無周期電流 的英文怎麼說

中文拼音 [zhōudiànliú]
無周期電流 英文
aperiodic current
  • : 無Ⅰ動詞(沒有) not have; there is not; be without Ⅱ名詞1 (沒有) nothing; nil 2 (姓氏) a surn...
  • : Ⅰ名詞1 (圈子; 周圍) circumference; periphery; circuit 2 (星期) week 3 [電學] (周波的簡稱) c...
  • : 期名詞[書面語]1. (一周年) a full year; anniversary 2. (一整月) a full month
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
  • 電流 : current; galvanic current; electric current; electricity; current flow電流保護裝置 current protec...
  1. On - line monitoring of hvcb is the precondition of predicting maintenance, is the key element of reliable run, and is the important supplement to the traditional off - line preventive maintenance in fact, the faults are made by hvcb, no matter in number or in times, is over 60 % of total faults so it has determinative importance for improving the reliability of power supply and this can greatly decrease the capital waste used by - dating overhaul in this paper, the inspecting way of hvcb mechanism characteristic is discussed the concept of sub - circuit protector is presented, the scheme that we offered has been combined with sub - circuit integrality monitoring theory, to ensure that it has the two functions as a whole according the shut - off times at rated short circuit given by hvcb manufacturer, the electricity longevity loss can be calculated in each operation, and the remained longevity can be forecast too an indirect way for calculating main touch ' s temperature by using breaker shell temperature, air circumference temperature and breaker ' s heat resistance is improved in this paper, and main touch resistance can be calculated if providing the load current msp430, a new single chip microcomputer made by ti company, is engaged to develop the hardware system of the on - line monitoring device, and special problem brought by the lower supply voltage range of this chip is considered fully

    高壓斷路器所造成的事故論是在次數,還是在事故所造成的停時間上都占據總量60以上。因此,及時了解斷路器的工作狀態對提高供可靠性有決定性意義;並可以大大減少盲目定檢修帶來的資金浪費。本文論述了斷路器機械特性參數監測方法;提出了二次迴路保護器的概念,並將跳、合閘線圈完整性監視和二次迴路保護結合起來,給出具有完整性監視功能的二次迴路保護器實現方案;根據斷路器生產廠家提供的斷路器額定短路分斷次數,計算每次分閘對應的觸頭壽命損耗,預測觸頭壽命;提出根據斷路器殼體溫度和斷路器圍空氣溫度結合斷路器熱阻來計算斷路器主觸頭穩態溫升的方法,並根據此時的負荷間接計算主觸頭迴路的阻;在硬體路設計上,採用美國ti公司最新推出的一種功能強大的單片機msp430 ,並充分考慮該晶元的適用壓范圍給設計帶來的特殊問題;在通信模塊的設計中,解決了不同工作壓晶元之間的介面問題,並給出了直接聯接的接線方案。
  2. Power transformer test is simulanted in test - room, try to prove that online measure of transformer test is feasible. the test results are satisfaction. in the end, there is software design : the instrumented - test - interface is developed ; location computer entering to sample state is the same time, and after the same " log time ", it stops the data sample note. every test signal data keeping in the data note memorizer is at the same time, so it realizes data synchronization collection. some blocking design in the process of software design can apply to the other software

    文章的最後,針對變壓器試驗微機測試系統對壓、功率等變量數據採集的特殊要求,分析了同步誤差的產生原因,給出了同步軟體采樣的差條件;建立了有效值和平均功率測量誤差的數學模型,提供了減小測量誤差的措施;應用「同步軟體采樣技術」 ,不需要增加采樣數,不需要硬體同步環節,較好地解決了同步誤差對測量精度的影響。
  3. The material ways are to model the honeycomb wall as an impredence surface, to express the infinite honeycomb by using periodic green ' s function, and using method of moment to establish the mathematic model, in applying the methods of moments, we choose the roof function as basic function and choose the razor function as test function ; by equating the incident field to sum of the scattering field and impledance field ; we will set up the integral equation for the surface current, solving it by mom equation. then gain it ' s reflected coefficient ' s numerical result. and we propose first the definition of the equivalent electromagnetic parameters and present a method to calculate them from the gained reflection coefficient

    具體方法就是將浸漬吸收劑的蜂窩壁用表面阻抗表示,將限大的結構的場用格林函數來表示,選取有耗蜂窩結構中具有代表性的基本計算單元應用矩量法建立數學模型,在運用矩量法時用屋頂函數作為基函數,刀片函數作為檢驗函數,根據蜂窩壁表面場必須滿足入射場等於散射場和阻抗場之和的規律,推導表面場積分方程,求解蜂窩結構的表面,利用蜂窩的規律得到限大均勻陣列的散射場。
  4. In the design of real - time control system, the paper takes three - phase full - bridge mosfet inverter as the real - time control main circuit, and adopts a control scheme with 120 ? switching mode combined with half - bridge pulse width modulation ( pwm ), which would avoid straightthrough short of a certain bridge. phase current is detected by single current sensor ; three - phase position signals generated by position sensors could not only supply commutation information for inverter, but also be used for speed detecting based on signals " period measurement, which makes the speed sensor unnecessary. the whole control system adopts speed and current dual closed - loop control strategy in order to construct a high performance rare - earth permanent magnetic brushless dc motor ( repm bldcm ) full - digital real - time control system

    在實時控制系統的設計中,本文以三相全橋mosfet逆變路作為實時控制主路,採用120導通方式結合半橋pwm調制的控制方案,從而有效地避免了橋臂的直通短路;本文用單傳感器實現對相的檢測,來自位置傳感器的三相位置信號不僅為逆變路提供換相信息,而且也用於基於信號測量的轉速檢測,這樣就省去了速度傳感器;系統採用的是速度、雙閉環控制策略,力求構建高性能的稀土永磁刷直動機全數字實時控制系統。
分享友人