滿負荷運行 的英文怎麼說

中文拼音 [mǎnyùnháng]
滿負荷運行 英文
full-load operation
  • 滿 : Ⅰ形容詞1 (全部充實; 達到容量的極點) full; filled; packed 2 (滿足) satisfied; contented; conte...
  • : Ⅰ名詞1 (負擔) burden; load 2 (虧損) loss 3 (失敗) defeat Ⅱ動詞1 [書面語] (背) carry on th...
  • : 荷名詞(蓮) lotus
  • : Ⅰ動詞1 (物體位置不斷變化) move; revolve 2 (搬運; 運輸) carry; transport 3 (運用) use; wield...
  • : 行Ⅰ名詞1 (行列) line; row 2 (排行) seniority among brothers and sisters:你行幾? 我行三。where...
  • 負荷 : [電學] load; charge; weight
  • 運行 : move; be in motion; run; working; machine run; operation; corotation; propulsion (影片)
  1. The test shall demonstrate to the satisfaction of the owner that the equipment meets all specified performance criteria, is properly installed and anchored, and operates smoothly throughout the specified speed range without exceeding the full load amperage rating of the motor or excessive motor heating

    測試應該讓用戶滿意,證明這些設備符合所有規定的性能標準,經過正確的安裝和錨固,在額定轉速范圍內平穩,沒有超過電機的額定滿轉電流安培數,或發生電機過熱。
  2. When cooling load is less than ice - melting ability, optimal control strategy is just ice priority, optimal control saves 24 - 45 % operating cost compared with chiller - priority. when cooling load is more than ice - melting ability but still less than ice - melting ability plus half of chiller cooling ability, optimal control is to keep chiller load to half of chiller cooling ability and tune ice - melting to meet load, optimal control consumes 13 - 20 % more power but saves 9. 2 - 11 % operating cost compared with chiller - priority. when cooling load is more than ice - melting ability plus half of chiller cooling ability, optimal control is just ice - priority again, optimal control is to keep ice - melting to maximum and tune chiller to meet load, optimal control consumes 0 - 13 % more power but saves 0 - 9. 2 % operating cost compared with chiller - priority

    在冷大於融冰供冷最大功率時,又分兩種情況:總冷小於融冰供冷最大功率加一半的單主機滿時,優化控制是保持主機供冷系數為0 . 5 ,通過調節融冰來改變冷,此時與主機優先比較增加能耗13一20 % ,節約費達9 . 2一11 % ;在冷大於融冰供冷最大功率加一半的單主機滿時,優化控制就是融冰優先,通過蓄冰槽滿負荷運行,調節製冷主機來調節冷,此時比主機優先控制僅增加能耗o一13 % ,但能節約費o一9 . 2 % 。
  3. The traditional refrigeration system in containers adopts the mode of invariable revolution, and its system design is based on what can match the biggest heat load. so the refrigeration compressors and cooling fan motors have been chosen according to their biggest cool and heat burthen in working conditions

    傳統的冷藏集裝箱製冷系統一般採用恆定轉速方式,在設計系統時,以能夠滿足最大熱為依據,製冷壓縮機和冷風機選型的根據是最大冷、熱工況。
  4. With the load sharply increasing in recent years, the beijing electric network often runs over - load and the lack of power in summer and winter sometimes appears

    近幾年,北京電網的增長非常快,高峰期電網經常滿或超,夏季和冬季缺電和供電不足的現象也時有發生。
  5. “ we are bursting at the seams. you can see the fatigue on the bankers ' faces, ” the head of investment banking at a leading wall street bank said

    一家主要華爾街銀的投業務主管表示: 「我們在超轉。銀職員們滿面倦容。 」
  6. The height of media 、 the ratio of gas to liquid 、 hydraulic loading 、 the organic and ammonia loading of influent are the key factors influence the performance of one - stage aerobic baf. the conclusions of the experiment are as following : the best height to remove the organic matter and ammonia is at 60cm 、 120cm from the influent side respectively. the best ratio of gas to liquid is 3 : 1 4 : 1 ; the organic and ammonia loading of influent have litlle influence on the performance of one - stage aerobic baf when the concentration are low ; whe the ratio of gas to liquid is 3 : 1, the ammonia loading is blow 0. 87kgnh _ 4 ~ + - n / m ~ 3. d, the enfluent concentration of ammonia is blow 5mg / l which satisfies the water reuse standard ; at different organic loadings, the removal of organic matter keeps 35 % 45 %. hypothermia is unfavourable to nitrification for one - stage aerobic baf to removel ammonia, the influent concentration of ammonia can ’ t satisfy the water reuse standard

    試驗表明:對有機物的去除主要發生在進水端60cm內,對氨氮的去除主要發生在進水端120cm內;曝氣生物濾池的最佳氣水比為3 : 1 4 : 1 ;在進水有機物和氨氮濃度比較小時,水力對其去除率影響不大;在氣水比為3 : 1 ,進水氨氮小於0 . 87kgnh4 + - n / m3 (濾料) ? d時,出水氨氮小於5mg / l ,滿足回用水的要求;在不同有機下,有機物去除率保持在35 % 45 % 。
  7. 464 we have planned to finish the adjustment of the machine before tuesday

    我們應該漸漸地增加壓縮機的壓力,並逐步投入滿負荷運行
  8. This paper involves qualitative analysis to inclined belt conveyor for gantry bucket wheel stacker - reclaimer. the component structures and working characters are improved, accomplishing full load operation of the stacker - reclaimer

    摘要通過對門式斗輪堆取料機斜升帶式輸送機的定性研究分析,從改變部件結構和部件工作特性人手,對其進了改進,實現了門式斗輪堆取料機的滿負荷運行
  9. Despite the fact that, with over 40 million passengers passing through it each year, it is now running at almost full capacity, it is still a very easy airport to navigate

    盡管這里每年有4000多萬的客流量,目前幾乎是在滿轉,但這里仍是一個非常便於通的機場。
  10. Since the air leakage rate of the air preheaters in waigaoqiao 900 mw units is too high, and the opening of the primary fan stationary blades can not meet the requirement of the unit loads, a retrofit was carried out for the air preheater sealing system in according to the scheme proposed by alstom germany

    摘要針對外高橋900mw機組空氣預熱器漏風率偏高、一次風機靜葉開度不能滿足機組要求這一影響機組的安全性和經濟性的問題,依據alstom德國公司提出的改進方案,對該空預器密封系統進了改造。
  11. The test results showed, that the test method accorded with the requests in engineering tests, that bearing vertical and horizontal loads can be tested in real - time

    試驗結果表明:該方法滿足工程測試要求,能實時測試各支承及其變化,可用於現場進汽輪發電機組軸承在線監測。
  12. The main problems existed in the measured buildings conclude : low energy efficiency plants, low eer when the cooling load decreased during the night period in hotels, bad management, dissatisfied indoor air quality, low efficient water system and so on. if we can avoid these problems, a lot of energy can be saved

    重慶市公共建築主要存在的問題有:設備效率達不到額定值,冷水機組冷量配備過大,酒店在夜間低時空調系統能效比( eer )很低,室內環境很不令人滿意,水系統輸送效率低下,跑冒滴漏現象嚴重,管理混亂等。
  13. It put out the system requirements from the whole structure, function structure, developing mode, user management, the design of software and database, safety design, system running efficiency, developing plan, etc. it put out the basic graphics operation, the module building and editing of the electrical network, the devices records and function management the devices operating management, the function producing the electrical subject chart, the outside interface function, the in - out function and webgis, etc. it discusses some advanced functions including the theory loss and practical loss computing of the distribution line, the reliability basic data producing and conversing tools, power cut management, the load supplying from other ways, the repairing management on user fault reports, th e new load installing assistant function, the management of hanging the cards and simulating operation, the monitonng and analyzing management of the running information, load monitoring and load density analyzing function and so on

    從系統總體結構,功能結構,開發模式,用戶管理,軟體和數據庫設計,安全性設計,系統效率,開發計劃等方面滿足了系統的總體要求;系統實現了基本圖形操作,電網建模與編輯,設備臺帳及管理,設備操作管理,電力專題圖生成,外部介面,輸入輸出, web - gis等基本功能;系統還具有配電線路理論線損計算及實際線損計算,可靠性基礎數據生成和數據轉換工具,停電管理,轉供功能,用戶報修管理,用戶報裝輔助,掛牌管理和模擬操作,信息分析監控管理,監控及密度分析等高級功能:並能從方式,用戶權限,日誌三個方面闡述本系統的管理方式。系統總體結構合理,功能及介面齊全,配置擴展方便,可操作性強。
  14. So relay protection ca n ' t detect fault. this is likely to burn transformer if do n ' t take any measures after turn to turn short - circuit

    繞組匝間短路后仍然能帶滿繼續,但是如果不採取相應的措施,故障將會進一步擴大,嚴重者至燒毀變壓器,造成巨大的經濟損失。
  15. The feeder reconfiguration for loss minimization in distribution systems is realized by changing the status of sectionalizing and tie switches. however, there are many switches in a distribution system. so it is difficult to construct a mathematic model of the relationship between the loads and the switch states with the minimum losses directly

    滿足各種約束條件下,以網損最小為目標的配電網重構問題是個典型的非線性整數組合優化問題,由於開關很多,很難用常規的數學模型直接建立與網損最小時的開關狀態之間的關系。
  16. When start to operate the furnace, raise voltage alowly and gradually, never give full load at one time, or the heating element will be damaged by over current impulse

    爐子在開始通電時,要逐步緩慢升壓,不可一次加滿,否則會因沖擊電流過大造成元件損壞。
  17. Additionally, the dry - pit submersible pumps shall operate within the acceptable field vibration limits as established by the hydraulic institute for this class of equipment at all speeds and loads within the operating range specified herein

    此外,乾井潛水泵應該能夠在美國水利協會為這類設備規定的可接受的現場振動范圍內,在本說明書的工作范圍內,以全速、滿正常轉。
  18. Represents solutions to air conditioning system demand of rooms with different functions at the same time, and to the request for cooling capacity and continual operation in air conditioning system of the telecom industrial room, and takes into account the emergency ventilation after gas extinction

    設計解決了多種功能房間對空調系統的需求問題,滿足了電信工藝機房對空調系統容量及不間斷方面的要求,同時考慮了工藝用房在氣體消防后的事故通風問題。
  19. Passing the above - mentioned analysis, in the course of control system designed and control strategies perfected and optimized, a decision reached that the adaptability of unit load and the stability of unit running can be realized in supercritical power generation units

    通過上述分析指出,在超臨界機組控制系統設計和不斷完善優化控制策略的過程中,完全可以更好地滿足超臨界機組對適應性和穩定性的要求。
  20. Abstract : the paper analyzes and diagnoses over load operation of 250 heating furnace fan motor at kungang, so real causes are judged correctly. some correspondent measures are taken to satisfy basically the needs of heating furnace operation and steel - rolling production, and avoid occurrence of the equipment accident

    文摘:通過對昆鋼250加熱爐風機電機過的分析診斷,正確判斷出真正原因,並採取相應措施,基本滿足了加熱爐和軋鋼生產的需要,避免了設備事故的發生。
分享友人