爆破坑 的英文怎麼說

中文拼音 [bàokēng]
爆破坑 英文
demolition pit
  • : 動詞1. (猛然破裂或迸出) explode; burst 2. (放在滾油里快炒) quick-fry
  • : Ⅰ動詞1 (完整的東西受到損傷) be broken; be damaged 2 (使損壞) break; break down; damage 3 (使...
  • 爆破 : blow up; blast; burst; demolish (by explosives); detonate; explode; dynamite
  1. As the increase of domestic high - rise buildings, more and more deep foundation trench supporting constructions have come into existence. among the general geographical condition of the urban district in qingdao, most of regions, which mainly consist of strong de composed rocks, are in quite good condition. except for the sandy soil and oozy soil along sea sides. but the development of rock cracks and breaking zones and unstable lamprophyre still exist, so blasting is needed during constructions of foundation trench. blasting have bad influence on the stability of slopes. moreover. the slope - liding has happened for several times, so the engineering project of foundation trench attracts more attention of people

    隨著國內高層建築的發展,深基支護工程越來越多,綜合青島市區的地質狀況,除海邊有砂性土及淤泥軟土外,大部分地域巖土條件相對較好,多以強風化巖為主,但巖石裂隙發育,間或有斷裂帶和穩定性極差的煌斑巖穿插其中,基施工時需要施工,對邊坡的穩定造成了不利影響,加之連續出現的幾次滑坡失穩事件,基支護工程越來越引起了各方面的重視。
  2. In order to make the best use of explosive energy in loosing soil or throwing it onto some area and ensuring the bottom meet some leveling requirements after blasting, a plane charge layout is often adopted according to blasting design and engineering quality requirements in open chamber blasting such as mine exploitation, field leveling and foundation pit excavation of construction

    摘要在礦山剝離、場地平整以及建(構)築物基開挖等露天中,為了充分利用炸藥能量將巖石松動或拋擲到一定區域,並確保底板滿足一定平整度要求,按照技術設計和工程質量要求,需要設計平面布藥結構。
  3. Blasting and dismantling of a 5 - floor washing workshop and its washing pool

    五層框架洗煤車間及樓內洗煤澇拆除
  4. Deep foundation trenches in shallow rocks in some cities along a seashore like qingdao, dalian, zhuhai things like that often need to be dug or exploded into hard rock, there are heaving sand, soft soil, groundwater upon it

    青島、大連、珠海等基巖埋深淺的沿海地區深基經常需要挖至基巖甚至需要開挖,基巖以上又有流砂、軟土、地下水等。
  5. Abstract : the cause for blasting toes in open stope of tiegukeng mine was analyzed, the corresponding modification measures were proposed and the blasting effect of the stope were improved

    文摘:對鐵古礦露天采場產生根底的原因進行了分析研究,提出了相應的改進措施,使采場效果得到了改善。
  6. This paper is based on the construction of jiangbei airport station of the chongqing no. 3 light railway, the control demolition applied to shallow covered and large foundation pit excavation under urban complicated condition is introduced

    摘要以重慶輕軌三號線江北機場站為例,介紹了城市復雜環境條件下淺埋隧道、大基開挖控制施工方法。
  7. Monitoring the blasting seimsicity of a complicated foundation pit

    某復雜基地震監測
  8. The constructing technique for smooth blasting of reserved smooth blasting layer in long - pit tunnel

    隧道預留光層光面施工技術
  9. In the demolition designing, using different demolition parameters according to the different external conditions with adopting a series of comprehensive shock absorption steps, the influence of excavation demolition on the outside construction is decreased to the least degree

    設計中,根據點周圍不同的外部環境,採取了不同的參數,並採用了一系列綜合減震措施,開挖對隧道及基周圍建築物的影響降低到很小程度。
  10. Taking a qingdao hotel second phased project deep hole excavated for building foundation as example, the paper introduces the application of the demolition vibration in the complex peripheral environment and the geological condition, the influence, crag body vertical excavates regarding nearsightedness, the pre - stressed anchor rod and the earth nail unify support and protect the technology in the project of the crag body side slope

    摘要以青島某飯店二期工程深基為例,介紹了在復雜的周邊環境和地質條件以及有振動的影響下,對于近似垂直開挖的巖體邊坡,預應力錨桿與土釘結合的支護技術在邊坡支護工程中的應用。
  11. ( 5 ) ln excavating in the base hole of the second stage of the project of sanxia, the powder bag is blown up and tested after goning on and can gather, and blows up and tests the optimization and scene which blows up the parameter according to the analysis achievement of finite element, have made certain test achievement

    ( 5 )在三峽二期工程基開挖中,進行了聚能藥包試驗,並根據有限元分析成果進行了參數的優化和現場試驗,取得了一定的試驗成果。
  12. An open excavation or pit from which stone is obtained by digging, cutting, or blasting

    採石場通過挖掘、切割或巖石來獲取石料的露天道或洞
  13. Determination of parameters of smooth wall blasting of fenghuangshan copper mine

    全斷面深孔光面技術在窯隧洞中的應用
分享友人