溢流堰水平 的英文怎麼說

中文拼音 [liúyànshuǐpíng]
溢流堰水平 英文
weir level
  • : Ⅰ動詞(充滿而流出來) overflow; spill Ⅱ形容詞(過分) excessive
  • : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
  • : 名詞(較低的擋水建築物) weir
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ形容詞1 (沒有高低凹凸 不頃斜) flat; level; even; smooth 2 (高度相同; 不相上下) on the same l...
  • 溢流 : effluent flow
  • 水平 : 1. (跟水面平行的) horizontal;level2. (達到的高度) standard; level
  1. Methods of measurement of liquid flow in open channels - weirs and flumes - round nose horizontal broad - crested weirs

    明渠量測量.第4部分:和斜槽.第4f節:圓端寬頂
  2. In harsh climate region, mere exists obvious local stress concentration near the upstream and downstream of the exposed - in - winter horizontal surface of the rcc dam, and the surface of spillway bucket though heat insulation is applied on the surfaces, tensile stress still exceeds the allowable one of concrete. this paper puts forward to adopt preset crack to avoid occurring more cracks. the special crack model is applied to simulate the dam preset crack, and the joint model of fracture mechanics is induced into strain - soften model

    在結構措施方面,針對嚴寒地區高碾壓混凝土重力壩壩體越冬層面的上、下游面附近及面反弧段表面有明顯的局部應力集中象現,在已採取一定的表面保溫防護的條件下,拉應力仍然超過混凝土容許拉應力,開裂難以避免,進而提出設置碾壓混凝土壩表面預留縫結構措施並對該措施進行深入研究,包括預留縫的擴展穩定和壩體沿預留縫的穩定性,以避免大壩在無措施部位開裂,解決大壩越冬層面施工縫的開裂問題。
分享友人