灌築次序 的英文怎麼說
中文拼音 [guàncìxù]
灌築次序
英文
placing sequence-
The construction of the bridge began in oct 1999, and the closing up of the steel tube was in dec 2000. during that period, i learned and analyzed the current construction methods fairly comprehensively, and collected the construction technique data of the cfst arch bridges having been built. based on this, aided by the simulation of construction procedure using finite element program, i proposed the operation program to make the steel tube segment be located at one time, and the scheme of dividing rooms to segment pouring
大橋於99年10月開工, 2000年12月主橋鋼管合龍,在此期間,本人就目前鋼管混凝土拱橋的施工方法進行了較全面的了解和分析,搜集了此類已建橋梁的施工技術資料,在此基礎上,又藉助有限元程序對施工過程模擬計算的支持,提出了在梅溪河大橋懸臂安裝過程中,鋼管節段一次就位的操作程序和鋼管混凝土分倉灌築的方案,並為施工單位采納應用。