潮汐段 的英文怎麼說

中文拼音 [cháoduàn]
潮汐段 英文
tidal section
  • : Ⅰ名詞1 (潮汐; 潮水) tide 2 (比喻大規模的社會變動或運動發展的起伏形勢) (social) upsurge; cur...
  • : 名詞(夜間的潮) tide during the night; nighttide
  • : Ⅰ量詞(部分) section; segment; part; paragraph; passage Ⅱ名詞(姓氏) a surname
  • 潮汐 : morning and evening tides; tide潮汐電站 tidal power station
  1. Study on salinity ' s effect on the sand analysis in the tidal river

    溶解質對泥沙分析影響研究
  2. The water intake and outlet of power plant in tidal river bend is researched by model test with adopting w shaped rippled groove which meets the request of model roughness

    摘要進行了彎道電廠取排水模型試驗,採用w形波紋凹槽方式加糙,使模型糙率達到了模型試驗的要求。
  3. It makes the deduction on design tidal level process more reasonable than ever. finally, taking into account the observed data of tidal level are much more integrated than observed data of tidal discharge and the correlative relationship are established based on large numbers of samples. then, the sub stage maximum tidal discharges and tidal velocities are obtained according to the regressive equations and the observed tidal level, and the sub stage design maximum tidal discharges and tidal velocities are estimated by way of frequency analysis

    最後,針對橋位河實測流資料短缺而位資料相對完整的實際情況,基於大量樣本建立了流量與要素的相關關系,利用實測長系列位資料得到分期最大流量、流速系列,經頻率分析確定了分期設計最大流量、流速。
  4. To analyze the hydrodynamic structure of the estuary, 3d k - numerical model with curvilinear fitted coordinate has developed. the distribution of velocity and turbulent exchange coefficient at different time has obtained and analyzed

    紊流模型對測驗河進行計算,得到特徵時刻該河口的水力要素及垂向紊動混合系數的分佈。
  5. Based on the review of recent advances in surveying and controlling techniques of river models, described in this paper is a new controlling technique, which makes use of a two - way axial - flow pump and a immersion pump to control the up - boundary condition of discharge and the down - boundary condition of water level respectively, with the tidal model of the huangpu river estuary as an example

    在對河工模型量測與控制技術進行回顧的基礎上,以黃浦江河口河工物理模型為例,介紹了流河上邊界採用軸流泵進行雙向流量控制、下邊界採用潛水泵進行水位控制的新技術。
  6. Using the 1 - d rivernet model calculates the water discharge ratio of the two branches and also duplicates the back - flow in the north branch during flood tide. the 2 - d model with a fine grid is applied to the field of flow in the changjiang estuary and the results are well in agreement with the measured flow

    同時利用河網模型對長江口分汊河進行一個月的水流模擬,並獲得了長江口南北支分流比,復演出北支漲時水體倒灌轉流現象,解決了河網模型用於分汊河道水流模擬的問題。
分享友人