溢水道 的英文怎麼說

中文拼音 [shuǐdào]
溢水道 英文
bye channel
  • : Ⅰ動詞(充滿而流出來) overflow; spill Ⅱ形容詞(過分) excessive
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • 水道 : water channel; channel; waterway; watercourse; water carrier; water race; water lane; klong; lago...
  1. There was a touch of spring in the sir, a poisonous, malefic spring that seemed to burst from the manholes

    天氣已有點春天的意思了,一個有毒有害的春天似乎就要從街上的下出入孔出。
  2. Hydraulic model test of spillway in baiyinhua reservoir

    白音花工模型試驗研究
  3. Design of spillway in quting reservoir

    曲亭工程設計
  4. The ancient project consists of three major projects, namely the yuzui water - dividing dike, the feishayan spillway and the baopingkou water inlet as well as some sub - project baizhang dike, shunshui dike at erwang temple and renzi dike

    渠首工程由魚嘴分堤、飛沙堰、寶瓶口引口三大主體工程和百丈堤,二王廟順堤、人字堤等主要附屬工程組成。
  5. The improvement plan for the right bank revetment of the first - step stilling basin for the normal spillway of huangbizhuang reservoir is optimized for many times, which has met the requirements to save the investment, shorten the construction period, guarantee the continuity of the boundary and satisfy the operation of the project at last

    摘要黃壁莊庫正常一級消力池右岸躺坡改建方案經過多次優化,達到了節約投資、縮短工程工期,保證了邊界的連續性,滿足工程運用要求。
  6. Taken the bank spillway at yubeishan reservoir as an example, the water loads acted on the spillway, such as static water pressure, dynamic water pressure, shear stress on the surface of the step and so on, are calculated, which can provide evidence to the stability analysis of the dam slope and slope protection

    並以萬縣魚背山庫岸邊為例,計算了上所受的流荷載及其分佈,為土石壩坡和護面的穩定分析提供了依據。通過計算證實了既使在較大的單寬流量下,緩坡上的階梯仍有較高的消能率。
  7. Taking bench shooting of the shuibuya yihongbao project as example, it makes use of the digital television system of drilling overall - hole wall to actually measure, the testing result of lateral fractural range is 4 - 5m, and that of bottom fractural range is about 3m

    本文試驗工作是以布埡工程梯段爆破為實例,採用鉆孔全孔壁數字電視系統對混裝乳化炸藥爆破破裂范圍進行了實際測試,測試結果為:側向破裂范圍為4 5m ,底部破裂范圍值為3m 。
  8. Research on the jet bucket shape of spillway of lan du water project

    蘭督利樞紐挑流鼻坎體型試驗研究
  9. The test on the hydraulic model of the spillway of shangjiao reservoir in lingchuan county

    陵川上郊工模型的試驗
  10. For floors where abrasion and impact resistance as well as dust - proof are required such as for shed, loading area at port, machinery industry, aitcraft parking apron, garage, parking area, oil storage piant, pathway floor, mine chute, bridge surface, reservior overflow relief channel, energu consumption. loading slope, military industry, weaving mills, cold storage plant, automobile industry, electronic industry express highway, etc

    倉庫、碼頭裝卸區、機械工廠、飛機停機坪、車庫、停車場、油料庫、通地面、工礦溜槽、橋面、、交通池、裝卸斜坡、軍工企業、紡織業、冷凍庫房、汽車工業、電子工業、高速公路等適合金屬骨料要求的混凝土地面。
  11. The structure and flow property of the spillway ' s tortuous path are important to the spillway and even the key water control project

    結構與流特性,對乃至庫樞紐工程都是十分重要的。
  12. The flood resulting from a dam breaking, and opening by break very spillway, and in order to guarantee safe enlarging the outflow of reservoir, spreads quickly and often causes catastrophes

    大壩潰決造成的洪、以破壞方式開啟非常造成的洪以及為保證大壩安全加大庫放流形成的洪,傳播速度快,破壞性巨大。
  13. Study of the high - speed flow through the spillway of the shuibuya water control project

    布埡高速流問題研究
  14. Application of water damage and reinforcement for base plate of flood discharge trough in spillway of guanzhuang reservoir

    官莊泄槽底板毀原因分析與加固
  15. Thought for reducing cost in the procurement administration processing of the spillway project of guanshan reservoir

    關山工程項目采購管理中降低成本的幾點思考
  16. The paper also introduced the applied situation of the actual projects about the t type barrier stilling basin through the helong reservoir spillway ' s hydraulic model experiment

    本文還通過河龍工整體模型試檢,描述了t形墩消力池在實際工程中的應用情況。
  17. To improve the flow pattern and discharge capacity of the spillway of bashan hydropower station, the left guide wall ' s form of the spillway ' s entrance channel is optimized by series of model tests

    摘要為改善巴山電站渠流態、提高泄流能力,通過一系列試驗優化了渠左導墻頭部曲線型式。
  18. There are many main buildings in the plant such as concrete - faced rockfill darn, the second darn with clay core, spillway, diversion tunnel, surge tank, ground workshop and switch mom etc

    電站的主要建築物有砼面板堆石壩、粘土心墻二壩、、引隧洞、調壓井、地面廠房和開關站等。
  19. Reinforcement of spillway slope by anti - slide piles for zipingpu water control project

    紫坪鋪利樞紐邊坡加固抗滑樁施工
  20. In communities where storm drains feed into sewer pipes, heavy rains can cause overflows that dump untreated human waste into rivers, lakes and bays

    在某些社區,雨溝的會流入下,於是豪雨一來,尚未處理的人類排泄物就會出,流入河流、湖泊和海灣。
分享友人