滑堆構造 的英文怎麼說

中文拼音 [duīgòuzào]
滑堆構造 英文
banking structure
  • : Ⅰ形容詞1 (光滑; 滑溜) slippery; smooth 2 (油滑; 狡詐) cunning; crafty; slippery Ⅱ動詞(貼著物...
  • : Ⅰ動詞(堆積) pile up; heap up; stack Ⅱ名詞1 (堆積成的東西) heap; pile; stack 2 (小山 多用於地...
  • : Ⅰ動詞1 (構造; 組合) construct; form; compose 2 (結成) fabricate; make up 3 (建造; 架屋) bui...
  • : Ⅰ動詞1 (做; 製作) make; build; create; produce 2 (假編) cook up; fabricate; concoct 3 [書面語...
  • 構造 : structure; construction; constructional detail; tectonic; structural; makeup; anatomy; constituti...
  1. Announce according to top people court " about hearing person damages case applicable law the explanation of a certain number of problems " regulation, road, bridge, channel wait for what build artificially to because safeguard, build thing, administrative flaw sends a person to damage ; pile up article boils fall, slide or pile up content collapse sends a person to damage ; arboreous dump, break off or fructification falls send what the person damages to perhaps manage a person to assume liability to pay compensation by everybody, but the exception that can prove oneself do not have fault

    根據最高人民法院公布《關于審理人身損害賠償案件適用法律若干問題的解釋》規定,道路、橋梁、隧道等人工建築物因維護、治理瑕疵致人損害的;放物品滾落、落或者放物倒塌致人損害的;樹木傾倒、折斷或者果實墜落致人損害的由所有人或者治理人承擔賠償責任,但能夠證實自己沒有過錯的除外。
  2. This paper analyses the main geo - ecological environment problems in light of neotectonics, ground subsidence, landslide, collapse, debris flow, groundwater environment evolution, change of land resources, cumulate castoff, etc. in the shenfudongsheng mining district, discusses its influence on the ecological environment

    本文通過新運動、地面塌陷、水土流失、坡、崩塌、泥石流、水環境的演化、土地資源的變化、放的廢棄物等方面系統的分析了神府東勝礦區存在的主要的地質生態環境問題,並探討了它產生的生態環境效應。
  3. The author presume the original physiognomy of jiuzhai valley, and acknowledged changhai valley was a surface - water with uniform waterpower, the rize valley was a branch of it but the inequality rise of lithosphere, the deposit of earthquake landslides debris flows and falling or glacier blocked the river - way, furthermore, the flow water with high content of ca ( hco3 ) 2, so tufa dyke formed and evolvement the present dyke of lakes the present physiognomy formed on the base of those 2

    由於地震、坡、泥石流引起的積物和冰川作用形成的冰磧物堵塞河道,再加上運動成地殼的不均勻抬升,九寨溝的這種獨特的地質環境以及高含ca ( hco _ 3 ) _ 2的巖溶水流作用下,為caco _ 3沉積創條件,沉積的caco _ 3加高、連接最終形成灰華堤壩,使湖泊的形成成為可能。
  4. In this paper, regarding the analysis of stability factors of majiatian tailings fill dam, namely regional geologic structure, rock - soil body of dam foundation, poor geology phenomenon, leach consolidation and chemical consolidation of tailings, seepage water of dam body and king - size flood water of majiatian tailings reservoir, a preliminary demonstration on probability of earthquake liquefaction and seepage failure of dam bodys tailings sand soil, of the dam body failure resulted from abutment landslide and of the flood water overflowing crest, as well as on the contribution of leach consolidation and chemical consolidation of tailings to the stability of dam body has been performed

    通過對馬家田尾礦庫區域地質、庫區不良地質觀察、尾礦淋濾固結和化學固結、壩體滲透水和庫區特大洪水等因素對馬家田尾礦積壩體穩定性影響的分析,初步論證了壩體尾礦砂土的地震液化、滲透破壞、壩肩坡使壩體失穩和洪水漫頂的可能性,以及尾礦淋濾固結和化學固結作用有助於壩體的穩定性。
  5. In this paper, regarding the analysis of stability factors of majiatian tailings fill dam, namely regional geologic structure, rock - soil body of dam foundation, poor geology phenomenon, leach consolidation and chemical consolidation of tailings, seepage water of dam body and king - size flood water of majiatian tailings reservoir, a preliminary demonstration on probability of earthquake liquefaction and seepage failure of dam body ' s tailings sand soil, of the dam body failure resulted from abutment landslide and of the flood water overflowing crest, as well as on the contribution of leach consolidation and chemical consolidation of tailings to the stability of dam body has been performed

    通過對馬家田尾礦庫區域地質、庫區不良地質觀察、尾礦淋濾固結和化學固結、壩體滲透水和庫區特大洪水等因素對馬家田尾礦積壩體穩定性影響的分析,初步論證了壩體尾礦砂土的地震液化、滲透破壞、壩肩坡使壩體失穩和洪水漫頂的可能性,以及尾礦淋濾固結和化學固結作用有助於壩體的穩定性。
  6. The paper describes the main techniques in the integral sliding construction for large span structure, which includes jacking scheme, plan layout, assembly, transport and stacking of components, setting of sliding system, setting of track, conformation of falsework, traction facility etc. discusses emphatically the sliding falsework, which includes the material, conformation, manufacture, welding and assembling of the shape steel tape falsework

    系統分析了大跨度鋼桁架胎架整體移施工中的起重吊裝機具的選擇與布置、施工平面布置、桁架結拼裝單元及移單元劃分、移施工方案及工藝流程、桁架的連接、拼裝運輸、及放、移軌道布置、移滾輪、延伸平臺布置以及移牽引系統等諸多工藝問題。
分享友人