澆道澆口 的英文怎麼說
中文拼音 [jiāodàojiāokǒu]
澆道澆口
英文
sprue gating-
The research showed that basin is the more important feeding resource than runner in runner type gating system in lost wax casting. therefore, on the basis of the basin as feeding resource, runner and ingate as feeding channel, a new design method for runner type pouring and feeding system in investment casting was developed. the corresponding feeding mathematical pattern and allowable total weight listed for casting cluster with different basin were established after analyzing the practical feeding of basin and the calculating process for design was described in detail
在熔模鑄造橫澆道型澆注系統中,澆口杯是比橫澆道更為重要的補縮源,因此在立足於澆口杯為補縮源、橫澆道和內澆道為澆注補縮通道的基礎上,開發了適用於熔模鑄造橫澆道型澆注補縮系統設計的新設計方法,在詳細分析了澆口杯的實際補縮情況后,建立了相應的數學補縮模式和不同澆口杯的鑄件組許用鑄件總質量表,並具體介紹了設計計算過程。Find the law of the influence from the injection pressure to the filling time and the cavity pressure and make certain of the best filling time, injection time and injection pressure. though the analysis of the flowing velocity and pressure spread of the key position element in the injection parts in different gate position, we forecast the injection parts quality and the possibility injection flaw and its position, optimize the gate position. in this paper, though the research of analogue of the runner system of metal - powder injection molding and the process of injection molding, we get the law of how the injection parameter influence the injection process
在相同的注射條件下,通過分析喂料在不同直徑和長度流道中的流動規律,得到了喂料在流道中的速度場、壓力場和溫度場,找到了流道長徑比的合理取值范圍,並得出通過改變流道設計可實現對現有設備資源充分利用的結論;給出了不同注射壓力下,型腔壓力與充模時間關系曲線和喂料熔體平均充填速度與充模時間關系的曲線,得到了注射壓力對充填時間和型腔壓力的影響規律,確定了最佳的充模時間、注射時間和注射壓力;通過分析採用不同位置澆口注射時注射件關鍵位置單元的流動速度和壓力分佈,預測了注射件的成形質量,或可能產生的注射缺陷及位置,優化了澆口設置。Check sizes of gates, runners and cavity
檢查澆口,流道和模腔尺寸Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units
文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units
介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。As a result of plastic be in melt condition all the time inside mould of hot flow path, goods does not need clip runner, basically be not to have waste treatment, accordingly but managing and much raw material
由於塑料在熱流道模具內一直處于熔融狀態,製品不需修剪澆口,基本上是無廢料加工,因此可節約大量原材料。Based on the new equilibrium solidification theory, the dispersed gate with flat 、 thin and wide rise neck, coupled with cold iron and warming riser, was adopted in the new gating system
經分析主要原因是原工藝熱冒口的冒口頸(內澆道)偏小,且開設的位置不合理,造成內澆道根部存在疏鬆和晶粒粗大鑄造缺陷。The analysis of compound flow, gate size and other critical data can also be supported by the computer
流道、澆口設計等經驗性數據亦從中獲得理論上的分析和支持。Gates and runners are additionally evaluated using this sophisticated software for multi - cavity runs
澆口和流道要用更高級的多模腔流動軟體加做評價。Runner and gate systems
流道和澆口系統The hot runner series makes the plastics in the hot runner from the nozzle of a plastics injector to the inlet of cavity must be always kept at such a molten state by means of heating that you just pick out the product, there is no need for you to take the condensing stuffs from the injection system as the mould cavity is operated
說明:熱流道系列用加熱的方法使從注塑機噴嘴到型腔入口為止這一段流道中的塑料一直保持熔融狀態,在開模時只需取出產品,而不必取澆注系統凝料。分享友人