灌注混凝土 的英文怎麼說

中文拼音 [guànzhùhúnníng]
灌注混凝土 英文
concreting
  • : Ⅰ動詞1 (輸水澆土) irrigate 2 (倒進去; 注入) pour in; fill 3 (飲酒; 勉強他人飲酒) drink wine...
  • : Ⅰ動詞1 (灌入) pour; irrigate 2 (集中) concentrate on; fix on; focus on 3 (用文字來解釋字句)...
  • : 混形容詞1. (渾濁) muddy; turbid2. (糊塗; 不明事理) foolish; stupid
  • : 動詞1. (凝結) congeal; curdle; coagulate 2. (注意力集中) fix
  • 灌注 : pour into; priming; flood灌注機 bottler placer
  • 混凝土 : concrete; beton; jetereting混凝土壩 concrete dam; 混凝土板 concrete slab; 混凝土標號 concrete gra...
  1. Cast - in - place piles with expanded branches or plates based on common concrete bored piles are a new type of piles foundation which have the specialty of high vertically bearing capacity and have been marked both economic and social benefits. especially in the resist draw load, it indicates a broader application scope. however, because of the poor application of cast - in - place piles in the practices, almost all the experiments are based on modeling experiments

    擠擴支盤樁是近年來工程界有較強生命力的新樁型,該樁型是採用仿生學的方法在原有等截面樁的基礎上研發成功的,其顯著的特點就是具有較高的單方承載能力,具有良好的社會與經濟效益。
  2. The effect of pouring arch circle to support ' s deformation is studied. the pour sequence of main arch circle is laid down by the principle that support ' s deformation is minimal in the process of pouring concrete

    研究了拱圈澆對支架變形的影響關系,遵循分段順序應使支架在過程中變形幅度最小的原則,制定了主拱圈順序。
  3. Especially indicate how to calculate the modulus of partially cfst arch bridge axis with different section and not even constant loads mass degree

    特別指出了部分鋼管拱橋截面不統一且恆載集度有變化的前提下,如何考慮其拱軸系數的計算。
  4. A phase consists of a group of related tasks, such as buying cement, renting the cement mixer, and pouring the concrete

    階段由一組相關的任務組成,譬如購買水泥,租用攪拌器,灌注混凝土
  5. Abstract : the paper describes in detail the construction technology ofelastic monolithic track bed at extra - long qinling tunnel, i. e., selection of material, quality control, preparation and casting of track bed concrete, as well as some points for attention during construction

    文摘:較為詳細地介紹了秦嶺特長隧道彈性整體道床施工技術,包括彈性整體道床用料的選擇,施工機具的選型,施工工藝及質量控制,道床製備、築,以及施工意事項等。
  6. Reinforced concrete cover removal of filling pile by static breaking agent

    利用靜態破碎劑拆除樁鋼筋蓋帽
  7. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化配合比,從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  8. The same type of cement - soil mixing pile with concrete core, concrete pile and cement - soil pile that means they have the same pile length and pile diameter is deeply analyzed by finite element program. we get the q - s curve, the axis force of pile body curve, the stress of pile curve and the side and the end sharing load ratio of the pile curve by finite element program. with the help of the finite element program, the paper finds the relations between the pile ' s parameter and its bearing capacity and load transferring properties

    利用有限元計算分析了同比(樁長相同、樁徑相同)水泥組合樁、水泥攪拌樁和鉆孔樁,得到了它們的荷載沉降曲線、樁身應力曲線、樁身軸力曲線、樁側樁端分擔荷載曲線等,通過這些曲線對它們的荷載傳遞規律以及變形特性進行了深入的分析。
  9. Quality of concrete depends on proper placing, finishing, and curing

    的質量取決于適當的、抹光和養護。
  10. The technological control of underwater concrete grouting of pile foundation

    樁基礎水下的技術控制
  11. Analysis on usual accidents in underwater concrete pouring and its countermeasures

    水下常見事故分析及處理措施探討
  12. By analyzing the several finished bridge projects, if the hollow pile foundation is adopted, we can economize subaqueous concrete consumption more than 40 per cents ; if the gr outed new technique of pile surroundings and pile toe is adopted, we can increase the load capacity 30 per cents than that of the replacement pile, and economize 20 per cents of the cost. it will show great and obvious economic and social benefits

    已建多座橋梁工程採用樁周、樁底壓漿新工藝的比較分析表明,該工藝可使水下的用量節省40以上,且比傳統的鉆孔樁可提高承載力30以上;節約造價20以上,具有顯著的經濟效益和社會效益。
  13. Cast - in - place concrete foundation

    灌注混凝土基礎
  14. Use a verb and a noun to name tasks ( for example, pour concrete )

    使用動詞和名詞定義任務(譬如,灌注混凝土) 。
  15. Digging a hole and pouring concrete are part of the larger process of laying a foundation

    挖坑和灌注混凝土是較大的修築地基過程的一部分。
  16. The maximum water - tight grade can be up to p40

    適用於薄壁結構和施工。
  17. In the mean time, i discusses the technology of drill - grouting pile foundation, especially in the technology of drilling works, steel works and concrete works, etc. at last, i put forward the methods in dealing with the common accidents

    同時,本文詳細探討了巖溶地區鉆孔樁施工技術,特別是對其成孔工藝、鋼筋工程、工程等進行了重點分析,並提出了針對其常見質量事故的處理方法。
  18. The paper introduces large - scale fem software, algor, by which the auther can build model of hanging box of high pile cap, and simulates accurately three loadcases, which include loadcase behind enclosed concrete, loadcase behind empty water in hanging box, and loadcase behind high pile cap construction. the auther calculates tensor and displacement of hanging box weir when loads exert panels, supports, suspenders, top beams, base beams of hanging box weir. at the same time the auther carrys out th e stability analysis, besides, educes calculational and analytical data, which are tally with construction result in the main

    論文介紹大型通用有限元計算軟體algor ,並用軟體建立大遼河特大橋高樁承臺吊箱圍堰的全結構模型,相對準確地模擬封底后、抽除吊箱內河水后、承臺破冰體施工后等三種受力工況,並用模型進行了應力和變形的計算,計算各工況荷載作用於吊箱全結構箱體板面、內支撐、吊桿、懸吊頂梁、底梁等的應力和變形,並對比吊箱圍堰板面計算變形和施工實測變形,結果是吻合的;對大遼河特大橋高樁承臺輕型吊箱的穩定性進行了計算分析;論文研究工作表明,應用組合有限元方法計算大型施工結構問題具有現實意義。
  19. From the point of kinematics and dynamics, the author analyses the propagation rules of stress waves in concrete, namely time - space relations, wave amplitude attenuation, dispersion effect and characteristics of transmission of reflected waves and acoustic waves. combining with engineering practices, the author also concluded the main points of low strain detection of integrity of longdiameter underwater cast - in - situ piles, and pointed out that comprehensive and relational utilization of reflected waves method and acoustic wave transmission method can accurately evaluated the integrity of pile shaft and then improve the reliability of detection. 6figs., 3refs

    從運動學和動力學角度,分析應力波在中的傳播規律:時空關系、波幅衰減、頻散作用以及反射波與聲波透射的特點,結合工程實踐,總結大直徑水下樁低應變檢測的工作要點,指出綜合、合理運用反射波法與聲波透射法,可以較準確地評價樁身完整性,提高檢測結果的可靠性.圖6 ,參3
  20. Problems paled in setting accounts of project price

    超流態管樁應用及意問題
分享友人