溢流閘 的英文怎麼說

中文拼音 [liúzhá]
溢流閘 英文
overflow gate
  • : Ⅰ動詞(充滿而流出來) overflow; spill Ⅱ形容詞(過分) excessive
  • : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
  • : anchor gate
  • 溢流 : effluent flow
  1. This paper introduces the surface forming technology for pocket concrete overflow weir, analyzes and compares construction technique for two types of gate and built - in parts, and presents rating methods for concrete samples when they are less than 30 groups

    摘要現介紹了小型混凝土堰堰面成型工藝,分析比較了兩種門埋件施工工藝,提出了數量不足30組時的混凝土試塊評優的方法。
  2. The analysis show that the project target of detaining the coarse and discharging the fine can be got with the related measures, such as placement of the warping sluice on the concave bank of a bending reach ; arrangement of the overflow weir on a bending reach and reasonable zoning and scientific control of the desilting channels etc

    分析表明,採用將放淤布設在彎道上段的凹岸、彎道設置堰、淤沙條渠的合理分區和科學調度等措施,可以實現試驗工程淤粗排細的目標。
  3. Open - channel, fabricated - metal slide gates and open - channel, fabricated - metal weir gates

    明渠預制金屬滑動門和明渠預制金屬
  4. The result show that the position of free surface is higher because of frusta of brake, especial obvious in the head of frusta of brake ; flux coefficient and pressure on dam are quite influenced by type of frusta and 3 a type frusta of brake relative to 2 type frusta of brake has bigger flux coefficient and smaller pressure on dam ; obvious influence of ability of discharge flow for different ratio of thickness of frusta and breadth of brake and pressure on dam reduces with increasing ration of thickness of frusta and breadth of brake, while bigger flux coefficient is obtained when tlb = 0. 2

    結果表明,墩河海大學博士論文的存在抬高了水面線的位置,其中在墩頭部尤其明顯;墩型對量系數和壩面壓力影響較大, 3a型墩相對於2型墩具有更大的量系數和更小的壩面壓力:不同的墩厚寬比t / b對泄能力也將產生顯著的影響,隨著墩厚寬比的增加,壩面壓力降低,而當t / b二0 . 2時壩具有更大的量系數。
  5. Storm - water overflow chamber

    雨水溢流閘
  6. Stormwater overflow chamber

    雨水溢流閘
  7. ( 6 ) 3d integer model of spillway and frusta of brake are established and numerical computation of 3d viscous flow over spillway is completed. the influence of frusta of brake for design parameters such as shape of free surface, pressure on dam, flux coefficient is computed aim at type of frusta of brake and disposal on dam and compute result of different type of frusta and disposal model is compared

    6 )通過建立壩和墩的三維整體模型,完成了對三維過壩水場的數值計算,針對墩的型式及在壩面的布置計算了墩對水面線形狀、壩面壓力、量系數等設計參數的影響,並將不同墩型與布置形式的計算結果進行比較。
  8. Abstract : the outflow through gate controlled multi - opening spillway of yinhe reservoir was analyzed. the analysis results were checked by the site observed data

    文摘:分析了音河水庫多孔有門控制的洪道出,並用出的實測資料進行了檢驗。
分享友人