澆底 的英文怎麼說

中文拼音 [jiāode]
澆底 英文
jiaodi
  • : 澆名詞(姓氏) a surname
  • : 底助詞(用在定語后, 表示定語和中心詞之間是領屬關系, 現在多寫作「的」)
  1. To pass its threshold was to return to stagnation ; to cross the silent hall, to ascend the darksome staircase, to seek my own lonely little room, and then to meet tranquil mrs. fairfax, and spend the long winter evening with her, and her only, was to quell wholly the faint excitement wakened by my walk, - to slip again over my faculties the viewless fetters of an uniform and too still existence ; of an existence whose very privileges of security and ease i was becoming incapable of appreciating

    踏進門檻就意味著回到了一潭死水之中,穿過寂靜的大廳,登上暗洞洞的樓梯,尋找我那孤寂的小房間,然後去見心如古井的費爾法克斯太太,同她,只同她度過漫長的冬夜,這一切將徹滅我這回步行所激起的興奮,重又用一成不變的靜止生活的無形鐐銬,鎖住我自己的感官。這種生活的穩定安逸的長處,我已難以欣賞。
  2. Used as linings, bottoms in electrolytic cells, smelting furnaces

    高強抗滲注料用於電解槽部,作為阻擋層使用。
  3. There was a big fireplace that was bricked on the bottom, and the bricks was kept clean and red by pouring water on them and scrubbing them with another brick ; sometimes they wash them over with red water - paint that they call spanish - brown, same as they do in town

    有一個大壁爐,下鋪了磚的,這些磚上面可以水,用另一塊磚在上面磨,就擦得於干凈凈,紅紅的。他們間或抹上一種叫做西班牙赫石的紅色顏料,用這個來洗擦,和鎮子上的人家一個樣子。
  4. In the design, the construction measures such as application of shrinkage - compensating concrete, arrangement of spacing layer between the foundation rock and the bottom slab, adding outside waterproof layer, flexible connection between outlet pipe with side - wall, integerated concrete placement of pump seat with bottom slab and design of reinforcement with application of advanced calculation theory are used according to the characteristics of lager span, larger volume and complex loading conditions of the understructure

    針對下部結構跨度大、體積大、受力復雜的特點,在設計中採取多種措施,包括採用補償收縮混凝土、基巖與板間設隔離層、增設外防水層、出水管與邊墻採用柔性連接、機座與板整體注、採用先進計算理論指導配筋。
  5. Put shredded chicken, ham and mushrooms in a bowl, spread the shredded bird nest over them, pour in chicken clear soup

    雞腿絲火腿絲冬菇絲分置碗,上覆燕菜絲,入雞清湯即成。
  6. Bottom pour ladle

  7. This paper introduces the construction techniques of the box girder bottom - formwork making, steel bar handling, and concrete casting, etc., and expounds the applications of these techniques in the two box girder bridges in the 10th contract section of changhan superhighway

    介紹了箱梁模製作、鋼筋加工、混凝土築等施工工藝及其在長邯高速公路第10合同段內的兩座箱梁大橋中的應用。
  8. Three separately managed and marketed companies that manufacture coil processing equipment, ashphalt shingle and paving machinery, and metalforming machines for shaping hollow cylindrical blanks. site incorporates links to detailed information about each company and its products

    -生產聚氨酯設備,產品包括聚氨酯鞋成型機聚氨酯連幫成型機聚氨酯高壓發泡機聚氨酯低壓發泡機聚氨酯彈性體灌注機聚氨酯精密灌膠機聚氨酯注機聚氨酯發泡機組及聚氨酯生產線等。
  9. Wear resistant layer of cylinder and double - layer liner in catalyst creaking apparatus ( without or with tortoiseshell net can be used ), inner liner of carbon monoxide exhaust - heat boiler, pouring at site for furnace roof with high temperature of heating furnace of steel rolling, different forging furnace, resistance furnace, the prefabricated parts can also be made

    催化裂化裝置中的筒體耐磨層及雙層襯里, (無龜甲網和有龜甲網均可採用)及一氧化碳余熱鍋爐的內襯,也適用於軋鋼加熱爐、各種煅造爐、電阻爐的爐頂、爐墻、爐高溫部位的現場注,可製成預制構件。
  10. Hour of gardening in the sun have quite tired me out

    幾小時在太陽下鋤草花已使我十分疲勞了。
  11. Hours of gardening in the sun has quite tired me out

    幾小時在太陽下鋤草花已使我十分疲勞了。
  12. ( 2 ) the stress caused by heat of hydration during construction is mainly distributed in the beams, and girders and stress in slab was smaller ; during service process, the stress caused by difference in temperature in different seasons is mainly distributed in bottom components ; the stress caused by difference of inside and outside temperature is mainly distributed in peripheral components of building ; the stress caused by difference in temperature due to sunlight is mainly distributed in the components exposed to the sun. ( 3 ) the control methods brought forward such as setting the reasonable stripping time reducing cast temperature of concrete setting after - treatment joint inflicting prestress arranging steel for construction requirement and so on are effective and their application may be extended

    在使用期,由季節溫差作用引起的結構內力主要分佈在層構件上;由內外溫差引起的內力主要分佈在建築物外圍構件上;由日照溫差引起內力主要分佈在向陽面的構件上; ( 3 )在施工階段,可採取使用導熱性能較好的模板、合理設計拆模時間、降低築溫度等措施來減小水化熱引起的結構內力;採用設置后帶的措施來減小結構在整體降溫情況下產生的溫度內力。
  13. Low viscosity, easily pourable potting material, with the ability to develop good adhesion to most substrates without the use of a primer, has a long working time and high temperature resistance, cure at elevated temperature

    低粘度,易注的灌封材料,並在不需要塗的情況下能獲得較好的粘接性,操作時間長,耐高溫,需加熱固化。
  14. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  15. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  16. The next this text is based on the appearance theories, according to the characteristics that the temperature dispersion of super thick mass concrete planceer of high - rise building primarily is an even difference in temperature and an even constringency, suppose the level shears are line with the displacement, adopting a big physical volume concrete of planceer in flexibility foundation for plank computing model, from theoretically deducing the difference in temperature of mass concrete contracting should basic formula of dint, and analysis the crack rule and the influence factor of mass concrete temperature contract, and bringing up the theory calculation method about temperature stress of mass concrete and the biggest whole method that sprinkle the length, at the same time according to basic formula of the temperature stress of mass concrete and the concrete construction experience, bringing five technique measures to prevent the temperature crack of mass concrete

    其次本文以唯象理論為基礎,根據高層建築超厚板大體積混凝土承受的溫差主要是均勻溫差和均勻收縮的特點,闡述了大體積混凝土溫度應力理論計算的簡化方法和最大整長度的計算方法,同時根據大體積混凝土溫度收縮應力基本公式和大體積混凝土結構施工經驗,提出了防止大體積混凝土溫度裂縫的五項技術措施。最後本文以廈門郵電大廈3 . 5m超厚板施工為實例,從大體積混凝土溫度應力計算、混凝土保溫材料厚度計算、混凝土配合比的確定,鋼筋工程、模板工程、混凝土的泵送和築以及大體積混凝土內部溫度的監測和後期養護等方面進行了理論應用。
  17. Reinforcements set in the precast slabs lapped with each other at the side of the slabs. in this way, the floor stands loads in two ways. the prestress in precast slabs can improve mechanical performance and meet the demands of large room width in many building structures

    本論文主要研究單向預應力雙向疊合板樓蓋,其以預應力預制疊合板為模,利用板側伸出鋼筋的搭接實現橫向傳力,變單向受力為雙向受力;通過二次築混凝土形成整體樓蓋結構;通過預制板中單向施加先張預應力改善了樓蓋的受力性能,滿足了大開間及不同型式建築的要求。
  18. It has metal - molding workmanship, lower supporting - five - cores system, refrigerant system, upper - model and lower - supporting - cores location system for be controlled automatically. the machine is driven by a hydraulic system

    該機特點是金屬模工藝,抽五片芯,帶有激冷水冷卻系統,並配有上模、下抽芯到位檢測系統,滿足了高度自動化操作條件。
  19. This system is the new type, in which the connection between the special - shaped column and concrete block is stronger than that of frame structure and the dark beams are located and its constructional sequence is brickwork first and placing columns second and concrete blocks are as bottom forms when beams are placing

    這種新型結構形式的主要特點包括:異形柱與砌塊為馬牙槎連接、墻體內含有暗梁、施工順序為先砌墻后柱、梁築時以砌塊為模。
  20. Systemic analyses of the practical engineering have been done. the engineering measures including post - pouring belt, part pier pouring with lock floor at one time and pipe cooling is been thoroughly studied. by applying these measures, the stresses in the concrete change

    針對實際工程混凝土施工需要,著重研究了后帶、部分墩墻和板同時築和布置冷卻水管三種工程措施所帶來的混凝土應力的變化情況。
分享友人