火炬基礎 的英文怎麼說

中文拼音 [huǒchǔ]
火炬基礎 英文
flare foundation
  • : fire
  • : Ⅰ名詞(火把) torch Ⅱ動詞(火焚) fire
  • : 名詞(墊在房屋柱子底下的石頭) plinth
  • 火炬 : torch light; torch火炬接力 relay running with torches; 火炬賽跑 torch race; 火炬遊行 torchlight parade
  1. As a new product with provincial class, the shxj - b600 model computer straightening sealing & cutting bag maker has been approved by the expert panel of zhejiang science committee in august 1999, and it has been put in order for batch production presently. the new invention of wsfd model computer controlthree - sides sealing & cuting bag maker, which was approved by the center of zhejiang light industry machinery quality - supervising on 5th of february 2002. it s also approved as a provincial grade new product by the expert panel of zhejiang science committee in may 2002 with the optimistic future in the foreground development

    本廠十分注重新產品的開發,近三年來我廠自主開發的產品就有十四項通過省級新產品鑒定,其中兩項被列為省級高新技術產品,一項被列為國家重點新產品計劃項目,兩項被列為國家計劃項目,並上報了一項國家技術創新金,還有三項新產品已經通過了省機械檢測中心的技術檢測和科技查新,準備通過省級技術鑒定,並在此上上報了八項國家專利。
  2. Abstract : based on the analysis and finding out the cause of the condensation of gas, we add an absorber in the system which absorbs condensate, taking the mixture of cocker gasoline - diesel as the medium and accomplish the separating and recovering of condensate in the gas. by this way we get good effect in the utilization of the low - pressure gas in the refinery and create the conditions for eliminating the torch

    文摘:在分析和查找瓦斯凝液成因的上,通過增設吸收塔等技術措施,以焦化汽柴油為介質吸收凝液,實現了瓦斯中凝液的分離和回收,在煉油廠低壓瓦斯利用上收到了良好效果,為熄滅創造了條件。
  3. Shanghai zhangyan new material intensive processing industry base under the state torch program, the predecessor of shanghai non - ferrous high - tech industry park with planned area of 10. 44 sq. km., has finished 3 sq. km. infrastructure in the first phase and will complete the administration center, auxiliary facilities for the living area and 2 sq. km. infrastructure for the second phase by 2006

    國家計劃上海張堰新材料深加工產業地,前身上海有色高科技工業園區,地規劃面積10 . 44平方公里,完成了首期3平方公里的設施建設, 2006年完成行政管理中心、生活配套區及第二期2平方公里的設施建設。
分享友人