潮位計 的英文怎麼說

中文拼音 [cháowèi]
潮位計 英文
limnimeter
  • : Ⅰ名詞1 (潮汐; 潮水) tide 2 (比喻大規模的社會變動或運動發展的起伏形勢) (social) upsurge; cur...
  • : Ⅰ名詞1 (所在或所佔的地方) place; location 2 (職位; 地位) position; post; status 3 (特指皇帝...
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  1. It makes the deduction on design tidal level process more reasonable than ever. finally, taking into account the observed data of tidal level are much more integrated than observed data of tidal discharge and the correlative relationship are established based on large numbers of samples. then, the sub stage maximum tidal discharges and tidal velocities are obtained according to the regressive equations and the observed tidal level, and the sub stage design maximum tidal discharges and tidal velocities are estimated by way of frequency analysis

    最後,針對橋河段實測流資料短缺而資料相對完整的實際情況,基於大量樣本建立了流量與汐要素的相關關系,利用實測長系列資料得到分期最大流量、流速系列,經頻率分析確定了分期設最大流量、流速。
  2. The methods to evaluate design tidal elements when the data are incomplete or inconsistent are studied in this paper, taking the tidal reach where suzhou - nantong yangtze river bridge will be constructed for example. and the methods of how to distinguish outlier in different parameter estimation methods are studied

    然後以蘇通長江公路大橋橋河段為例,重點探討了非一致資料條件下分期設最高潮位計算、不同的參數估方法下如何判別特大值和不完整資料條件下感河段水文設值的算方法。
  3. According to the result of physical modeling, the regression equation about the decrement of tidal bore height, the percentage of water - resisting area and the distance away from the upstream bridge site is constructed in this paper, the regression equation can be applied in the impact which bridge has on the tidal bore height in qiangtang esturary

    根據模型試驗結果,建立了涌高度的減小值與中橋墩阻水面積百分比和上游離橋址距離的多元回歸方程,可供錢塘江河口建橋對涌高度的影響算參考使用。
  4. Hydrology regime and river channel evolution become complex because of double influences of river flow and tide. there is little appropriate method so far. therefore, when the impact us assessed of water project on flood control, the following aspects should be focused on, river evolution and stability of project - sections, design tidal level, flood - tide combination scheme, pre - project and post - project impacts on river channel, water level and flow condition

    長江河口段為流河段,徑流流的雙重作用使得區域水文情勢、河道演變規律錯綜復雜,開展防洪影響評價研究時,河道演變及工程段穩定性分析,設的分析算,洪組合方案擬定,工程前後對河道及水流態影響的模擬等均是目前尚無十分成熟的方法,需要進一步研究的課題。
  5. On the base of multiple function realization of tidal level forecasting of storm - surge, dyke break flood computation, flood inundation area computation and manpower - material dispatch etc. and using fussy policy - decision method, the flood control policy - decision scheme was determined

    並在實現風暴預報、潰堤洪水算、洪水淹沒面積和人員物資的調度等多種功能基礎上,運用模糊決策方法,生成長興島防洪決策方案。
  6. Application of a calculation method of design tide levels in constructing ports in deepwater areas

    一種設推算方法在深水築港中的應用
  7. In this part, the first work is pretreatment of a numerical model, including creating calculating grids automatically, improvement of the linear boundary technique and so on. the second work is to estimate the siltation of a basin or channel by liu ' s equation. the third work is to build an edbms ( engineering data base management system ) for the result of mathematical model

    其中主要的工作是:其中主要的工作一是數學模型的前處理,算網格自動生成,線邊界法的優化;二是應用劉家駒公式在長江口深水航道治理工程地理信息系統的支持下實現港池、航槽開挖的實時回淤估算;三是將算成果形成gis管理和支持下的工程數據庫系統( engineeringdatabasemanagementsystem ) ,同時嘗試解決時間序列數據如地形沖淤變化,、流速過程的分析、查詢和顯示問題,並實現實時、互動的動態演示及三維可視化。
  8. Based on the materials observed many years at the tidal observatories and the ocean current data measured in the coastal zone and islands in zhejiang province, the characteristics of tides, tidal currents and residual currents are analyzed and processed by harmonic analysis and statistical methods systematically. such research results are compared with those from the numerical simulation to validate the effectiveness of the latter

    本文以多年來沿岸各站觀測資料以及海岸帶和海島調查的實測海流資料為依據,用調和分析和統的方法對浙江近海的實測汐、流和余流特徵進行了系統全面的整理和研究,這些實測數據將作為檢驗數值模擬是否成功的依據。
  9. And used this standard ( large than ex + 3 x x ) to estimate the design sub stage maximum tidal levels using the frequency analysis. an improved method to deduce design tidal level process is put forward, using both designs maximum anneal tidal level and design maximum annual tidal range

    探討了不同參數估方法下如何判別特大值,並用得到的判別標準(大於ex + 3 x )對修正後的分期最高序列進行頻率分析確定了分期設最高。提出了以設年最高和設年最大差共同控制典型過程放大的設過程推求方法,使設過程的推求更趨合理。
  10. Drama rather builts up slowly from banal and routine events like cooking, driving the mini - bus and picking up the kid from school. through these daily life encounters, the movie spontaenously draws you into the diegesis so that you will gradually laugh and cry with the characters as if they are your friends and family members. talking about the theme, just as the cantonese title " mong bat liu " ( literally " hard to forget " ) hints, what the filmmaker wants to convey is to encourage hong kong people to forget the past and embrace the future

    另外,和小津一樣,爾冬升為《忘不了》設了一個很簡樸而寫實故事,情節上一點也不誇張戲劇化,而是刻意從一些生活點滴入手,例如接放學、煮飯、駕車等,劇力往往就在這些細節瑣事慢慢建立,到了后來的戲劇高,就自自然然把觀眾的情緒抓緊,切底地投入于故事之內,和片中角色一起感受樂與悲。
  11. Drama rather builts up slowly from banal and routine events like cooking, driving the mini - bus and picking up the kid from school. through these daily life encounters, the movie spontaenously draws you into the diegesis so that you will gradually laugh and cry with the characters as if they are your friends and family members. talking about the theme, just as the cantonese title " mong bat liu " literally " hard to forget " hints, what the filmmaker wants to convey is to encourage hong kong people to forget the past and embrace the future

    另外和小津一樣爾冬升為忘不了設了一個很簡樸而寫實故事情節上一點也不誇張戲劇化而是刻意從一些生活點滴入手例如接放學煮飯駕車等劇力往往就在這些細節瑣事慢慢建立到了后來的戲劇高就自自然然把觀眾的情緒抓緊切底地投入于故事之內和片中角色一起感受樂與悲。
  12. In the part sea area of the oujiang estuary which has complicated landform, the different ko are adopted in the control equations of flow and salinity process to work out the process of tide level, averaged salinity and the flow field using the invariant flow and the real process of tide level as the boundary conditions. the comparison and analysis among the computed results, the theoretic results and the computed results of two dimensional numeric model in a large area indicate that the model is applicable

    以地形復雜的甌江河口局部海區為例,分別採用給定恆定流以及實際流過程作為邊界條件,對水流鹽度過程採用不同的k _ 0形式進行了算,給出了過程、平均鹽度過程以及流場的逐時算結果,將算結果與相應的理論結果、實測資料以及大范圍二維數學模型的算結果進行了驗證及細致分析,得到了較為滿意的結果。
  13. Power transformer and reactor fittings - part 5 : liquid level, pressure and flow indicators, pressure relief devices and dehydrating breathers

    功率變壓器和電抗器配件.第5部分:液壓力裝置和流量指示器減壓裝置和脫水吸
  14. Comparing the computed values with those of 50 tidal observatories, we find that the computational precision with fine grids and moving boundary are generally higher than that with wide grids or fixed boundary

    沿岸50個算與實測值的比較表明,加入動邊界以後的小區域細網格算較之粗網格以及未加動邊界以前的情況,精度都有普遍提高。
  15. The results showed that the calculation precision of the method is relatively high, and it is reasonable and feasible to use it to determine the design tide levels of constructing ports in deepwater areas

    結果表明:該方法有較高的算精度,用於確定深水築港的設是合理的、可行的。
  16. The calculation method of design tide levels based on a numerical model of tidal current was expounded, was verified by means of real data, and was applied to a real engineering

    文章探討了確定深水築港設的一種方法,闡述了基於流數學模型的設推算方法,用實際資料驗證了該方法。
  17. Second, on the basis of supplementing basic data and investigating the historic tidal level, the design tidal level has been analyzed and calculated. as the result of the comparison between p - iii type frequency curve and gumbel curve, the p - iii curve is recommended

    其次,在插補延長基本資料、歷史考證的基礎上,進行了設的分析算,並分別就採用p -型曲線及gumbel曲線兩種線型適線進行比較探討,推薦採用p -型曲線適線成果。
  18. Focused on assessment & compensation for oil pollution damage from ships in dalian bay, the dissertation first makes a deep analysis of the inflection factors to oil pollution damage and then evaluates respective mathematical model, such as measurement of oil property, general models for diffuse and volatilization of such substances according to the numerical simulation of the tidal dynamics in the water of dalian bay. based on the corresponding oil pollution regulations, the scope and judgment criteria of oil pollution compensation are laid out. respective compensation measurement methods are developed after those of more mature international practice

    文中剖析溢油事故可能造成損害程度大小的影響因素,包括建立石油化學數據庫並將油品特性進行量化及通過對大連灣流和算,建立溢油擴散、揮發模型等;依據現行油污賠償法規,確定油污損害應予賠償的范圍和判定標準;吸收和借鑒國際上相對成熟的評估技術,建立各項損害的賠償算方法;運用visualbasic6 . 0對損害評估部分進行了算機編程實現。
  19. After load fiow study in each sample, distance to static voltage stability boundary is calculated. when static voltage instability will occur, load curtailment with optimum location and amount is executed

    在每個抽樣樣本執行算后,判斷系統距離靜態電壓失穩的距離,當可能發生靜態電壓失穩時,執行切負荷控制措施,尋找最優切負荷置及切負荷量。
  20. When choosing evaluative indexes, we take four aspects of fatalness of sea level rise hazards, vulnerability of land system, socio - economic and ecological vulnerability, and defending ability. we draw the map based on the relief map and the land utilizing map of 1 : 100000 scale, gain altitude values ( range of 1 km 1 km ) and the fundamental data of evaluation in the studied area using the software of mapinfo and socio - economic statistic data

    運用mapinfo軟體和社會經濟統數據,以盤錦市1 : 100000地形圖和土地利用圖作為底圖,獲得地面1km 1km范圍高程值以及評估單元基礎數據,並算出在沒有防護、不同背景、海平面上升不同高度的條件下,遼河三角洲未來海平面上升將淹沒的土地面積、受災人口和經濟損失,以及不同土地利用類型的淹沒面積及相應的經濟價值。
分享友人