澆築工 的英文怎麼說

中文拼音 [jiāogōng]
澆築工 英文
pourer
  • : 澆名詞(姓氏) a surname
  • : 築名詞(貴陽的別稱) another name for guiyang
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  1. Based on the simulation model theory of temperature and stress fields presented in this article, a large simulating program for high rccd has been developed, which can numerically simulate all kinds of temperature control measures, including water pipe cooling, heat insulating in winter, reducing place temperature of concrete, spraying water brume, and long interval over - watering surfaces overflowing in flood season.

    基於本文提出的溫度場和徐變應力場模擬模型理論,編制了高碾壓混凝土壩的三維有限元模擬計算程序,在程序中考慮了各種溫控措施的數值模擬,包括:水管冷卻、冬季保溫、降低混凝土的溫度、夏季混凝土表面噴水霧、施汛期壩頂面過水等。
  2. The builders poured a solid foundation of cement.

    注了堅實的水泥地基。
  3. ; 1. the trend of the development of burden and light hanging basket in the cantalever construction of continuous rigid frame bridge has been prospected, the roof truss and cable - state composite hanging basket also has been designed by analyzing and comparing with other ones. 2

    對大跨度橋梁懸臂的各種形式掛籃施藝進行了比較和總結,對連續剛構橋懸臂掛籃施中重載輕型的發展趨勢進行了展望,提出了一種用於解決重載輕型懸臂的新型桁架斜拉式組合掛籃,並進行了可行性分析計算和設計。
  4. The system is composed with concrete filled cold - formed square steel tube column, the beam with two cold formed c type steel welded together back to back, the slab with profiled - steel and concrete, the beam and the slab joined into composite steel - concrete beam. they all together make up of the bearing members. and the house also includes the light economical - energy sources heatproof walls

    該體系是以冷彎薄壁方鋼管混凝土為柱、冷彎薄壁c型鋼背靠背高頻焊接組成字型梁、壓型鋼板上現混凝土組成組合樓板並與梁一起構成組合梁作為承重構件,以輕質節能保溫型墻體作為圍護結構組成。
  5. In the paper, not only such factors as reinforcing steel bar, various placing temperature of concrete in case of lift placements, lift thickness, time interval between lifts, the variation of elastic modules of concrete, heat of hydration, the temperature changes of environment but the effect of creep deformation and autogenous volume change on the temperature field and thermal stress field of reinforced concrete face - slab are considered

    本論文在分析中,考慮了鋼筋、混凝土分層、入倉溫度、層厚、施間歇、混凝土彈性模量變化、水化熱發散規律、外界氣溫等因素的變化及混凝土徐變和自生體積變形等因素對面板溫度場和溫度應力的影響。
  6. In the program, the effect of lamination placement, construction interval, elastic modulus change, thermal insulation change, surrounding temperature change, concrete creep and autogenous volume change on thermal stress are considered. and such temperature control measurement as water pipe cooling, heat preservation of the dam surface, the pouring temperature control, the overflow across the dam top during flood season can also be simulated by numerical method

    該程序在編制過程中考慮了混凝土分層、施間歇、彈模變化、絕熱溫升過程、環境溫度的變化、混凝土徐變、自生體積變形等因素對壩體溫度場及溫度應力場的影響,同時也考慮了水管冷卻、壩體表面保溫、控制溫度、施汛期壩頂面過水等各種溫控措施的數值模擬。
  7. In this article, according to heat conduction theory, elastic creep theory and finite element theory, the temperature field and creep stress field in the arch dam during construction and operation are simulated and analyzed by means of three dimensional finite element relocating mesh method, and the distribution law of the temperature field and creep stress field in the arch dam during construction and operation are systematically studied, and according to the construction process of concrete arch dam, the effect of lamination placement, construction interval, elastic modulus change, thermal insulation change, surrounding temperature change, concrete creep and autogenous volume change on thermal stress in the arch dam are also considered

    論文根據熱傳導理論、彈性徐變理論及有限元理論,用三維有限元浮動網格法對拱壩施期和運行期溫度場、徐變應力場進行了全過程模擬分析,較為系統的研究了混凝土拱壩施期和運行期溫度場、徐變應力場的分佈規律,在分析中按照混凝土拱壩施過程,考慮了混凝土分層、施間隙時間、彈模變化、絕熱溫升過程、環境溫度的變化、混凝土徐變、自生體積變形等因素對壩體溫度應力的影響。
  8. In computation the effect of thermal insulation, elastic modulus, creep degree and autogenous volume change along with age, the progress of pouring by layer, work suspension in summer, the change of air temperature, heat preservation, water cooling, and water storage, by stages on temperature field are considered

    計算中考慮了混凝土的絕熱溫升、彈性模量、徐變度和自生體積變形隨齡期的變化以及分層、夏季停、外界氣溫變化、表面保溫、通水冷卻及分期蓄水等因素對壩體溫度應力場的影響。
  9. Based on the construction of the testing section for the lining of jiping main canal in shandong province of south - to - north water transfer project, the main causes of the cracking from the mechanized lining concrete slabs are analyzed from the aspects of foundation treatment, bedding layer placement, quality of the raw materials for the concrete, placement of the concrete, cutting of the hardened concrete and the curing of the concrete, and then the relevant prevention and control measures are pertinently put forward

    摘要結合山東省南水北調濟平乾渠程襯砌試驗段施情況,著重從地基處理、墊層料鋪設、混凝土原材料質量、混凝土、成型混凝土割縫及養護幾個方面分析了機械化襯砌混凝土板裂縫產生的主要原因,並針對性地提出了預防及控制措施。
  10. Monitoring control for cast - in - place cantilever construction

    懸臂中的施監測控制
  11. It is very important that the reasonable creep model is adopted to simulate the deformation of the rockfill dam and the reasonable construction processes are also adoped to decrease the deformation and stress of the face slab

    因此,對于分期面板、分期蓄水的水布埡高面板堆石壩,選用合適的流變模型正確模擬堆石體的變形特性,以便採用合適的施程序減小面板應力變形具有重要意義。
  12. The change of adiabatic temperature rise along with age and the effect on temperature field of dam body made by pouring lift by lift, work suspension in summer and water storage are considered in the analysis

    分析中考慮了混凝土的絕熱溫升隨齡期的變化和分層、夏季停及蓄水對壩體溫度場的影響。
  13. Rcc casting & backfilling work for cw pump house is in progress. excavation forcw channel was stared on april 2

    循環水泵房正在池壁混凝土和基礎回填,前池于本月2日開挖,開挖作正在進行
  14. During the 3d finite element calculation, try to simulate different procedure of the construction ( like sunk well in - filling, main cable erection, box girder hoist, bridge flooring and opening to traffic ). and then, reveal the regulation of deformation and displacement on the foundation and soil during different period. after got these, this thesis put great attention on the analysis of the reason which cause the horizontal displacement of the cable saddle, as well as the regulation of the pressure ' s changing in the soil located on the front side of the sunk well foundation

    在三維有限元計算中,對不同況(沉井充填、錨體、主纜架設、箱梁吊裝、橋面鋪裝以及通車運營)下的施過程作了模擬,全面揭示了各況下錨碇沉井基礎與地基土的變形變位規律,著重分析了影響散索鞍水平位移的因素以及不同況下沉井前測地基土水平向抗力變化規律,並提出了不同深度地基土水平向抗力與水平位移間的擬合關系。
  15. Abstract : in this paper, designs for foundation pit drainage, concrete pouring as well as side wall form, etc in shaft well construction are discussed

    文摘:介紹了豎井施中有關基坑排水、混凝土以及側壁模板等設計問題。
  16. This paper introduces the construction techniques of the box girder bottom - formwork making, steel bar handling, and concrete casting, etc., and expounds the applications of these techniques in the two box girder bridges in the 10th contract section of changhan superhighway

    介紹了箱梁底模製作、鋼筋加、混凝土等施藝及其在長邯高速公路第10合同段內的兩座箱梁大橋中的應用。
  17. The construction techniques for as - cast - finish concrete wall of units no. 15 - no. 18 in right bank powerhouse of three - gorges project was introduced, including measurement mark testing, sheathing board construction, steel bar construction, concrete pouring, and so on

    摘要從測量標識測設、模板施、鋼筋施、混凝土等幾個方面介紹了三峽右岸電站廠房15 ~ 18號機組主廠房墻體清水混凝土墻施技術。
  18. According as distortion harmonious condition of traction cable ' s anchorage on cable - suspended traveler, increasing amount of cable tension during casting concrete was computed, and under every key operating condition of casting concrete, traveler ' s frontend elevations were educed. we seriously controlled wenhui bridge ' s course of cantilever casting concrete by this method, which assured that the bridge ' s construction went on successfully. and then, it was discussed how to simulate the effect of prestressing force in spatial analysis

    根據掛籃前端牽索錨固點處的變形協調條件建立了掛籃上混凝土過程中牽索索力的增加量,並推導了掛籃上混凝土過程中的各主要況下掛籃前端標高的計算公式,對文暉大橋掛籃上混凝土過程中的牽索索力和掛籃前端標高進行了細致地控制,確保了混凝土的順利進行,為整個主梁線形和索力的雙控打下了良好的基礎。
  19. The floodgate dam is completed more than 6 months ahead of time in the original piano it can generate electricity about 500 million kw ahead of time, convert about 100 million yuan. 4

    3 .通過溫控研究,簡化了溫控措施,加大了尺寸,加快了施進度,閘壩竣比原計劃提前了6個月。
  20. This article incorporates with the practice for construction of mass concrete foundation structure of handan big world department store, according to the features in foundation structure design and the conditions of winter construction in this region, introduces micro - expansion concrete mix proportion design, pouring technology for mass concrete structure, the solution of the strengthen joint - strip and post - pouring joint strip in concrete foundation work, and temperature control for mass concrete

    結合大世界商城底板大體積混凝土的施實例,針對基礎結構的設計特點和當地冬季施的氣候條件,介紹了補償性混凝土配合比設計、大體積混凝土澆築工藝、基礎混凝土加強帶和后帶施藝、底板混凝土溫度控制和自動化監測等多項綜合性技術。
分享友人