灌漿孔 的英文怎麼說

中文拼音 [guànjiāngkǒng]
灌漿孔 英文
grout hole
  • : Ⅰ動詞1 (輸水澆土) irrigate 2 (倒進去; 注入) pour in; fill 3 (飲酒; 勉強他人飲酒) drink wine...
  • 漿 : 漿同「糨」
  • 灌漿 : 1 (澆灌灰漿) [建築] grout; grout in; grouting; grouting up; [采礦工程] injection2 [植物學] (穀...
  1. But these were uncased auger-drilled poured pilings, with the grout in direct contact with the native materials.

    不過這些都是露出地面經鉆而成的樁,灰漿同天然材料直接接觸。
  2. Improving measures for the drilling of solidified grout hole with ingersoll - rand lm - 500c hydraulic drill rig

    露天液壓鉆機鉆鑿固結灌漿孔的改進措施
  3. Special situation treatment and deep hole purdah grouting engineering technology in zipingpu water - control project

    紫坪鋪水利樞紐工程深帷幕漿及特殊情況處理
  4. Since first used in the wujiangdu hydraulic power station with success, high - pressure grouting ( orifice - closed grouting method ) spreads rapidly in the carst region and lots of experience are accumulated

    高壓漿(即口封閉漿法)自烏江渡電站首次採用並取得成功后,在巖溶地區得到了迅速的推廣,集累了十分豐富的實踐經驗。
  5. Standard practice for sealing sewer manholes using chemical grouting

    用化學漿密封污水道檢查的標準規程
  6. Boring, grouting and finally forming an impervious curtain in the rock mass with cracks, that is one of the most popular methods of the foundation seepage control at hydraulic and hydroelectric engineering

    採用鉆水泥漿封堵巖體中的縫隙而形成阻水帷幕,達到減少滲漏量和降低滲透壓力的目的,是水利水電工程基礎處理的重要手段之一。
  7. Gin is the abbreviation for grouting intensity number. it is showed by the product of the final grouting pressure p ( unit : mpa ) on the grouting section and the grouting volume v ( unit : l / m ) on every one meter of the grouting section, which means the energy consumed on every one meter of grouting section. according to gin method, if during the grouting construction, same energy is consumed on every grouting section, i. e. gin keeps to be a constant, an approximately uniform impervious curtain can be obtained

    Gin ( groutingintensitynumber )即漿強度值,它用灌漿孔段上最終的漿壓力p ( mpa )和單位漿段長度漿注量v ( l / m )的乘積表示,其含義為單位漿段上消耗的能量, gin法漿認為在漿施工中,保持各灌漿孔段上消耗一致的能量,即保持gin為常數,便可形成一道大致均勻的防滲帷幕。
  8. The distance of the single - row curtain grout hole is between 1. 4 to 1. 8 meter, and 2. 0 meter is suitable for the double - row curtain ; the grouting pressure generally is 1. 0 to 1. 5 mpa at the first three grout compartment, then grouting pressure of under the fourth control in 4 to 5 mpa ; for mast grout compartments, a water - cement ratio of 2 or 1 may used in the first grouting

    密度也由原來的0 . slm / mz降至o . 64n擴mz ,節約工程投資447 . 35萬元。 6 、單排帷幕的距在1 . 4一1 . 8m之間,雙排帷幕的距以zm為宜;漿壓力在地表以下前三段一般為1一1 . smpa ,第四段以下按4一smpa控制;對大部分段而言,開水灰比可定為2或1 。
  9. During the construction of the dam foundation cut - off for dalong water control project, the construction techniques adaptable to the construction under the condition with high interference, short construction period and strict quality standard are selected through the related productive experiment, with which the problems such as the prevention and treatment of hole collapse and lowering steel reinforcement cage and pre - embedded grouting pipe into place are solved, and then the successful construction of the cut - off is guaranteed as well

    摘要在大隆水利樞紐壩基防滲墻施工過程中,通過生產性試驗選擇出了適合該防滲墻工程施工干擾大、工期緊、質量標準高的要求的施工技術,解決好了口塌的預防、處理及鋼筋籠和預理漿管下設等技術難題,保證了該防滲墻工程的成功建設。
  10. Line meter ( m ) and grout take ( t ) method were taken successively for measurement of grouting quantity in china

    我國漿工程的工程量主要採用灌漿孔進尺(延長米, m )和漿注入量( t )兩種方法計量。
  11. By drilling to weak position, the jet - grouting technique breaks through and mixes with soil and stone of dam foundation to form diaphragm - wall

    高壓噴射漿可由鉆機鉆至需處理的薄弱部位,通過高壓射流的沖擊攪拌,水泥漿在噴射范圍內與地層土石顆粒摻混攪合后形成防滲墻。
  12. Using plots with water and fertilizer fully controlled, the effect of photosynthetic characteristic and yield under different treatments of water and fertilizer coupling was investigated. the result showed that photosynthetic rates are different among treatments of water and fertilizer coupling, and the change of stomatal conductivity is the same as photosynthetic rat. there is almost no influence on evaporation rate and cellular co2 concentration the combination of fertilizer and manure under natural rainfall is beneficial to the maintenance of photosynthetic rate during grain filling, thus results in highter yield and good quality. however, the coupling of fertilizer and manure with sufficient water results in the decline of photosynthetic rate and stomatal conductivity, the yield decreased indicating there has a balance ratio between water and nutrients ( fertilizer and manure ) supply. the study proposed that the optimum management to exploring yield and qlality potential is the combination of fertilizer and manure application with no irrigation

    利用可精確控制水分條件的水肥平衡場,在不同水肥耦合處理的條件下,研究了水肥耦合對玉米光合特性及產量的影響,結果表明:不同水肥耦合處理的條件下,玉米的光合速率有所不同,氣導度的變化與光合速率的變化表現基本一致,而對蒸騰速率、細胞間co2濃度影響不大.其中,在自然降水條件下,有機肥和無機肥的配合,有利於玉米子粒漿期維持較高的光合速率,表現出良好的產量潛力.充足水條件下,有機肥和無機肥的配合,光合速率及氣導度表現較低,表現產量有所下降,說明供水量與施肥量之間有一個平衡系數.表明黑龍江省北部黑土區自然生態條件下,為充分發揮玉米的產量潛力,最佳的管理措施是增施無機肥和有機肥的配合
  13. In this section the author analyses the rules of the pile ultimate tip resistance and the shaft friction resistance distribution and their exertion of cast - in - place socketed piles instrumented with strainometers in soft muddy rock. the second aspect of the paper is the analysis on the current rock pile vertical bearing capacity in the four standards gb50007 - 2002, tb 10002. 5 - 99, jtj024 - 85 and jgj94 - 94, then the design method with correlated formula of socketed piles in xigeda - mudstone is given. at the end of this paper, based on the research of pressure grouting technique in recent years, and combined with in - site test result, this paper puts forward the design and calculation method to grouted pile in xigeda - mudstone and the principle of choosing grouting parameters, which provid es experiences for applying this technique and further studying

    本論文結合省級科研項目「西攀高速公路昔格達組泥巖層中鉆樁提高承載力的研究」 ,所做的研究工作主要在以下三個方面:一是根據8根樁身內埋設量測元件試樁的單樁豎向靜載荷試驗資料,分析了各試驗樁特別是常規沖注嵌巖樁在昔格達泥巖中的軸向力、側摩阻和樁端阻力的分佈和發揮規律;二是在討論現行規范對嵌巖樁承載力的計算公式的基礎上,探討了在昔格達泥巖層中的沖注嵌巖樁的側摩阻和端阻的計算方法,並推薦了相應的計算公式;最後,在吸取近年來對注樁后注漿技術研究成果的基礎上,結合現場試驗研究結果,分析了該項技術在昔格達巖層中的應用效果,提出了相應的參數選取,從而為壓力漿技術的工程應用和進一步研究提供經驗,並為今後在該地層中合理選用樁型以及指導施工提供了依據。
  14. Application of dth drilling with simultaneous casing in high pressure spiral jet grouting technology in pebble formation

    錘跟管鉆進技術在卵石層高壓旋噴漿工藝中的應用
  15. Inclined genesis of deep curtain grout hole and disposal methods

    帷幕灌漿孔斜成因與處理
  16. Abstract : based on the in - situ pressure - grouting experiments and the full - scale pile tests of xinxiang and ligou and yangzhou bridges, the process and effect of jet pressure - grouting are presented in this paper. the mechanism of increasing the performance of bored piles by grouting is also analyzed. an engineering experience of applying the new technique is presented in the paper

    文摘:根據新鄉、鞏縣及揚州等地鉆注樁樁底壓力漿現場試驗和樁的靜載試驗,介紹了樁底壓力漿的工藝及壓力漿的效果,並對壓力漿提高鉆注樁承載力的機理進行了分析,對其推廣應用作了介紹。
  17. The packing gland for the conventional high - pressure grouting is modified to be adaptable to the low - pressure curtain grouting ; by which the application area of the grouting method is enlarged along with improved grouting quality and shortened construction period

    摘要通過對常規口封閉漿法的口封閉器進行改造,使口封閉漿法也適應于低壓帷幕裝工程,從而擴大了其適用范圍,提高了工程質量,縮短了工程工期。
  18. Application of high - pressure jet grouting to artificial digging hole piles

    高壓噴射漿技術在人工挖樁中的應用
  19. Unbounded partially prestressed reinforced ( ppc ) structure is a new form of reinforced concrete ( rc ) structure 5which need not set ducts, install tendons and grout in advance, so it is more convenient and quicken the rate of progress

    無粘結部分預應力混凝土結構是一種新型的加筋混凝土結構形成,它不需要預留道、穿筋、漿等復雜工序,簡便操作,加快了施工進度。
  20. Abstract : connected with the practical project, the paper tries to discussthe problem of anchor bolt setting in large - scale power equipment ' s foundation such as fan and electromotor used in removing dust project, analyzes the feasibility of a new grouting method in pre - setting hole and puts forward its popularization value in other projects

    文摘:結合實際工程,討論了在除塵工程中風機、電機等大型動力設備基礎地腳螺栓埋設的問題,分析了一種新型的預留漿方法的可行性,並提出了其在其它工程中的推廣價值。
分享友人