灌注樁鉆孔機 的英文怎麼說

中文拼音 [guànzhùzhuāngzhēnkǒng]
灌注樁鉆孔機 英文
cast-in-place concrete pile rig
  • : Ⅰ動詞1 (輸水澆土) irrigate 2 (倒進去; 注入) pour in; fill 3 (飲酒; 勉強他人飲酒) drink wine...
  • : Ⅰ動詞1 (灌入) pour; irrigate 2 (集中) concentrate on; fix on; focus on 3 (用文字來解釋字句)...
  • : Ⅰ名詞(樁子) pile; pole; stake Ⅱ量詞(用於事情)
  • : 鉆Ⅰ名詞1. (打眼用的工具) drill; auger 2. (指鉆石) diamond; jewel Ⅱ動詞(用尖物在另一物體上轉動) drill; bore
  • : machineengine
  • 灌注 : pour into; priming; flood灌注機 bottler placer
  1. By the check - out, inspection and measurement to start construction the industrial art to this test pile with the examination between stake body mass and bearing power, made sure the stroke reasonable operation method drilling under the dissolved cavern geology term ; the pier foundation loading test expressed the lading and rub the lading that resistance drag a glazing for of relation, and to the borehole cast - in - place concrete pile in the karst terrain deliver with break the mechanism, the characteristic of bearing power, proceeding the spot test job of the full of result ; the test data expresses the stake side friction resistance to rises with a bat batch terminal friction resistance very important function, the of tip of pile resistance drag occupies the proportion very few

    通過對本次試施工工藝的檢測和身質量及承載力的檢驗,確定了沖擊在溶洞地質條件下的合理使用方法;基承載實驗表明了荷載與摩擦阻力之間的關系,並對巖溶地區的嵌巖的荷載傳遞和破壞理、承載力特性,進行了富有成果的現場測試工作;試驗數據表明側摩阻和支盤端阻起很重要的作用,端阻力所佔比例甚少。這與設計基時的計算模式相差很大,承載力也較設計增加;使用力學數值分析方法和有限單元法,對端下的巖體強度和結構穩定性方面進行模擬計算和定量研究。
  2. The major diameter filling pile drilling machine of qj250 - 1 type applies to major diameter bridge pier hole of various geologic conditions such as ravelly ground, clay loam layer, sandy gravel, breaking layer and lithosphere as well as other various major diameter pore forming construction

    1型大直徑灌注樁鉆孔機適用於鬆散地層、粘泥層、砂礫層、破碎層和巖石層等多種地質條件的大直徑橋,以及其它各種大直徑成施工。
  3. Abstract : this article discusses the formation of the drilling rig platform, selection of the hole forming equipment and treatment of some incidents occurred during the construction of the bored pile foundation of the qi ? ao bridge in zhuhai under different geological conditions. it also studies such issues as the embedment of the steel casing and bottom elevation of the bored pile on the inclining rock and katarock

    文摘:筆者介紹了淇澳橋主橋施工中,在不同地質條件下,水上平臺的搭設、成設備的選型、事故的處理,並對鋼護筒的埋設及破碎帶傾斜巖面上嵌巖面上底標高問題作了探討
  4. Someone think it must use permeating theory to design, the others think it must use permeating theory to design. the building ministry made out the working standard of the later pressure grouting of pour pile, but it stand at the industry standard, is n ' t enough perfect and comprehensive. in this paper, the author put forward the design principle by analyzing the reasons that affect the bear load ability of the drilling hole pour pile and the principle that improve the bear load ability of single pile by later pressure grouting, put forward th e working technology and requirement of check before acceptance by analyzing and summarizing several models such as the chinese railway 11 office residential high building

    本文通過分析影響承載力的因素以及后壓漿提高單承載力的理提出了設計計算的原則;通過中鐵十一局高層住宅樓低壓力后壓漿工程對6根的壓漿對比試驗及探揭露確定了低壓力后壓漿所適用設計理論和方法;確定了低壓力后壓漿的壓漿壓力、壓漿量等參數;經過實驗及經驗總結確定了壓漿材料的選取原則及方法,列出了低壓力后壓漿在不同土層適用的壓漿材料。
  5. Construction technology of rotary drilling machines and impact hammer working together in mollisol area

    軟土地區旋挖與振動錘聯合施工施工工藝
  6. This paper expounds the application of the cast - in - place pile for its function and grouting technique in the foundation project of bridge construction

    摘要通過對地基處理的工作理及端壓漿技術在橋梁建設地基工程中的應用。
  7. Mechanism study on bored cast - in - place piles with post - grouting technology

    后壓漿的荷載傳遞理研究
  8. This differ with computation modal that design the foundation pier very big, bearing power too than design increment ; usage mechanics numerical analysis device with limited a logarithm of timw fitting method logt, noted the rock strength in stake tip of the borehole cast - in - place concrete pile to proceed with the structure steadiness the simulation compute to study with the fixed amount, designing for the engineering to start construction to provide for science with the spot

    本研究結合現場試驗、力學數值分析和有限單元分析,對巖溶地段的施工工藝、荷載傳遞理、持力層頂板厚度及嵌巖深度等方面作一些探討性研究,為該工程的設計和施工積累經驗,並為該類課題的進一步研究奠定了基礎。
  9. This article aims at the characteristics of a baibie harbor great bridge, by the spot construction test and mechanicses, limited an analysis, dissolve to the construction technics and loading capacity, stake deliver mechanism, bearing stratum and glazing rock depth area curve etc. s of the borehole cast - in - place concrete pile in the karst terrain do the some study research

    國內外對于巖溶地區的研究,主要是針對具體工程的施工方案描述和施工故障及處理措施,對巖溶地段基的承載理及承載力的綜合研究則未見報道。本文針對白墅港大橋的特點,通過現場施工試驗及力學、有限元分析,對巖溶地區的施工工藝、荷載傳遞理、持力層厚度及嵌巖深度等方面做一些探討性研究。
  10. Abstract : based on the in - situ pressure - grouting experiments and the full - scale pile tests of xinxiang and ligou and yangzhou bridges, the process and effect of jet pressure - grouting are presented in this paper. the mechanism of increasing the performance of bored piles by grouting is also analyzed. an engineering experience of applying the new technique is presented in the paper

    文摘:根據新鄉、鞏縣及揚州等地底壓力漿現場試驗和的靜載試驗,介紹了底壓力漿的工藝及壓力漿的效果,並對壓力漿提高承載力的理進行了分析,對其推廣應用作了介紹。
  11. The filling pile drilling machine of kp2000 type applies to pore forming construction of various architectural base and shallow well with heavy caliber, vertical well of small coal mine, defense engineering bore using and other drilling projects

    Kp2000型灌注樁鉆孔機適用於各種建築基礎成施工以及大口徑淺水井、小煤礦豎井、國防工程用工程。
  12. Application of artificial digging hole and machinery drilling hole bored concrete pile mixture support in new and old construction

    人工挖混合使用支護在新舊工業廠房施工中的應用
  13. Five factors of effecting specify the bearing capacity of drilled grouting pile ( engineering properties of soil, structural dimension of pile, stiffness of pile, time ) have been concluded through introducing the transmission of load mechanism of drilled grouting pile. at the same time, the effecting parameter has been collected. the paper build the ann model in predicting ultimate bearing capacity of drilled grouting pile and discuss in detail the extraction of inputting nodes information when quoting the fundamental principle of ann model and introducing research process of the improved bnn

    本文簡要介紹了基承載力的研究現狀並指出將神經網路引入基工程的意義,從介紹單荷載傳遞理出發總結了影響單極限承載力的五種因素(周土的工程性質、身結構尺寸、的剛度、時間以及施工工藝)並提取了相應的參數;引用神經網路基本原理,詳細介紹了改進bp神經網路的研究過程,從而建立了預測極限承載力的神經網路模型;並詳細討論了本模型的神經網路輸入結點信息的提取,在工程實例的基礎上進行了數值計算。
  14. In recent years, the rotating drill that fit out every kind of drilling equipment, with multi - function form, in the capital construction engineering, bring into play the bigger function, suffer the widespread concern

    摘要近年來,旋挖配備各種具,以多功能的形式在基本建設工程的施工中發揮了較大的作用,受到普遍的關
  15. In this paper, depending on the enormous 356 pile testing date detailed with soil and pile parameters and p ~ s curves, covering xi ' an and adjacent areas, we analyzed the load transmission mechanism of pile in loess foundation, and proposed a kind of hyperbolic load transmission function between pile and it ' s neighboring soil. meanwhile, we created a mathematical model to predict p ~ s curve and bearing capacity of single pile. by analyzing the compacting effect caused by pile - sinking of pressed pile in loess and it ' s influence on bearing capacity and settlement, two parameters, kc and ke are introduced to modify the soil cohesive c and deformation modulus es

    本文利用現己收集到的西安及其周邊地區356根打入、靜壓的現場試資料(其中打入67根,靜壓121根,168根,並有詳細的地層勘探資料,深資料,荷載沉降?曲線)對西安黃土地基中的打入、靜壓的荷載傳遞理進行了分析研究,認為用雙曲線型的荷載傳遞函數模擬土之間的荷載傳遞函數是合適的,並用荷載傳遞分析的方法建立了計算p s曲線的數學模型及極限承載力的確定方法。
  16. Which often produces some unexpected problems, such as prolonging time limit of project, increasing engineering quantities and cost, etc. through test on the site, dynamic value analysis, finite element unit method, the paper researchs construction technology of in - situ pile, transfer theory, thickness of supporting layer of head slab and depth of pile in karst area, provides some important conclusions, directs effectively the design and construction of this kind of projects

    但因溶洞的分佈規律性差,現有勘探手段難於事先查明它的準確位置及大小,因而常常給施工帶來意想不到的問題:工期延長、工程量增加及工程費用增加等。本文通過現場試驗、理論計算和有限單元分析,對巖溶地區的施工工藝、荷載傳遞理、持力層頂板厚度及嵌巖深度等方面進行了較為系統的研究,得出了一些重要結論,有效地指導了該類工程的設計和施工。
  17. Correlative function method and variable function method are used to calculate the relevant range of soil layer. the limit capacity of bored pile is determined by the cone penetration tests ( cpt ) and the static loading tests and related statistics parameters are also evaluated. considering the effects of group piles, the action effect is calculated by the settlement of pile foundation and the reliability index of single pile as well as group piles is determined by monte - carlo method

    本文選擇臨近場地的四座高層建築地基的全部勘測資料,以沿深度方向的一維平穩高斯隨場作為基土層土性參數的數學模型,利用相關函數法和變異函數法計算土層的相關范圍,由cpt和靜載試驗結果綜合確定的極限承載力,進而對相同場地各試的承載力進行折算后檢驗其概率分佈,並估計有關統計參數:考慮群效應確定基承載力,由基沉降反算其作用效應,由monte - carlo方法計算單及群的可靠指標。
分享友人