溢水渠 的英文怎麼說
中文拼音 [yìshuǐqú]
溢水渠
英文
overflow channel-
On the basis of actural engineering projects, discussion is presented of some problems in the design of storm sewer system, such as the decision of design parameters for rainfall reappearing periods and closure multiples, the determination of water - collecting positions, the connecting methods of intercepting storm - sewage system with intercepting main pipes and he calculation of flow capacity of overflow traps
摘要結合工程實際對雨水管渠設計中的設計重現期、截流倍數等設計參數的選擇、雨水集水點位置的確定、截流式合流制管渠與截流干管的連接方法以及溢流井溢流量的計算等問題進行了探討。The ancient project consists of three major projects, namely the yuzui water - dividing dike, the feishayan spillway and the baopingkou water inlet as well as some sub - project baizhang dike, shunshui dike at erwang temple and renzi dike
渠首工程由魚嘴分水堤、飛沙堰溢洪道、寶瓶口引水口三大主體工程和百丈堤,二王廟順水堤、人字堤等主要附屬工程組成。Methods of measurement of liquid flow in open channels - weirs and flumes - round nose horizontal broad - crested weirs
明渠流量測量.第4部分:溢流堰和斜槽.第4f節:圓端水平寬頂堰To improve the flow pattern and discharge capacity of the spillway of bashan hydropower station, the left guide wall ' s form of the spillway ' s entrance channel is optimized by series of model tests
摘要為改善巴山水電站溢洪道進水渠流態、提高泄流能力,通過一系列試驗優化了溢洪道引水渠左導墻頭部曲線型式。Thus it is very difficult to calculate the spill volume and water quality because they involve many processes such as rainfall, yield runoff of rainfall 、 flow concentration of surface runoff, ground pollutant build up 、 washout, the flow concentration of combined drainage system and cso
其中,合流制排水系統的溢流水量、水質的確定涉及到降雨,地面產流、匯流,地表污染物的累積、沖刷,污水在管渠中的匯流以及溢流等多種因素,採用一般方法很難定量計算。Standard guide for selection of weirs and flumes for open - channel flow measurement of water
用於明渠水流量測量的溢流堰和斜槽的選擇的標準導則It suffered severe pollution in the 1980s from large numbers of expedient connections from factories, raw sewage emanating from nearby squatter huts, and overflows from old and overloaded sewers. all six monitoring stations recorded grades of bad or very bad in the late 1980s and early 1990s
啟德明渠於八十年代水質嚴重污染,因區內有大量來自工廠的非法接駁排污渠將污水排入明渠,此外還有附近寮屋排放未經處理的污水和負荷過重的殘舊污水管溢漏等問題。The excavation of the right slope of the approach channel for the inlet of the spillway tunnel in heihe water control project has a significant effect upon the construction quality and the cost of the project
摘要黑河水利樞紐右岸溢洪洞進口引渠右岸邊坡的開挖方案,是影響該工程質量和造價的突出問題。Liquid flow measurement in open channels by weirs and flumes. triangular profile weirs
用溢流堰和水槽法測量明渠中的液體流量.三角形堰Liquid flow measurement in open channels by weirs and flumes. rectangular braod - crested weirs
用溢流堰和水槽測定明渠中的水流量.矩形寬頂溢流堰分享友人