破,對爆破地震的測試及結果進行了全面分析。
分享友人