煤氣總管 的英文怎麼說

中文拼音 [méizǒngguǎn]
煤氣總管 英文
gas collecting main
  • : 名詞(黑色固體礦物) coal
  • : Ⅰ名詞1 (氣體) gas 2 (空氣) air 3 (氣息) breath 4 (自然界冷熱陰晴等現象) weather 5 (氣味...
  • : Ⅰ動詞(總括; 匯集) assemble; gather; put together; sum up Ⅱ形容詞1 (全部的; 全面的) general; o...
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • 煤氣 : coal gas; gas
  1. Abstract : apply computer simulation to the distribution pattern of air - flow without considering the cold condition of the combustion and compare the flow patterns under different designed circumstances. and the effect of the design of the partition in the air way of the burner on the flow and mixture of gas and air is especially studied. the result shows that the design of partition plays a very important role in strengthening the mixture of gas and air, but increases the loss of the resistance in the air way and the total pressure of the air way in same working conditions needs increasing

    文摘:應用計算機模擬的方法,在不考慮燃燒的冷態情況下,研究了熱風爐燃燒室內的流分佈規律.在此基礎上,比較了2種不同設計方案的流流動特徵,尤其是研究了燃燒器空通道內阻流板的設置與否對空的流動和混合的影響.結果表明,阻流板的設計對加強空的混合有著極為重要的作用,同時也增加了空道的阻力損失,在同樣的工況條件下需要提高道系統的壓力
  2. The total construction capacity of the project is 10, 000t / a including automobile castings, supporting castings for coal mine and coal gas coking system

    項目建設規模為年產10000噸,以汽車配件鑄件、礦配套鑄件、焦化系統配套鑄件,三齊下。
  3. The gas main explode and set fire to the house

    煤氣總管爆炸引起房子失火。
  4. The workman accidentally drilled a hole in the gas main

    那個技工意外地在煤氣總管上鉆了一個洞。
  5. The mains network extends throughout hong kong via a 122 - kilometre high - pressure pipeline and some 2 788 kilometres of distribution mains

    由一條長122公里的高壓道和長約
  6. The mains network extends throughout hong kong via a 108 - kilometre high - pressure pipeline and some 2209 kilometres of distribution mains

    的供應網路遍布全港,各區的由一條長108公里的高壓道以及長約2209公里的分配主喉輸送。
  7. The gas is supplied through an integrated distribution system to about 1. 23 million customers. the mains network extends throughout hong kong via a 108 - kilometre high - pressure pipeline and some

    的供應網路遍布全港,各區的由一條長108公里的高壓道以及長約
  8. T he land area planned for nanxiang high - tech park is 12000 mu. today, its infrastructure construction has been completed. water, gas and poewer supply, drainage system, and telecommunication network have all been installed. roads have been constructed and opened to traffic. around the park there are 7 banks, 6 supermarkets, 8 colleges and schools

    南翔園區體規劃土地面積約12000畝, 「七通一平」基礎設施一步到位:給水道接通、雨水排放疏通、污水納入市政網、道聯通、電力系統、電信網路順通、 「四縱四橫」道路平坦暢通。
分享友人