滲濾計 的英文怎麼說

中文拼音 [shèn]
滲濾計 英文
diffusiometer
  • : 動詞(液體慢慢地透過或漏出) ooze; seep
  • : 動詞(除去液體雜質) filter; strain
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  1. Leachate generation of solid waste sanitary landfill

    垃圾衛生填埋場液水量
  2. A brief introduction is given to the treatment of the zeya dam foundation, principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir. as for the excavation of the sand - gravel zones, except the toe slab and its 1 / 9 bottom width down stream, the alluvial layers are excavated to the micro - weathered rocks, while the other sections remain unexcavated. regarding to the treatment of the fracture zones, concrete filling is used for the toe slabs and semi - permeable materials are used for other section. according to the construction characteristics, a filter is placed in the down stream embankment foot. to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted. as a result safety, economic benefit, convenience in construction and good performace are achieved

    簡要論述澤雅水庫面板堆石壩壩基處理和防的原則及設要點.趾板基礎和堆石體各區砂礫石基礎開挖,除趾板與其下游1 / 9底寬范圍以及壩腳挖除沖積層至弱風化(局部微風化)基巖外,其餘部分均予以保留.斷層破碎帶處理,趾板部位採用混凝土塞,其它部位採用半透水料置換,並根據本工程特點在下游壩腳加設了反層.為提高壩基的整體性和防性能,對趾板進行了固結和帷幕灌漿.達到了安全、經濟、便於施工的目的,運行情況良好,可為面板堆石壩的設和研究提供參考與借鑒
  3. The lfg collection and utilization is company know how that is demonstrated at a site in meizhou, guangdong province that currently collects 2000 m3 hr of gas and treats all the leachate from the site, 2 mw electrical power plant will be installed on the site to utilize the collected gas soon

    該技術在中國梅州市進行了試點,現回收沼氣能力為2000立方米小時,同時循環處理該填埋場的全部液,並劃近期在該填埋場建設裝機容量2兆瓦的發電廠,使用回收的沼氣發電。
  4. Through the research of crosslinking of matrix resin, heating treatment of composite and mixing of different polymer, we draw some conclusions : 1 、 percolation theory can explain the phenomenon of the jump of resistance when the content of cb reach a critical volume ; 2 、 based on ohm conduct theory, abounded to the percolation the wbibull statistical theory and other theory, an adapted theory was obtained to explain the jump of resistance and the other phenomenon ; 3 、 the ntc phenomenon was eliminated by crosslinking the matrix of conductive composite, at the same time the stability of composite was improved

    通過對基體樹脂的交聯、復合材料的熱處理、聚合物共混物的研究得出了如下的結論: 1 、理論能夠很好的解釋導電粒子含量達到某一值時電導率劇增的問題; 2 、在歐姆導電模型的基礎上,綜合應用了weibull統理論模型,結合原來的體積膨脹等理論,成功的解釋了ptc復合材料在基體材料熔點附近的跳變問題、 ntc現象以及熱循環穩定性等問題; 3 、有機ptc導電復合材料經硅烷交聯以後能夠消除ntc現象,改善了導電復合材料的穩定性能。
  5. Practice during the period of four years shows : ( 1 ) settled water pond and three - stage filtration system with mechanical agitation can meet the requitments of reverse - osmosis components to the inlet water quality ; ( 2 ) it must be considered in the design that the demineralization efficiency of reverse - osmosis components will be decreased about 1 % 2 % in every year ; ( 3 ) in normal case, the outlet water from reverse - osmosis equipment shall enter into mixed bed via a decarbonator ; ( 4 ) the output capacity of the mixed bed must have a sufficient surplus, to avoid its influence on the water supply

    經4年的實踐表明: ( 1 )採用機械攪拌澄清池和三級過的系統,可以達到反透組件對進水水質的要求; ( 2 )反透組件的脫鹽率每年約降低1 % 2 % ,在設中必須考慮; ( 3 )一般情況下,反透裝置的出水應經過除碳器再送入混床; ( 4 )混床的出力必須有足夠的余量,以免影響供水。
  6. Storage volume sizing for landfill leachate - recirculation systems

    垃圾填埋場液回灌調蓄池的容量設方法
  7. To solve the problem that the water quantity can not be calculated correctly, the following researches were made : ( 1 ) discussing the properties of the on - site experimental seepage flow field of one infiltration diversion project guided by the basic theory of groundwater flow in porous media

    本論文針對取水工程中水量算不準確這一問題,進行了如下的探討和研究: ( 1 )結合某取水工程現場模擬試驗,並以多孔介質地下水流的基本原理為指導,對試驗的流場特徵進行分析。
  8. Design and management of floating bio - bed subsurface infiltration system for campus sewage treatment

    地下聯合工藝處理校園污水的設與管理
  9. The department has also made available another set of guidance notes in respect of the design of appropriate septic tanks and soakaway systems, for reference by works agents responsible for the design and installation of such facilities

    此外,環保署另備有一套化糞池及系統的設指引,供負責設及安裝工程的人士參考。
  10. Through those approaches and with the information of the particles morphologies, it was possible to predict the percolation threshold of the nanocomposite

    通過這些理論手段以及利用石墨薄片外觀形態上的信息,可很好地估體系的閾值。
  11. After that, reducing the volume of waste requiring final disposal - the point at which waste to energy incineration can play a part - and ensuring that disposal is carried out in landfills which are designed and managed to contain and treat gases and leachate to complete the strategy.

    我們接著須減少需要棄置的廢物體積,而在這階段廢物焚化能源回收正好發揮作用。最後,我們得確保廢物乃棄置在設及運作上適合容納及處置氣體和污水的堆填區內。
  12. The wider soil core and wider filter has been used in design to solve the seepage stability question and the good seepage prevention result has been got

    採用肥心墻加厚反的型式,解決了透穩定問題,達到了防效果。
  13. Calculating the average circular - capillary - equivalent pore diameter in filter media from measurements of porosity and permeability

    用測量孔隙率和透率的方法算過器介質平均循環毛細當量孔徑
分享友人