滾動計劃規劃 的英文怎麼說
中文拼音 [gǔndòngjìhuàguīhuà]
滾動計劃規劃
英文
rolling wave planning- 滾 : Ⅰ動詞1 (翻轉; 滾動) roll; turn round; trundle 2 (走開; 離開) get away; beat it 3 (液體沸騰)...
- 計 : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
- 劃 : 劃動詞1 (撥水前進) paddle; row 2 (合算) be to one s profit; pay 3 (用尖銳的東西在別的東西上...
- 規 : Ⅰ名詞1 (畫圓形的工具) instrument for drawing circles 2 (規則; 成例) rule; regulation 3 [機械...
- 滾動 : roll; trundle; rolling; volution; run; rolling motion滾動半徑 rolling radius; 滾動傳感器 roll sen...
- 計劃 : 1 (工作、行動以前預先擬定的內容和步驟) plan; project; programme; device; devisal; design 2 (做...
- 規劃 : 1 (比較全面的長遠的發展計劃) planning; programming; project; schematization; programme; plan 2 ...
-
Aiming at the compensation benefits calculation combined with development layout of the yellow river mainstream cascades is now taken into account the dynamic characteristic of different level years, the compensation benefit simulation model of the yellow river mainstream cascade reservoirs is adopted to calculate the power generation compensation benefits of the yellow river upstream run - of - river power stations in three level years of 2000, 2010 and 2020
摘要針對以往補償效益的研究都是靜態計算而言,本文結合不同水平年黃河幹流梯級的滾動開發規劃,考慮不同年代補償效益的動態特性,採用黃河幹流梯級水庫補償效益的模擬模型,計算了2000 、 2010以及2020三個水平年黃河上游徑流式梯級電站的發電補償效益。Referring to rolling window theory, the robot path planning algorithm based on the information of sensors is studied. it can insure the robot arrive at the destination safely in globally unknown environment, especially with moving obstacles. the algorithm ’ s efficiency is validated by simulation results
借鑒滾動窗口的原理,設計了基於傳感器信息的實時路徑規劃演算法,保證機器人在未知動態環境下藉助傳感器信息能夠安全地到達目標點,利用模擬驗證了其有效性。8. since the existing production plan of discrete processes or continuous processes ca n ' t meet the demand of hybrid processes, a four - staged planning method that may be used to generate operation plan of hybrid process is brought forward. 9. taken northwest zircotube co. ltd as an example, the schedule system of this hybrid process is researched and implemented successfully
由於混合型生產過程的特殊性,使得無論是離散型還是連續型的生產控摘要制方式都無法滿足要求,因此,本文應用「年、季(月) 、周、日(班) 」四級計劃控制方式,這種控制方式遵循「時間分段滾動、規劃分層決策」的原則,並採用多級自動反饋機制。( 2 ). wbs is an important basis in project management and a necessary clue of activity chain. taking the aim and function of the srttep plan as a starting point in consideration, with the introduction of the prearranging ideas such as concept design, detailed design and rolling design, the thesis puts forward project working structure resolving method based on wbs three - class model, thus realizing the working structure resolution by using gradually - deepened gradation model and laying foundation on better plan, staff disposition and budget plan
( 2 )項目工作結構分解( wbs )是項目管理的重要依據和活動鏈接的必要線索,本文從川塔施建工程項目工作計劃的目的和作用出發,引入概念設計、詳細設計、滾動設計的事前規劃思想,提出了基於wbs三級模型的項目工作結構劃分方法,利用逐級深入的層次模型實現項目的工作結構分解,為項目進一步的進度計劃、人員分配、預算計劃奠定了堅實的基礎。分享友人