滯洪工程 的英文怎麼說

中文拼音 [zhìhónggōngchéng]
滯洪工程 英文
flood detention project
  • : Ⅰ動詞(使停滯; 使不流通) stagnate; block up Ⅱ形容詞(停滯; 不流通) sluggish; slow-moving; stagnant
  • : i 形容詞(大) big; vast; grand Ⅱ名詞1. (洪水) flood 2. (姓氏) a surname
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  1. It is difficult to be settled by classical theories because of fixed quality and quantity. this thesis bases on the improvement of traditional way, overcomes its i ack experience, takes the more advanced fuzzy decision - making and optimal selection theory, researches into the established model and gets the result that it ' s best to set pangtoupao storage and detention flood area on the left side of menjiang river by comparing the four schemes and ten objectives of fixed quality and quantity. the result holds identical views with the result of usual economic evaluation. so it ' s the first time using fuzzy decision - making and optimal selection theory to resolve the important and pragmatic problem comprehensively and scientifically

    本文在總結用傳統的方法研究經驗與不足的基礎上,採用目前較先進的模糊優化理論及建立起的模型進行蓄區設置及規模研究,通過對嫩江四個蓄區方案, 10個定性定量目標的優化比選,得出在嫩江左岸設置胖頭泡蓄區最優,其優選結果與採用常用經濟評價方法所得結果基本一致,從而第一次用模糊優化理論較全面科學地解決松花江流域防中確定蓄區規模這一重大實際問題。
  2. Technical code for building and civil engineering in retarding basin

    區建築技術規范
  3. Technical code for constructional engineering in flood dstention basin

    區建築技術規范
  4. A research on decision support system for basin flood control scheduling is presented by a case study of complicated flood control system of downstream basin of the yellow river including reservoir, river channel, flood diversion area and flood detention area in this paper

    流域防系統聯合調度是提高流域防體系防能力的重要非措施,本文以黃河下游包含水庫、河道與分區的復雜防系統為實例進行了流域防調度決策支持系統的研究。
  5. ( 2 ) a series of experiments on time scale distortion are made with real river model, inflow and outflow boundary condition, and continuous simulation. by means of analysis of the experimental data on model water level, water - surface gradient, cross velocity, outflow discharge process and the sediment transportation capacity, the main physical reasons for the above hydraulic parameters deviations caused by time scale distortion are illustrated : response delay of model channel storage capacity and rate of water level with time

    ( 2 )採用真實的河模型和入出流邊界控制條件以及連續模擬的方法進行了有關時間變態率的系列試驗,通過模型水位、比降、流速、出口流量過線和斷面挾沙力試驗資料的分析,闡明了時間變態引起上述各種水力參數偏離的主要物理原因:模型的槽蓄響應和水過時間變化率的響應后。
  6. This thesis concludes the flood control situation, engineering measures and the situation of optimal dispatch method. it studies flood control engineering system, which is composed of flood prevention reservoir, river course dyke and natural detention basin, and the relationship between various flood engineering measures according to the composition and characteristics of the flood control engineering of the middle - lower reaches of beijiang. it suggests the objective function based on the least flood loss and the optimal dispatch strategy structure of the middle - lower reaches of beijiang bound with the requirements of the flood gradual progress equation combined with hydrology and hydraulics

    本論文總結了我國防情勢、防措施及其優化調度方法研究的現狀;針對珠江流域北江中下游防體系的組成及其防的特性,研究由防水庫、河道堤防和天然區共同組成的防體系中各防措施之間的關系;提出了以災損失最小為目標函數、以水文學和水力學相結合的水演進方等要求為約束條件的北江中下游防體系優化調度策略框架。
  7. The engineering of the storage and detention flood area is one of the important flood protection engineering in the songhuajiang river valley. the storage and detention flood area can resolve the flood problem basically in haerbin. at the same time, it works out a solution to the core problem in songhua jiang river valley. the installation has a lot of factors

    是松花江流域內防的重要之一,蓄區能夠基本解決哈爾濱市防問題,同時也很好解決松花江流域防核心問題,而蓄區設置涉及許多影響因素,既有定性,又有定量的,難于用經典理論技術來解決。
分享友人