滲漏測定計 的英文怎麼說

中文拼音 [shènlóudìng]
滲漏測定計 英文
lysimeter
  • : 動詞(液體慢慢地透過或漏出) ooze; seep
  • : Ⅰ動詞1 (從孔或縫中滴下、透出或掉出) leak; drip 2 (泄漏) divulge; disclose; leak 3 (遺漏) le...
  • : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • 滲漏 : percolation; seepage; leakage
  • 測定 : determine; determination; setting-out; admeasurement; assignment; assay; finding
  1. We research the causes of concrete cracking, develop the high performance anti - cracking additive, optimize the concrete mix and construction techniques, increase the stability of concrete volume by shrinkage compensation, enhance splitting tensile strength, and can meet demand of high workability of fresh concrete. in the study, a thorough investigation of this problem is made from all points of view, with the aid of various modern measurement & testing technology and different theories & methods in surface physical chemistry, structural chemistry, solid - state chemistry, composite materials, fracture mechanics, etc. our research results have shown that the various shrinkage of concrete cause concrete cracking in building engineering, such as autogenous shrinkage, dry shrinkage, temperature shrinkage, plastic shrinkage, carbonized shrinkage, etc

    目前,解決混凝土開裂的方法是綜合的,我們調查研究了混凝土開裂的原因,開發研製了高性能抗裂外加劑,優化混凝土的設和施工方法,並通過補償收縮達到混凝土體積穩,提高抗裂強度,滿足混凝土拌和物高工作性能的要求。本研究採用多種試技術,應用表面物理化學、結構化學、固體化學、復合材料學、斷裂力學等多學科的理論與方法,從不同的角度進行深入的研究和探討。通過調查研究建築工程中出現的混凝土開裂、問題,發現混凝土在非荷載作用下開裂主要是由混凝土的自收縮、乾燥收縮、溫度收縮、塑性收縮、碳化收縮等各種收縮變形引起的。
  2. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡水電站超大型地下洞室群圍巖穩的安全可靠性分析:被成都勘研究院應用於比選報告及可行性論證中; ( 2 )小關子水電站攔河閘壩及地基的應力應變分析:被成都勘研究院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措施研究:為廠房壩段並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預預報堤防管涌破壞提供分析軟體; ( 5 )向家壩地下洞室群圍巖穩的安全可靠性分析:被中南勘研究院應用於初步設方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設院的靠船墩優化設和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和穩的三維靜動力隨機有限元分析及可靠度算:為溪洛渡重大工程壩體的靜動力安全穩性及溫控方案提供依據。
分享友人