爆壓高 的英文怎麼說
中文拼音 [bàoyāgāo]
爆壓高
英文
explosive pressure on m/e is too high-
Exploding wires phenomenon is that if the high - density energy is poured into metal wire with small transverse section in a short time from high power pulse source, the metal wire will explode into gaseity and generate significant shock wave. the. fundamental reason of the generated shock wave is the plasma
爆炸絲現象( explodingwiresphenomenon )是將存儲于高壓電容器中的能量,在極短的瞬間內傾注于很小截面積的金屬絲,使之汽化,產生強大的沖擊波,這種沖擊波產生的根本原因就是等離子體。The rapid expansion of the bubble of hot, high-pressure gases formed in the underground burst initiates a shock wave in the earth.
由於地下爆炸所形成的熱高壓氣泡迅速澎脹,在地面上便產生沖擊波。Because liquefied gas " own characteristic, such as low temperature, high pressure, inflammability and explosibility, there are many hidden dangers in handling the liquefied cargo and shipping at sea
液化氣運輸船在其靠港裝卸貨物和海上運輸過程中存在著很多事故的隱患,其危險性主要是由於液化氣本身的低溫、高壓、易燃和易爆等特性所致。( 2 ) the liman problem is normally adopted to check the liability of numerical method. the calculation error was within 9 % by comparison with the theoretic solutions of liman problem in the following case, the dimensionless calculation length was 2 with high pressure zone 0. 8, and the dimensionless state parameters were p1 = 2, p2 = 1, p1 = p2 = 1, u1 = u2 = 0. experiment results in literature [ 8 ] were used to check the adaptability of the numerical model developed here for unconfined gas cloud explosions and the calculation error was within 13 %
( 2 )數值方法的可靠性通常用黎曼問題的解析解檢驗,本文以無量綱計算區長度為2 ,高壓區長度為0 . 8 ,狀態參數為p _ 1 = 2 , p _ 2 = 1 , _ 1 = _ 2 = 1 , u _ 1 = u _ 2 = 0條件下的黎曼問題解析解對所編制的爆炸場計算程序進行了考核,結果表明該程序的計算誤差在9以內;為考核本文計算模型預測開敞空間氣雲爆炸的適用性,以文獻[ 8 ]的實驗數據進行了校核,計算誤差在13以內。In the process of construction, some special geological hazards will be met because of the great depth and long distance, such as high external waterpressure, watergushing, high geostress, rockburst, high geotemperature and nocuous gas and so on. these geological hazards become the main restricted factors of tunnel construction
大埋深將使隧洞開挖施工時遭遇到如高外水壓及高壓涌水、高地應力及巖爆、高地溫、高瓦斯有害氣體等一系列地質災害問題,這成為制約深埋隧洞建設快速發展的主要因素。The way of taking one nth out of capacitor ' s the first harmonic capacitive reactance as its nth harmonic impedance is verified whit the data from tang7c. according to the approximately estimating method, the first harmonic impedance of 220kv system is calculated. on the basis of the models, this paper gives the harmonic equivalent circuit of substation and gives the b ( n ) function of the harmonic time n. when the capacitors has different combination, b ( n ) ' s value will also change, with the inputting local measurement data, the paper studies the series and parallel resonance at the substation, and deduces that the reason the capacitor ' s fuse of tang6c is frequently interrupted is that its capacitor current contains a large number of 5th harmonics, and that the reason the discharging pt of tang7c capacitor being exploded is also that the 7th and 9th harmonic currents are amplified
據此,對該站進行了串聯諧振分析和並聯諧振分析,並結合測試數據和有關變電站的運行記錄,指出了導致該站電容器湯6c頻繁燒保險的主要原因是5次諧波電流含量偏高,引起湯7c放電pt爆炸也是因為7次和9次諧波電流被放大。針對這些導致湯陰變電站補償電容器故障的原因,提出了相應的諧波治理措施,包括針對湯6c電容器5次諧波電流含量偏高的原因,提出了停運湯6c電容器或者通過把湯sc電容器的部分容量併入湯6c電容器(湯sc其餘部分停運)以增加湯6c諧波承受能力的措施;針對# 2變低壓側7次和9次諧波電流被放大的現象,提出了在湯7c電容器上加裝一定百分比的串聯電抗器的措施。And even if a bomb detonates, it might not work as planned ; aloha airlines flight 243 ? and most of its crew and passengers ? survived a structurally related explosive decompression at 24, 000 feet in 1988 that removed a large section of the top half of the fuselage
1988年,阿羅哈航空243班機便在7300公尺的高空中因為炸彈爆炸而減壓,當時機身的上半部都掀掉了,但大部份的機組人員和乘客卻都活了下來。The research shows that : 1 ) the ductility of the hsc bending members constructed is much greater than 5 ; 2 ) increasing the vertical links and distribution steel can increase the deflection under ultimate moment ; 3 ) with appropriate compressive bars, vertical links and distribution steel the increase of moment after yield and the decrease of moment under ultimate moment can be ignored, so the ductility of the hsc bending member is much larger ; 3 ) the width / depth ratio of hsc bending member has no obvious effect on the ultimate compressive strain of concrete ; 4 ) the method used here to calculate the deflection is applicable ; 5 ) the location of crack coincides with the location of vertical links and distribution steel ; 6 ) the bending property of the hsc structure under the blast load can meet the demand of protective engineering
研究表明:本文研究的梁、板構件的延性比遠大於5 ;增加箍筋(鉤筋、分佈筋)含量,可以提高壓區混凝土剝落時的撓度;在適當的受壓筋、箍筋(鉤筋、分佈筋)含量下,可以忽略壓區混凝土剝落瞬間的承載力下降,從而大大提高構件的延性;受彎構件的寬高比對壓區混凝土極限應變的影響不明顯;受彎構件的裂縫間距受箍筋(鉤筋、分佈筋)的布置影響;文中所用的承載力和變形計算方法是可行的。化爆試驗表明,高強混凝土構件的動載抗彎性能能夠滿足防護結構的要求。Digital temperature transmitter, digital level, explosion - proof electric contact manometer figures generally used manometers, vacuum table, table vacuum pressure, oxygen forms of electric contact manometer, explosion - proof electric contact manometer seismic contact ammonia electricity connections. contact monometers assisted magnetic, seismic, heat - resistance, acid and alkali resistance, chlorine, sulfur - resistant, stainless steel pressure gauge. divide manometer shenyang city, the total, precision manometer, out of the wind pressure gauge, film boxes pressure gauge, diaphragm pressure gauge
主要產品包括:數字壓力表,數字膜盒壓力表,數字溫度表,數字壓力變送器,數字溫度變送器,數字液位計,數字防爆電接點壓力表,一般用壓力表真空表壓力真空表氧氣表電接點壓力表防爆電接點壓力表耐震電接點氨用電接點磁助式電接點壓力表耐震耐高溫耐酸耐堿耐氯耐硫全不銹鋼壓力表隔膜壓力表沈陽市優質產品精密壓力表出風壓力表膜盒壓力表膜片壓力表全不銹鋼膜片壓力表鈦壓力表及出口全不銹鋼,充油全不銹鋼系列壓力表,壓差表,壓力變送器,各種軸向軸向帶邊法蘭連接等多種形式。Theoretic and exprimental study of an explosive magnetic flux compression generator with high energy output
高能量爆磁壓縮電流發生器理論分析與實驗研究In the end, the mechanism of explosive accidents of lpg vessel under high temperature is analyzed. the major inducements of lpg vessel under high temperature are as follows : 1 ) sudden falling of pressure on valve opening ; 2 ) material strength falling of vessel wall, which is caused by high temperature of vessel wall ; 3 ) thermal stress that is caused by non - uniform temperature of vessel wall
武漢理工大學碩士學位論文? ?論文最後分析了高溫環境下液化氣容器爆炸的事故機理,即高溫環境下液化氣容器爆炸的主要誘因為: 1 )閥門打開時的壓力驟降; 2 )容器壁溫度過高,導致容器壁的材料強度降低; 3 )容器壁的溫度不均勻引起的熱應力。This paper aims at the characteristics of thermal response of lpg vesse1 under high temperatue, conjoining the project of " study on transportation safety early - wdring system of lpg dangerous goods " supported by transportation departinen of china and the project of " mechanism study and numerical simulation of the explosion of lpg vessel " supported by science foundation of hubei province. the interdisciplinary research has been done among temperature field distribution of lpg vessel under flame surroundings, intensity calculation, crack propagation predication and mechanism of explosive accident, etc. three parts are analyzed and discussed
本文針對高溫環境下液化氣壓力容器的熱響應特性問題,結合交通部重點科技項目「液化氣體類危險品運輸安全預警系統的研究」和湖北省自然科學基金項目「液化氣容器爆炸機理研究及數值模擬」 ,對在火焰包圍下的液化氣壓力容器的溫度場分佈、強度計算、裂紋擴展預測以及爆炸事故機理等方面開展了多學科的交叉研究。Firstly, when the 10kv high pressure motor start up, the rate of false action caused by automatic switch protector ( asp ) will raise dramatically ; secondly, at moment of on / off switch, great electromagnetic flux induced in the asp cause damage
一是在10kv高壓電機的啟動時,高爆保護器的誤動作率明顯提高;二是在分合閘瞬間,較大的電磁影響甚至造成了保護器的損壞。This text has analyzed the mechanism that relieving - shot control the deformation of roadway country rock, and the sureness of the rational parameter, relieving - shot is practiced in south high - pressure 31022 haulageway in gedian mine of shenhuo group, through the deformation data of two sides roadway and the roof - floor after releasing pressure, the effect of releasing pressure is verified, and relieving - shot parameter is rational
本文分析了卸壓爆破控制巷道圍巖變形的機理,以及合理參數的確定,並在神火集團葛店礦高地壓南31022機巷進行了卸壓實踐,通過卸壓后的巷道兩幫以及頂底板的變形量數據,證實了卸壓爆破起到了很好的卸壓效果,且卸壓爆破參數是合理的。It ' s the first time to explore the combustion characteristics of lpg / diesel mixing fuel engine, and find that, with the change of load and rotation, the changing trend of the ignition delay period of e10 mixing fuel is almost as identical as that of the diesel, but that of e30 mixing fuel is very different. comparing with diesel, the combustion of e10 is improved slightly, but that of e30 greatly changes ; the maximum eruptive pressure decreases ; the maximum pressure increase rate decreases ; the highest releasing heat rate increases ; the highest combustion temperature falls ; the ignition delay period extends
結果表明: e10混合燃料與柴油的著火滯燃期隨負荷和轉速的變化趨勢基本一致; e30混合燃料與柴油則有所不同; eio混合燃料發動機的燃燒與純柴油相比,略有改善; e30混合燃料的燃燒特性發生明顯的變化,最高爆發壓力下降,最大壓力升高率減小,最大燃燒放熱率增大,最高燃燒溫度下降,滯燃期延長。Based on the theoretical analysis and design practice in successful development of allway desiel engine in china, the design concepts of key parts and components of engine, in particular the cylinder block and cylinder head, are analyzed for meeting the requirements for high performance and low emission as well as normal and reliable operation of diesel engine for medium and heavy commercial vehicle under high combustion pressure and high thermal load
摘要結合我國自主開發的「奧威」發動機在設計工作中的理論分析與實踐,就低排放中重型商用車柴油機在開發工作中為滿足高性能、低排放的要求及在高燃燒爆發壓力和高熱負荷下正常可靠地工作,對發動機的關鍵零部件,尤其是缸蓋與缸體的設計概念進行了分析。The quasi - geostrophic process was diagnosed for a case of severe cold air breakout under the blocking situation during 16 - 18 march of 1998. the attention was focused on the relationship between the surface anticyclone and 500hpa blocking high. the results indicate that the cold outbreak is associated with the adjustment of blocking situation in the ural area, i. e. the collapsing and rebuilding of the ural mountain blocking high. the temperature advections in the lower troposphere shown that the polar cold air invading from the northwest caused the ural blocking high collapsed, and a new ridge developed rapidly was due to the warm advection on the southwestern side which led to the ural blocking high rebuilt. in addition, the distribution of the vertical motion on 700hpa shown that the surface high splitting was related to the considerable upward motion located on the southeastern part of surface high
對1998年3月中旬一次高空阻塞形勢下強冷空氣過程進行了診斷分析,著重討論強冷空氣爆發前後地面反氣旋活動與高空阻塞形勢調整的關系。研究結果表明,強冷空氣的爆發與烏拉爾地區阻塞形勢的調整阻塞高壓的崩潰和重建緊密相關。對流層下部的溫度平流分析表明,阻塞形勢的調整是由於阻塞高壓上游西北方有冷空氣侵入導致了阻塞高壓的崩潰,而上游來自西南方向的強暖流則導致高壓脊迅速發展,使阻塞高壓重新建立。Flameproofhigh - voltage cable coupling devices for coal mine
煤礦用隔爆型高壓電纜連接器Mine explosion - proof high - voltage distribution device
礦用隔爆型高壓配電裝置Pbg type flameproof high voltage vacuum power distribution set series and bbd type flameproof low voltage protection case series are appropriate to environment with explode gas in underground coal mine
Pbg型礦用隔爆型高壓真空配電裝置系列和bbd型礦用隔爆型低壓保護箱系列,適用於煤礦井下具有爆炸性氣體的環境中。分享友人