火車司爐 的英文怎麼說

中文拼音 [huǒ]
火車司爐 英文
bakehead
  • : fire
  • : 車名詞1. (中國象棋棋子的一種) chariot, one of the pieces in chinese chess2. (國際象棋棋子的一種) castle; rook
  • : Ⅰ動詞(主持; 操作; 經營) take charge of; attend to; manage Ⅱ名詞1 (部一級機關里的一個部門) dep...
  • 火車 : train
  1. Aslef associated society of locomotive engineers and firemen

    英國機與聯合會
  2. With double travelling cranes, advanced 60mm punching machine, 140mm fungus type punching machine ; domestic leading 159mma r tube rolling - mills, 159mm7 rack calibrator ; the national monopoly product micro tension - reducing diameter machinery and the producer gas generator ; 40, 60, 80, 220mm straightening machine ; 5 40 tons motoblocs ; bottom rolling type continual annealing furnace ; 14m pitch type heating furnace as well as qg1118 highly effective pipe cutter and so on as well as correlated necessary facility

    據有雙配行的大型廠房17500平方米,先進的60mm穿孔機, 140mm菌式穿孔機國內領先的159mmar軋管機, 159mm7機架定徑機國家專利產品微張力減徑機和煤氣發生40 60 80 220mm矯直機540噸拉拔機滾底式連續退14m斜坡式加熱以及qg1118高效切管機等以及相關配套設施。
  3. Although the engineer shoveled the coal in as fast as he could, the steam engine would go no faster

    雖然火車司爐盡快地將煤鏟進子,但一點也沒加快。
  4. The paper investigats modeling and optimizing problems of parallel machine scheduling with resource - constrained and multi - step working procedure, acting bell - type annealing of shanghai baosteel yichang sheet lt. co. as practical background, designs and develops scheduling production system which is optimized according to practical demand of annealing workshop

    本文以上海寶鋼益昌薄板有限公罩式退過程為背景,研究了資源受限多步工序并行機器調度問題的建模和優化問題,結合退間生產調度的實際需要,進行了退優化排產系統的設計和開發。
  5. The locomotive, which was slowly approaching with deafening whistles, was that which, having been detached from the train, had continued its route with such terrific rapidity, carrying off the unconscious engineer and stoker. it had run several miles, when, the fire becoming low for want of fuel, the steam had slackened ; and it had finally stopped an hour after, some twenty miles beyond fort kearney

    它自從甩掉了列以後,就以驚人的速度帶著半死不活的機和繼續向前飛馳,一直跑了好多英里,一小時之後煤燒得差不多了,也小了,蒸氣也減少了,它才越走越慢,最後在離開克爾尼堡二十英里的路上停了下來。
  6. On december 11 2001, the new no. 3 calciner igniting and putting into production, the calcined capacity will increase of one time. at the same time, the new vibrating and forming workshop is putting into function, the throughput will be changed greatly

    2001年12月11日,公新上的3號煅燒成功,煅燒能力增加一倍,同時新上的振型間也投入運行,生產能力大大提高
分享友人