無負載情況 的英文怎麼說

中文拼音 [zǎiqíngkuàng]
無負載情況 英文
no load position
  • : 無Ⅰ動詞(沒有) not have; there is not; be without Ⅱ名詞1 (沒有) nothing; nil 2 (姓氏) a surn...
  • : Ⅰ名詞1 (負擔) burden; load 2 (虧損) loss 3 (失敗) defeat Ⅱ動詞1 [書面語] (背) carry on th...
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • : 名詞1 (感情) feeling; affection; sentiment 2 (情分; 情面) favour; kindness; sensibilities; fe...
  • : Ⅰ名詞1 (情形) condition; situation 2 (姓氏) a surname Ⅱ動詞(比方) compare Ⅲ連詞[書面語] (...
  • 負載 : [電學] load
  1. Then a vsc controller using on - off valve and two potentiometers are designed for cushioning control system. it can realize the balanced, no shock, no reversing cushioning. experiments under different air pressure, load mass are carried out, and the results prove that the vsc controller can be used in pneumatic cushioning

    第五章首先介紹了變結構控制的原理和應用發展,然後針對本實驗系統設計了一個使用開關閥和端位位移傳感器的變結構控制方案,實現緩沖過程的平穩沖擊和回彈要求,並在不同氣源壓力、不同質量下分析了控制性能的變化,實驗結果證明緩沖控制採用變結構控制是可行的,並具有很強的魯棒性。
  2. When the governing valve was series - connected on the return oil - line in the metering - out control system, under the same flow area and the same adjusted pressure of relief valve, with the incremental quantity of step load, the pressure highly - adjusted capacity of the hydraulic cylinder chamber with piston - rod increased, meanwhile, it ' s time of rise, time to peak and the governing time all increased. at the same time, the pressure highly - adjusted capacity of the hydraulic cylinder chamber without piston - rod increased

    當出口節流調速系統的回油路上串接調速閥時,隨階躍的增加,在相同流量閥開度、相同溢流閥調節壓力的下,液壓缸有桿腔壓力p _ 2 ( t )的超調量是增加的,上升時間、峰值時間以及調整時間也是增加的;液壓缸桿腔壓力p _ 1 ( t )的超調量是增加的。
  3. This paper describes mainly system functions, measuring methods, circuit design, software program and errors analysis of a new type of measuring instrument. this instrument can measure and monitor electric parameters in single - phase circuits, three - phase ( three - wire or four - wire ) circuits. this system can be applied to electric devices and power plants, transformer substations with harmonic pollution. it can measure current, voltage, power, energy, frequence, power factor etc. it also can detect load quality, phase sequence, alarm, display and print results, as well as detect and dispose negative power

    該儀器適用於含有諧波污染下的機電設備現場、發電廠、供電局、企業變電所現場,可用來測量電流、電壓、有功功率、功功率、視在功率、有功電能、功電能、視在電能以及頻率和功率因數等電參數,並具有性質(感性、容性)判別,正、逆相序判別指示功能;超限報警功能;列印記錄功能和功檢測及處理功能。
  4. For separated push rod, switch on, under no - load condition, the oil cylinder makes reciprocating movement for several times, to discharge air in the cylinder and oil pipeline, then adds load

    分體推桿,接上電源讓油缸在無負載情況下,往復動作數次使油缸和油管中空氣排出、再帶上
  5. The influence of ambient temperature on the performance of refrigeration system are investigated, which can provide basis for further research, meanwhile, the corresponding changing curves are provided

    對有,分別研究了環境溫度變化對熱電製冷系統性能的影響,並給出了變化曲線,為深入研究和應用熱電製冷器打下了基礎。
  6. In order to instantly and real time eliminate harmonic and compensate reactive power, the definition of traditional reactive power, an integral average during a period, which is confined to apply under some circumstances. for example, when the load power varies swiftly, it will lead to can " t compensate reactive power rapidly

    為了實時、快速的補償功功率和消除諧波,傳統的基於平均值計算出來的功率因數,是以一個周期內積分而得出來的平均值,這在某種下就限制了它的應用,如系統功率快速變化時,就不能做到迅速、實時地補償功。
  7. Its rated voltage class includes 40. 5kv, 72. 5kv and 126kv. this product is applied for connecting and disconnecting of hv lines at no load, electrical isolation between inspected hv busbar, circuit breaker and other electrical equipment, and live hv lines, as well as connecting and disconnecting of small capacitance current and inductance current. the new - type hv disconnecting switch can effectively prevent such common problems as overheat in galvanic circle, misoperation and

    該系列產品為三相交流50hz的戶外高壓電器設備,額定電壓等級有33kv 40 . 5kv 72 . 5kv和126kv ,供高壓線路在無負載情況下進行開合,以及對被檢修高壓母線斷路器等電氣設備與帶電的高壓線路進行電氣隔離之用,也可用於開合小的電容或電感電流,並可按用戶要求加裝接地開關。
  8. Its rated voltage class includes 40. 5kv, 72. 5kv and 126kv. this product is applied for connecting and disconnecting of hv lines at no load, electrical isolation between inspected hv busbar, circuit breaker and other electrical equipment, and live hv lines, as well as connecting and disconnecting of small capacitance current and inductance current. the new - type hv disconnecting switch can effectively prevent such common problems as overheat in galvanic circle, misoperation and part rusting

    該系列產品為三相交流50hz的戶外高壓電器設備,額定電壓等級有33kv 40 . 5kv 72 . 5kv和126kv ,供高壓線路在無負載情況下進行開合,以及對被檢修高壓母線斷路器等電氣設備與帶電的高壓線路進行電氣隔離之用,也可用於開合小的電容或電感電流,並可按用戶要求加裝接地開關。
  9. Accorded to the experimental research, under different flow area of flow valve and different adjusted pressure of relief valve, conclusion that the regulation of the pressure p1, p2 in the two cylinder chambers varied with the change of step load were as follows : when the throttle valve was series - connected on the return oil - line in the metering - out control system, under the same flow area and the same adjusted pressure of relief valve, with the incremental quantity of step load, the pressure highly - adjusted capacity of the hydraulic cylinder chamber with piston - rod decreased, meanwhile, it ' s time of rise, time to peak and the governing time all decreased. while the pressure highly - adjusted capacity of the hydraulic cylinder chamber without piston - rod increased

    通過試驗研究得出系統在不同的流量閥開度、不同溢流閥調節壓力(進口壓力)下,液壓缸兩腔壓力p _ 1 、 p _ 2隨階躍變化的規律:當出口節流調速系統的回油路上串接節流閥時,隨階躍的增加,在相同流量閥開度、相同溢流閥調節壓力的下,液壓缸有桿腔壓力p _ 2 ( t )的超調量是減小的,上升時間、峰值時間以及調整時間也是減小的;液壓缸桿腔壓力p _ 1 ( t )的超調量是增加的。
  10. The “ gw9 - 12 ” type of outdoor high voltage isolator switch is the high voltage switch ewuip ment of single phase ac 50hz, the product is suitable for power system sithrated 10kv to make or break power supply under circumstances of with voltage and nomload

    12型戶外高壓職責離開關是單相交流50hz高壓開關設備,用於10kv的電力系統中,作為有電壓下接通或分斷電源使用。
  11. According to the characteristic of nine - area diagram of substation vol / var coordinated control, this system gives the defination of fuzzy sets and the degree of membership of input / output variables, and designs corresponding control rules. the results of simulation demonstrate the system can satisfy the constrains of the day - adjusting times of the switching of on - load transformer and paralleled compensation capacitors, and ensure voltage quality, reactive power basical balance. considering the var requirement in different load time period and the control demand in load saltation, a improved control scheme is provided. the results of simulation show the improved scheme can meet the demand of vol / var in different load time period, protect the wrong operation when either voltage or reactive power appears saltation, and decrease the times of regulation of the switching of on - load transformer and paralleled compensation capacitors finally, a background software module of substation vol / var coordinated control is designed, based on the supervisory control and data acquisition system of substation

    模擬結果證明該系統能在各種荷條件下確保電壓合格和功基本平衡,且能滿足變電站對有調壓變壓器分接頭日調節次數和並聯補償電容器組的日投切次數的限制。通過考慮不同荷時段對功功率的需求和荷突變下的控制要求,對上述模糊控制策略進行了改進,模擬結果證明改進后的控制策略能滿足不同荷時段對電壓和功的要求、抑制電壓或功突變下的誤動作,且有效地減少了有調壓變壓器分接頭和並聯補償電容器組的調節次數。最後基於變電站scada系統設計了一后臺電壓功綜合控制軟體模塊。
  12. The beginning point of the first research direction is that we design a type of load - balancing virtual topology which is insensitive to the traffic, such plan method has been proposed whose name is vlbs ( valiant load - balancing schemem ), the disadvantage of vlbs is that it can only be applied to the homogeneous network in which each node has the same capacity, in chapter2, a more general valiant load - balancing scheme ( gvlbs ) has been proposed, the advantage of the gvlbs is that it can be used both on the homogeneous network and heterogeous network, in this chapter, we will give the detail derivation process and numerical analysis. the beginning point of the second research direction is that we first design a virtual topology for the physical topology under a specific traffic matrix, for a while, the traffic has changed, the network performence will decline. under such condition, in chpater 3, a virtual topology reconfiguration algorithm is studied which can decrease the average weighted hops

    本文針對動態變化業務量下的wdm網路設計方法劃分為兩個主要的研究方向,第一個方向的研究出發點是可以在最初的虛拓撲設計過程中根據物理拓撲設計出一種虛拓撲出來,該虛拓撲是均衡的,在這種虛拓撲上跑的業務量矩陣特徵只要在某種范圍以內,論它怎樣動態變化,網路都不會出現擁塞,但這種虛拓撲設計演算法vlbs的一個缺陷是它只能適用於同構網路,即每個節點所擁有的容量大小都相等,在第二章中,本文提出了一種更通用的均衡的光網路虛拓撲設計演算法gvlbs ,該演算法與傳統的均衡演算法vlbs不同之處在於vlbs演算法只能適用於同構網路而gvlbs演算法既可以適用於同構網路,又可以適用於異構網路,在本章中將給出了gvlbs演算法的的詳細推導和數值分析。
  13. Abstract : the accurate dynamic simulation has been made for the synchronous generator - semiconductor rectifier on dynamic operation, and has been tested by experiment. for the first time, the dynamic waveform of simulation and experiment are applied. the work of this paper has made important theorem foundation for the brushless excite synchronous generator and dc link vscf electrical power generator system

    文摘:應用數字模擬的方法,實現了對同步發電機-整流橋系統在所有運行下精確的動態模擬計算,並進行了實驗驗證,首次提供了該系統動態過程中各參量的模擬與實驗波形,本文為刷電機及變速恆頻電源系統的動態研究提供了理論基礎。
  14. The positive load take absolutely advantage in the first spatial pattern of year and seasons. especially that the precipitation field load of winter is all positive. not in the southwest of china because of southwest monsoon etc. system ; the characteristics of the second spatial pattern are that most of the area is taken up by positive load in year and four seasons, the west of talimu basin is the center of negative load of the year, spring and autumn vector fields ; east of zhungeer basin is the center of positive load of the third spatial pattern of year, spring, summer and winter, the center of negative load is often in east of chaidamu basin, but the distribution center of autumn is in east of zhungeer basin ; the distribution of the fourth spatial pattern is difficult to describe and forms several centers of positive and negative load ; several centers of positive and negative load also appear, the distribution of load fields of the fifth spatial pattern of year, spring and winter represents the situation of " +, -, + " from southeast to northwest ; the complexity of the sixth spatial pattern is more stonger than that of the fourth and the fifth spatial pattern, several centers of load fields of year and each season often appears inverse situation of the positive and the negative load. but the centers are still most in zhungeer basin, chaidamu basin and talimu basin

    第一空間型中,年和四季都是正荷占據絕對優勢,特別是冬季降水場皆為正值,只是西南地區由於受西南季風等系統的影響,表現為與其它地區的不同;第二空間型的特點如下:年和四季分佈皆為正荷占據大部分區域,中心年、春季和秋季分佈中都是位於塔里木盆地西部地區;第三空間型正荷高值中心除秋季外都是處在準格爾盆地以東地區,中心多在柴達木盆地以東地區,秋季卻處于準格爾盆地以東地區;第四空間型分佈就較復雜章法可言,形成多處正中心;第五空間型特徵是這樣的,同樣是多個荷中心出現,年、春季和冬季中的荷場分佈從東南到西北大體呈現「 + 、 - 、 + 」的特點;第六空間型分佈的復雜程度較之第四、第五空間型更大,年和各季分佈比較中多個荷中心常出現正相反的,但中心仍以柴達木盆地、準格爾盆地和塔里木盆地為主。
  15. The traditional static location area scheme used in the location updating procedure of mobile communications has many problems, such as lack of flexibility, ms oscillating between la borders, focused signaling load on border cells, etc. in this paper we present a new adaptive location updating scheme, which can solve the above problems, and can change easily to other la schemes. the scheme uses multi - level las, selected according to single ms s mobility and call characteristics, to make the best tradeoff between wireless signaling cost of location updating and paging

    在移動通信的位置更新過程中,傳統的靜態位置區方案存在著缺乏變化的靈活性、邊界振蕩、信令過于集中問題,本文提出了一種新的自適應位置更新方案,採用不同級別的位置區,位置區的選擇根據移動臺當時的移動和呼叫,按照使位置更新和尋呼的線信令總代價最小的原則確定.該方案可有效地解決靜態位置區的各種問題,並能方便地與其它位置區方案切換
  16. Hongkong post shall not in any event be liable for any damages whatsoever arising out of or related to the downloading, installation or use of or inability to download, install or use the software, including but not limited to direct, indirect, special, incidental, or consequential damages, and damages for loss of business profits, business interruption, loss of business information, or other pecuniary loss, even if hongkong post has been advised of the possibility of such damages, whether such liability is based on contract, tort, warranty, or any other legal or equitable grounds

    在任何下香港郵政不會就因下、安裝或使用,或未能下、安裝或使用軟體,或相關而引致的任何形式損毀上責任,這些損毀包括但不限於直接、間接、特別、附帶或相關的損毀,以及有關損失商業利潤、業務暫停、損失商業資料或其他金錢上的損失。即使香港郵政事先知悉可能引致損毀(不論這些損毀是基於合約、侵權行為、保證或其他法律或可衡平的理由而引致) ,亦上法律責任。
  17. Hongkong post shall not in any event be liable for any damages whatsoever arising out of or related to the downloading, installation or use of or inability to download, install or use the software, including but not limited to direct, indirect, special, incidental, or consequential damages, and damages for loss of business profits, business interruption, loss of business information, or other pecuniary loss, even if hongkong post have been advised of the possibility of such damages, whether such liability is based on contract, tort, warranty, or any other legal or equitable grounds

    在任何下香港郵政均不會就因下、安裝或使用,或未能下、安裝或使用軟體,或相關而引致的任何形式損毀上責任,這些損毀包括但不限於直接、間接、特別、附帶或相關的損毀,以及有關損失商業利潤、業務暫停、損失商業資料或其他金錢上的損失。即使香港郵政事先知悉可能引致損毀(不論這些損毀是基於合約、侵權行為、保證或其他法律或可衡平的理由而引致) ,亦上法律責任。
  18. From the experiments, the number and width of fracture are obviously decreased, and pasting cfrp laminates play important role in improving rc construction durability ; with anchoring, premature is prevented and the ultimate shear capacity is increased ; taking properly anchoring measure, the ultimate shear capacity of rc t - section beams of initial loads is higher than that of no initial loads ; under non - anchoring case, because the rehabilitation of rc t - section beams with cfrp laminates are destroyed suddenly, the reinforcement effect maybe decrease

    試驗結果表明,粘貼碳纖維布顯著減小了鋼筋混凝土t梁的裂縫數量和寬度,抑制了裂縫的開展,對提高普通鋼筋混凝土構件耐久性有重要作用;採用適當的錨固措施可以有效防止構件發生早期破壞,提高構件的極限抗剪能力;對于有錨固的粘貼方式,有預加的t梁抗剪極限承力明顯高於預加的t梁。試驗還表明,在錨固的下,用碳纖維布作抗剪加固后的t梁破壞較突然,有可能使梁的加固效果出現效應。
  19. It is usually measured without a load applied

    它的測量通常是在進行的。
分享友人