滑下管道 的英文怎麼說

中文拼音 [xiàguǎndào]
滑下管道 英文
chute
  • : Ⅰ形容詞1 (光滑; 滑溜) slippery; smooth 2 (油滑; 狡詐) cunning; crafty; slippery Ⅱ動詞(貼著物...
  • : 下動詞1. (用在動詞后,表示由高處到低處) 2. (用在動詞后, 表示有空間, 能容納) 3. (用在動詞后, 表示動作的完成或結果)
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • 滑下 : slipping; sliding; glide; gliding
  • 管道 : [工業] pipeline; channel; tunnel; piping; canalis; pipe run; duct; conduit; conduit pipe; ducting...
  1. Gpr is a newly developed hi - tech survey technique used to detect shallow ground electric differences. we applied gpr to more than 100 projects in zhujiang river delta and hongkong, and obtained good reputations. the application scope involves stratigraphics division, outining of filled stones in the muddly beach, geotechnical prospecting of old wall, karst detecting in the limestone terrain, caving detecting, landslide and slop surveing, the division of wea - thering zone, onion weathering zone, fracture zone and fau - lted zone in the granite area, detecting of buried objects cable, metal nonmetal pipe, channel, air raid she - lter etc. underground in the urban city, archaeology, tracing of orebody, coal measures strata division, testing of the dam and grouting site, quality checking of the surface and foundation of the highway

    的一種高新技術。我公司運用世界最先進的探地雷達設備在珠江三角洲地區和香港開展了百余項探地雷達檢測項目,獲得了良好的聲譽,並被作為深圳市建設局1998年度建設科技成果推廣項目。它主要應用於:山體土石方檢測路基不同回填物界面檢測填海回填物巖溶檢測樁基無損檢測地探測地隱蔽物探測考古斜坡體探測地質結構探測湖底探測高速公路路面及路基檢測。
  2. Steel pipe with wall thickness of three mm and diameter under 100 mm to effectively reduce cutting temperature, prolong service life of blade and improve cutting effect

    每切割兩口,如壁厚3毫米,徑100毫米以的不銹鋼,滴加一至兩滴潤油在刀刃端,
  3. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  4. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  5. Airway remodelling refers to changes in the airway structure and includes subepithelial fibrosis, increased smooth muscle mass, submucosal gland enlargement, neovascularisation and epithelial alterations

    重構指氣結構的改變,包括:上皮纖維化,平肌增厚,粘膜腺體肥大,新生血形成和上皮的變化。
  6. The morphology examination by sem and tem showed that the carbon nanotubes were arranged in the array uniformly and paralleled, with smooth walls, the outside diameter of 120 nm and the inside diameter of 110 nm. from the cyclic voltammetry, the array electrodes in an acidic electrolytic solution had greater capacitance than the case in a neutral electrolytic solution. the specific capacitance of 365 f / g was achieved with the discharge current density of 210 ma / g in the solution of 1 mol / l h2so4

    掃描電子顯微鏡和透射電子顯微鏡對碳納米陣列電極的形貌表徵表明碳納米形狀規整,排列有序,尺寸均勻,壁光,外徑約為120nm ,內徑約為110nm ;循環伏安實驗表明mwnts陣列電極在酸性溶液中比在中性溶液中具有更好的電容性能;根據恆電流充放電法得出mwnts陣列電極在1mol / lh _ 2so _ 4水溶液中,在210ma / g的放電電流密度的比電容可達353f / g ,比目前報的無序碳納米和活性炭電極的比容量都高得多;其它電化學實驗顯示該電極具有很低的內阻和良好的充放電循環穩定性。
分享友人