熱巖土工程學 的英文怎麼說
中文拼音 [rèyántǔgōngchéngxué]
熱巖土工程學
英文
thermal geotechnics-
Along with construction of hydropower project, exploitation of ore, deposition of nuclear waste, development of terrestrial heat and so on, more and more geotechnical engineering is in the high hydraulic head, and deep embedded geohydrological condition, the hydraulic fracturing of rock mass is paid more and more attentions by engineering scholars
隨著水電工程建設、井工礦石開采、地下核廢料儲存、地熱開發等越來越多的巖土工程都處于高水頭、大埋深等惡劣水文地質條件下,巖體水力劈裂逐漸受到越來越多工程界學者的關注。Wu, po - kai, 2003, “ particle size effects on soil - reinforcement interaction in direct shear tests ”, ph. d. dissertation, department of civil engineering, the university of tokyo, japan
吳博凱, 1996 , 「巖樣熱傳導試驗及深巖層地溫推估模式」 ,碩士論文,土木工程研究所,國立交通大學Under the influences of random variabilities, during both construction period and operation period, the temperature field within a gravity dam body could be regarded as a random one. in this paper, stochastic finite element methods are suggested to deal with the random temperature field. by use of the suggested methods, the influences of random environmental and random hydration heat of concrete and the initial temperature of concrete as well as the thermal parameters of both concrete and rock foundation are all taken into account. according to a scheduled time table of construction, random temperature fields of a typical concrete gravity dam within both the construction period and the operation period are calculated by emulation the layer constructing of the dam. some useful conclusions are obtained from the computational results
由於施工期和運行期各種隨機因素的影響,使重力壩溫度場成為隨機.本文綜合考慮了環境溫度(包括氣溫和庫水溫度) 、混凝土絕熱溫升、入倉溫度以及混凝土和基巖的熱學參數隨機性的影響,基於隨機有限元法,給出了重力壩隨機溫度場的計算方法,對一典型重力壩按給定的施工進度模擬分層澆築施工過程,對施工期及運行期前期的隨機溫度場進行了計算,並得出了一些有益的結論
分享友人