滑移階 的英文怎麼說

中文拼音 [jiē]
滑移階 英文
glide steps
  • : Ⅰ形容詞1 (光滑; 滑溜) slippery; smooth 2 (油滑; 狡詐) cunning; crafty; slippery Ⅱ動詞(貼著物...
  • : Ⅰ動詞1. (移動) move; remove; shift 2. (改變; 變動) change; alter Ⅱ名詞(姓氏) a surname
  • : 名詞1. (臺階) steps; stairs 2. (等級) rank 3. [醫學] (耳蝸的三個螺旋管的任一個) scala 4. [數學] order 5. [地質學] stage
  1. In this paper, high - order accurate weighted essentially non - oscillatory ( weno ) schemes are investigated and their applications in hyperbolic conservation laws are discussed. based on this, a new weno difference scheme which based on dispersion - relation - preserving relation is developed, and representative test cases with this scheme for computational aeroacoustics ( caa ) problems has been implemented and compared in order to test capability of wave capturing ; in addition, weno schemes generally do not converge at high order in the presence of contact discontinuity of euler equations, so a conservative front tracking technique coupling weno schemes and level set method to simulate the translating density profile is presented here, and numerical simulation with this technique for representative test case has been implemented and results show the desired accuracy

    本文研究了高精度加權基本無振蕩( weno )格式及其在雙曲守恆律方程中的應用,在此基礎上作了兩個方面的工作:一是針對高頻聲波問題構造出一種基於保色散關系( drp )的weno有限差分格式,並對計算氣動聲學( caa )問題的代表性算例進行了大量數值實驗,比較了該格式捕捉波數的能力;另外,針對高weno格式在處理euler方程的接觸間斷時精度有所降低的問題,研究了利用界面追蹤技術levelset方法和高激波捕捉weno格式相結合的一種守恆追蹤方法,並且給出有代表性的密度面問題的算例,得到一致高精度的數值模擬結果。
  2. Based on the pull - out tests data between geogrids and expansive soil / sands arranged by the orthogonal table l9 ( 34 ), the following conclusions are reached : 1 ) the displacement - properties of pullout tests depend on the pullout speed. the law of factors " affecting degree, which influences the parameters between geogrids and soils in the pulling - out procedure, is obtained. with the concept of " equivalent pull - out displacement ( x ) " brought forward, the whole process of pull out tests is divided into two process - " main process ( when x 1. 0 ) " and " residual process ( when x 1. 0 ) ", and three stages - static friction resistance stage, slip friction resistance stage, and residual friction resistance stage

    基於正交設計表l9 ( 3 ~ 4 )分別安排了影響因素與土工格柵膨脹土或砂土界面相互作用參數的拉拔試驗數據,獲悉: 1 )拉拔試驗位特性主要取決于影響因素中拉拔速率;通過分析並獲取影響因素對筋土界面相互作用參數的影響程度及其在拉拔試驗過程中的變化規律,提出了當量拉拔位( x )的概念,並據此將拉拔試驗全過程劃分成「主過程( x 1 . 0 ) 」和「殘余過程( x 1 . 0 ) 」 ;且將影響因素對拉拔力或摩擦阻力系數的影響程度分成三段(靜摩擦阻力段、動摩擦阻力段,殘余摩擦阻力段) ; 2 )不同(規范)定義的筋土界面摩擦阻力系數數值相差較大,但影響因素對摩擦阻力系數影響程度及其變化規律不會因不同(規范)定義而受到影響。
  3. On every step, the maximum of the turbulence dissipation rate is at the step tip. because the interaction between the skimming flow and the step tips causes the energy to dissipate continuously, so that the step can have better energy dissipation results

    在每個梯上,紊動耗散率的最大值出現在梯的突角處,正是由於主流與梯突角之間的相互作用使能量不斷耗散,從而使梯具有良好的消能效果。
  4. The safety factors of the most likely sliding paths are 4. 15 and 3. 05 for 9b and 4b respectively at normal water storage level

    另外,壩踵以下14m深度范圍向下游梯式出也是安全系數較小的路徑,但不是控制路徑。
  5. The slip between the concrete slab and the steel girder of complete - shear - connection prestressed steel - concrete composite beams is small enough to justify the assumption of complete interaction between the interface under service load

    按完全剪力連接設計的預應力組合連續梁的界面很小,在正常使用段,可以認為組合截面整體共同工作。
  6. With different clearance value, displacement curves and velocity curves of generalized coordinates as well as slider displacement error curves in a motion period are obtained. these curves are discussed. results show that if manufacturing cost is kept invariableness, in order to improve precision of mould - cuting, fitting precision of joint connecting the crank and coupler has priority to be considered to increase

    採用四rong - kuta法求解連續接觸模型的動力學方程,得到了一個運動周期內運動副間隙取不同值時,各廣義坐標的位、速度曲線和塊位誤差曲線,並通過曲線分析,得出了要提高模切機主切機構精度,在相同加工成本條件下,應優先考慮提高曲柄與連桿鉸接處的配合精度的結論。
  7. In the wavefield - spread area, we uses the phase - shift operator as constraint in frequency - wavenumber field, while beyond the wavefield - spread data, we uses zero point at the ends of phase - shift operator as constraint to take discrete smooth interpolation so that the resulted operator satisfies two - order smooth and the length of this operator can be selected shorter in frequency - space field

    通過離散光插值法,在頻率波數域中,以傳播區內的相運算元為約束,在傳播區外的運算元兩端處以零點為約束,進行離散光插值,使得所得運算元具有二可導性,則其對應的頻率空間域中的運算元就可以取得很短。
  8. In staged construction process, study is primarily aimed at the truss load resistance capacity and flexural performance under construction and design load, combination performances of steel trusses in conjunction with concrete beam, the vertical displacement difference of two steel trusses with different span and their lateral stability, the glide displacement of the steel truss end during construction, the load resistance performance of steel trusses and concrete structure at the designed load, and the extreme limit loads and the breaking appearance of the combined steel trusses

    主要研究了在段施工過程中,鋼桁架在施工荷載及設計荷載下的受力性能和變形能力;鋼桁架與混凝土梁板的共同工作性能;兩榀不等跨鋼桁架在整體受力下的豎向位差及其對結構的作用和側向穩定性;鋼桁架端部在施工段的動情況;使用段鋼桁架及其端部混凝土結構的受力性能;組合鋼桁架結構的極限承載力和破壞形態。
  9. Under the careful retrospection and analysis on the previous and recent experiments about mechanical behavior of nanocrystalline metals performed by almost main investigators, the dislocation and atomic diffusion is believed to contribute hardly to the deformation of nanocrystalline alloy, and a model based on thermal activation process was applied to fit the experimental data of nanocrystalline ag

    結果表明,納米晶金屬ag的不僅具有比粗晶ag高2 - 6倍的拉伸和壓縮強度,而且在大范性形變段顯示了極低的加工硬化和應變速率敏感性。結合位錯理路和非晶合金形變特徵,提出納米晶金屬ag的塑性變形主要由於晶界貢獻。
  10. With the help of this program, this paper does research on the moved backwards of the slide surface, lengthening the anchor section, the soil nail ' s total force, gets conclusion about relations between the soil nail ' s length and the slope ' s grade, height, soil ' s mechanical parameter ; relations between soil nail ' s total force and coulomb soil pressure. with the help of the large multiuse finite element program ansys, this paper analyzes the soil nailing in one - step ' s slopes, in two - steps " slopes, puts the emphasis on the axis force ' s distributing along the soil nail at each rows, the effect of both the excavating mode and the original slope figure to the axis force of the soil nail, the one another effect between the upper - step slope and the nether - step slope in the soil nail ' s axis force, gets conclusion about the design of soil nail at the first low, different slope body is the same with different excavating mode, the original slope figure has more effect to some than others because of the slope body, the reasonably design of the step width in two - steps slopes, the two - steps excavating and retaining has more virtue than the one - step ' s. through soil pressure analysis this paper does research on the differences and the links between the coulomb soil pressure theory and the rankin ' s, the vertical pressure at the slope surface when the slope surface is inclined and the retaining wall is rough, the soil pressure ' s distributing behind the panel, gets conclusion about the effect of both the slope body inner stability and the slope surface local stability to the soil pressure

    通過分析比較,論證了對數螺旋線型比圓弧形作為邊坡的假設裂面具有較多的工程優點,並為此編制了一個採用極限平衡法分析土釘支護的fortran語言程序,以此作工具對裂面的后、土釘錨固段的超長、土釘總力的大小等方面作了研究,得出了有關土釘的長度與邊坡的坡角、坡高、土體力學參數的關系、土釘總力與庫侖土壓力間的關系等結論;採用大型通用有限元數值分析程序ansys分別對採用土釘支護的一邊坡、二邊坡進行分析,重點是研究各排土釘的軸力分佈規律、開挖方式及原始邊坡形態對土釘的軸力的影響、上下邊坡在土釘軸力方面的相互作用,得出了有關第一排土釘的設計問題、不同類型的土體應適用於特定的開挖方式、原始開挖出的邊坡形態對一些類型坡體的邊坡土釘支護有較大的影響而對另外一些影響不大、二邊坡臺寬度的合理確定、二開挖及支護比一時具有較多的工程優點等結論;通過土壓力分析對朗肯、庫侖兩種經典土壓力理論的區別與聯系、坡面傾斜及墻背有摩擦時的坡面豎向應力分佈、面板背土壓力的分佈形態作了研究,得出了邊坡支擋土壓力受坡體內部穩定與坡面局部穩定兩個方面的影響、土釘支護面板背土體中卸荷拱的存在對面板受力有利等結論。
  11. Assessment of second - order velocity - slip boundary conditions of the navier - stokes equations

    方程二速度邊界條件的檢驗
  12. Based on the reynolds " lubrication approximation, the small parameter method is introduced to approximately analyze velocity field and stress distribution between the two parallel disks with an interstitial second - order fluid. 3. squeeze flow between two parallel plates of a bingham fluid with partial wall slip is considered

    以reynolds潤理論為基礎,採用小參數法研究了存在時兩剛性圓盤間二流體的擠壓流動,導出了流體的速度場和壓力分佈,進而求出圓盤間擠壓力的解析表達式。
  13. Based on the reynolds " lubrication approximation, and utilizing the small parameter method, the velocity and the pressure equations for two spheres translating normally and tangentially with an interstitial second - order fluid are derived for modeling wet granular assembles using the discrete element method. as a result, analytical solution for the tangential force and the torque were obtained

    採用reynolds潤理論和小參數法等研究了存在填隙二流體時兩球法向及切向運動時的運動,位及壓力分佈規律,從而求出擠壓力或切向阻力、阻力矩的解析解。
  14. The results show that in the later stage of the nucleation process, the maximum slip velocity is monotonically accelerating ; the slipping hot spot ( where the slip rate is maximum ) migrates spontaneously from a certain instant, and such migration is spatially continuous ; when the maximum velocity reaches a detectable order of magnitude ( at least one order of magnitude greater than the loading rate ), the remaining time is 20 hours or more, and the temporal variation of slip velocity beyond this point may be used as a precursory indicator ; the average slip velocity is related to the remaining time by a log - log linear relation, which means that a similar relation between rate of microseismicity and remaining time may also exist ; when normal stress variation is taken into account, time scale of such processes can be extended by about 2 times

    結果表明,在成核的後期段:最大位速率單調加速增加;動熱點(最大動速率處)在後期段開始自發性遷,且在空間上連續;當最大動速率達到可以明顯探測的量級時(高於載入速率一個數量級以上) ,倒計時間為20小時或更長一些,這時的速率變化可作為臨震預測標志;平均動速率與倒計時間的關系在臨震段呈對數線性趨勢,由此可推測微震活動增長率與倒計時間同樣存在對數線性關系;正應力的變化對上述時間尺度有延長作用,使之大致增加到原數值的2倍。
  15. In this paper, a reasonable and feasible method of test measurement and analysis about the bond - slip properties of src eccentric loading columns was firstly presented. based on the former test of our research group, " the embedded electronic steel - concrete slip transfer " ( patent authorization no. zl - 02 - 2 - 61881. 3 ) was manufactured and exploited phasely, by which the interior slip between the steel shape and concrete along the embedment length could be directly measured, and the most difficult problem of experimental research was consequently solved. all these provided a basis for the further study on the bond - slip properties of src eccentric loading columns

    本文首先提出了一套合理可行的型鋼混凝土偏壓柱粘結性能的試驗測試和研究方案,並在本課題組前期試驗研究的基礎上,研製了內置式鋼?混凝土電子傳感器(專利授權號: zl - 02 - 2 - 61883 . 3 ) ,並進行了段性地研究開發,從而解決了型鋼與混凝土連接面上難以準確測量的關鍵問題,為進一步研究src偏壓柱的粘結性能奠定了基礎。
  16. Squeeze flow of a second - order fluid between two parallel disks with wall slip

    存在時兩平行剛性圓盤間二流體的擠壓流動
分享友人