溢水渠 的英文怎麼說

中文拼音 [shuǐ]
溢水渠 英文
overflow channel
  • : Ⅰ動詞(充滿而流出來) overflow; spill Ⅱ形容詞(過分) excessive
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (人工開鑿的水道) canal; ditch; channel 2 [書面語] (車輪外圈)outer wheel3 [書面語](盾...
  1. On the basis of actural engineering projects, discussion is presented of some problems in the design of storm sewer system, such as the decision of design parameters for rainfall reappearing periods and closure multiples, the determination of water - collecting positions, the connecting methods of intercepting storm - sewage system with intercepting main pipes and he calculation of flow capacity of overflow traps

    摘要結合工程實際對雨設計中的設計重現期、截流倍數等設計參數的選擇、雨點位置的確定、截流式合流制管與截流干管的連接方法以及流井流量的計算等問題進行了探討。
  2. The ancient project consists of three major projects, namely the yuzui water - dividing dike, the feishayan spillway and the baopingkou water inlet as well as some sub - project baizhang dike, shunshui dike at erwang temple and renzi dike

    首工程由魚嘴分堤、飛沙堰洪道、寶瓶口引口三大主體工程和百丈堤,二王廟順堤、人字堤等主要附屬工程組成。
  3. Methods of measurement of liquid flow in open channels - weirs and flumes - round nose horizontal broad - crested weirs

    流量測量.第4部分:流堰和斜槽.第4f節:圓端平寬頂堰
  4. To improve the flow pattern and discharge capacity of the spillway of bashan hydropower station, the left guide wall ' s form of the spillway ' s entrance channel is optimized by series of model tests

    摘要為改善巴山電站洪道進流態、提高泄流能力,通過一系列試驗優化了洪道引左導墻頭部曲線型式。
  5. Thus it is very difficult to calculate the spill volume and water quality because they involve many processes such as rainfall, yield runoff of rainfall 、 flow concentration of surface runoff, ground pollutant build up 、 washout, the flow concentration of combined drainage system and cso

    其中,合流制排系統的量、質的確定涉及到降雨,地面產流、匯流,地表污染物的累積、沖刷,污在管中的匯流以及流等多種因素,採用一般方法很難定量計算。
  6. Standard guide for selection of weirs and flumes for open - channel flow measurement of water

    用於明流量測量的流堰和斜槽的選擇的標準導則
  7. It suffered severe pollution in the 1980s from large numbers of expedient connections from factories, raw sewage emanating from nearby squatter huts, and overflows from old and overloaded sewers. all six monitoring stations recorded grades of bad or very bad in the late 1980s and early 1990s

    啟德明於八十年代質嚴重污染,因區內有大量來自工廠的非法接駁排污將污排入明,此外還有附近寮屋排放未經處理的污和負荷過重的殘舊污漏等問題。
  8. The excavation of the right slope of the approach channel for the inlet of the spillway tunnel in heihe water control project has a significant effect upon the construction quality and the cost of the project

    摘要黑河利樞紐右岸洪洞進口引右岸邊坡的開挖方案,是影響該工程質量和造價的突出問題。
  9. Liquid flow measurement in open channels by weirs and flumes. triangular profile weirs

    流堰和槽法測量明中的液體流量.三角形堰
  10. Liquid flow measurement in open channels by weirs and flumes. rectangular braod - crested weirs

    流堰和槽測定明中的流量.矩形寬頂流堰
分享友人