澆梁 的英文怎麼說

中文拼音 [jiāoliáng]
澆梁 英文
shallow beam
  • : 澆名詞(姓氏) a surname
  • : 名詞1 (屋架中架在柱子上的長木) beam 2 (通常也指檁) purlin 3 (橋) bridge4 (物體中間條狀隆起...
  1. The thesis has summarized the development of the oblique - pull bridge, its construction technology and the importance of bridge construction control, then has introduced project general situation, and has narrated detailed regulation, organization construction, the major work and difficult part of this bridge construction control. the following is the key part of this thesis, firstly, it has introduced the experiment work of early stage, structural calculation and its theoretical result : the absolute altitude of each operating mode, the absolute altitude of building mould in each section and the absolute altitude after pouring concrete ; then, it has discussed the method and content of the line shape control of the main beam, actual absolute altitude of building mould is put forward, and it has described the method of structural stress monitoring, how to arrange measure point and collect data, and how to analyze data. it has also narrated the method of rope force detection and structural temperature inspection

    本論文在總結了斜拉橋的發展及其施工工藝,並指出了橋施工控制的重要性之後,簡要的介紹了工程概況,敘述了炳草崗金沙江大橋監控細則、組織機構及監控的主要工作和難點部分;論文的核心部分,在介紹了炳草崗金沙江大橋施工控制與監測工作的前期實驗工作和施工各工況標高、各節段支模標高、注混凝土后的標高的結構計算和其理論計算結果之後,詳細論述了主的標高線形控制方法和內容,實際支模標高的提出,結構應力監控的方法、布點、測讀及其對測讀數據的合理分析方法,索力檢測和結構溫度監測的方法。
  2. ; 1. the trend of the development of burden and light hanging basket in the cantalever construction of continuous rigid frame bridge has been prospected, the roof truss and cable - state composite hanging basket also has been designed by analyzing and comparing with other ones. 2

    對大跨度橋懸臂築施工的各種形式掛籃施工工藝進行了比較和總結,對連續剛構橋懸臂築掛籃施工中重載輕型的發展趨勢進行了展望,提出了一種用於解決重載輕型懸臂築施工的新型桁架斜拉式組合掛籃,並進行了可行性分析計算和設計。
  3. The system is composed with concrete filled cold - formed square steel tube column, the beam with two cold formed c type steel welded together back to back, the slab with profiled - steel and concrete, the beam and the slab joined into composite steel - concrete beam. they all together make up of the bearing members. and the house also includes the light economical - energy sources heatproof walls

    該體系是以冷彎薄壁方鋼管混凝土為柱、冷彎薄壁c型鋼背靠背高頻焊接組成工字型、壓型鋼板上現築混凝土組成組合樓板並與一起構成組合作為承重構件,以輕質節能保溫型墻體作為圍護結構組成。
  4. Statistical analysis of live load on continuous beam bridge of cantilever casting during construction

    連續橋主施工活載統計分析
  5. The successful alternative was the cast-in-place segmental prestressed concrete box girder.

    最後採用的方案是分段現的預應力混凝土箱形
  6. The shear mechanism, failure mode, deformation capacity, bearing capacity and the reliability of the anchored angle steels of the wrapped steel concrete cast - in - site frame typical story exterior joints under the middle and high axial compression ratio ( n = 0. 3, 0. 5, 0. 6 ), the working performance, failure mode, and the shear capacity of top story joints under the crack moment, the hysteresis characteristic and the dissipation energy capacity of the test joints are all analysed based on the 1 / 4 model pseudo - static tests of five specimens of wrapped steel concrete cast - in - site frame exterior joints, which varied in axial compression ratio, distribution of the beam angle steels and the stirrup ratio

    基於上述分析,本次試驗通過五個外包鋼混凝土邊節點1 4比例模型的偽靜力試驗,以柱的軸壓比、角鋼布置形式、配箍率等為主要參數,分析外包鋼混凝土現框架一般層邊節點在中高軸壓比( n = 0 . 3 、 0 . 5 、 0 . 6 )條件下,節點的抗剪機理、破壞模式、變形能力、承載能力和角鋼錨固的可靠性;分析了頂層邊節點在張開彎矩作用下的工作性能、破壞模式和抗剪承載力;分析了試驗節點的滯回性能和耗能能力。
  7. Construction of cast - in - place box beam of dongshengbei interchange bridge

    東勝北互通立交匝道橋現施工
  8. Construction of cast - in - situ concrete for continuous box girder of zhangwei canal bridge in winter season

    漳衛運河大橋現連續箱混凝土冬季施工
  9. Supervisory control of in situ placing cased beam post - tension construction

    后張法施工監理控制
  10. Abstract : constraining moment between winding beam and cantilever beam should be considered when cantilever beam and its complete winding beam are in the case of bearing heavy load, even working carriers. this paper uses the the ory of constraining moment of crossing component to solve this problem, also st ates the calculating theory of constrainging moment, and does deduction of formula

    文摘:鋼筋混凝土懸臂樑上與其整的邊在負荷較重,甚至做為重要承重構件情況下,應考慮邊與懸臂相互之間的約束力矩.本文採用相交構件約束力矩理論來計算解決這一問題,並對約束力矩計算原理進行論述和公式推導
  11. From above analysis, it is proved that, because the internal force distribution of cast - in - situ concrete hollow floor is notably different to that of waffle slabs, designed as grillage beams and reinforced by these results, the technical advantage of this structure may not be exerted sufficiently so that leading to the increase of reinforcement

    通過以上分析證實,由於現空心樓蓋的與肋樓蓋具有顯著不同的內力分佈規律,現空心板按格進行計算並配筋,將不能充分發揮該結構的技術優勢,導致配筋量的增加。
  12. Construction techniques for cast - in - situ box girders of light rail transit with overhead launching gantry traveling on ground tracks

    地面軌道走行式造橋機現輕軌箱施工技術
  13. Construction technique for cast - in - situ continuous hollow - slab beam

    連續空心板施工技術
  14. 4. the side girders, the deck and the lateral beams of the cable - stayed structure are cast - in - place at one time

    4 、金馬大橋在施工過程中採用邊主、橫隔和橋面板三部分分階段一次現
  15. 4. wind load has great influence on construction, but the self error of casting girder and basket load have greater influence, especially, basket falling is directly responsible for the safety of construction

    4 .得到風載對施工期可靠度影響比較大,而已澆梁段的自重偏差和掛籃荷載影響很大,特別是掛籃跌落直接關繫到施工期橋的安全性。
  16. Construction, management and monitoring of suspension girder of bridge over liao river on tianzhuangtai

    田莊臺遼河公路大橋懸澆梁施工測量監測
  17. Summary on installation method of working platform for construction of cast - in - place viaduct girder in urban transit system

    城市軌道交通工程高架線路現澆梁施工作業平臺搭設方法總結
  18. The results indicate that shear resistance of composite beam accounts for 1. 0 ~ 1. 14 times of that of cast - on - site concrete beam

    該分析結果表明,疊合的斜截面承載力是整澆梁的1 . 00 ~ 1 . 14倍。
  19. At the finishing of this paper, the effective identification of designing factors is done and the setting elevation and the cable tension force in next stage are forecasted according to the situation of finished beams. through the forecasting, the constructing state is in coincidence with the designing state. during the bridge construction process, the value of designing parameters are made close to the construction state by means of data collections, optimal controls and detailed analysis of different reasons that caused errors

    最後,根據施工的實際狀態對設計參數進行了有效的識別,並利用灰色理論與預測控制相結合的方法,根據已澆梁段的實際狀況對下一施工段的立模標高和斜拉索張拉索力進行預測,使施工過程中的受力狀態與已確定的合理施工狀態達到一致。
  20. 2. the random nature of load construction is analyzed. according to analyze various factors on change of reliability index, casting girder 、 construction live load 、 concrete intensity 、 wind load 、 construction distribution load deviation and basket falling, which influence on construction reliability of rigid frame bridge with high - pier and large - span, are obtained

    2 .研究了各施工荷載的隨機性,通過分析各種影響因素對可靠指標的變化程度,得到已澆梁段、施工分佈活載、混凝土強度、風載和施工荷載偏差以及掛籃跌落等對高墩大跨剛構橋施工期可靠度的影響。
分享友人