爆破巖層 的英文怎麼說

中文拼音 [bàoyáncéng]
爆破巖層 英文
burden
  • : 動詞1. (猛然破裂或迸出) explode; burst 2. (放在滾油里快炒) quick-fry
  • : Ⅰ動詞1 (完整的東西受到損傷) be broken; be damaged 2 (使損壞) break; break down; damage 3 (使...
  • : 名詞1. (巖石) rock 2. (巖峰) cliff; crag
  • : i 量詞1 (用於重疊、積累的東西 如樓層、階層、地層) storey; tier; stratum 2 (用於可以分項分步的...
  • 爆破 : blow up; blast; burst; demolish (by explosives); detonate; explode; dynamite
  1. The following example concerns the blasting of the last five metres towards a house with its foundations in bedrock.

    下面的例子是關于向著一座地基在上的房屋的最後5米的情況。
  2. As the increase of domestic high - rise buildings, more and more deep foundation trench supporting constructions have come into existence. among the general geographical condition of the urban district in qingdao, most of regions, which mainly consist of strong de composed rocks, are in quite good condition. except for the sandy soil and oozy soil along sea sides. but the development of rock cracks and breaking zones and unstable lamprophyre still exist, so blasting is needed during constructions of foundation trench. blasting have bad influence on the stability of slopes. moreover. the slope - liding has happened for several times, so the engineering project of foundation trench attracts more attention of people

    隨著國內高建築的發展,深基坑支護工程越來越多,綜合青島市區的地質狀況,除海邊有砂性土及淤泥軟土外,大部分地域土條件相對較好,多以強風化為主,但石裂隙發育,間或有斷裂帶和穩定性極差的煌斑穿插其中,基坑施工時需要施工,對邊坡的穩定造成了不利影響,加之連續出現的幾次滑坡失穩事件,基坑支護工程越來越引起了各方面的重視。
  3. The testing of earthquake effect caused by blasting in bedded rock

    地震效應的測試
  4. Study on blasting seismic dynamic effect for tunnels with close interval in bedded rock mass

    體中近鄰雙線隧道的振動響應研究
  5. Application of staged burn - cut in shaft blasting in limestone

    分段直眼掏槽在石灰井筒中的應用研究
  6. The hydrothermal breccia and karst in the beiya area are divided into 4 types and zones, including : sedimentary tuff and breccia induced by hydrothermal explosion and sedimentation on land surface ; hydrothermal sedimentary conglomerate and gas - explosive ejecting breccia related to sedimentation in and collapsing of some shallow karst caves ; netted hydotherma1 limcstone breccia and hydrothermal explosive breccia pipe related to hydrofracturing, corrosion and explosion in the hydrothermal channels ; and yellow granular limestone formed by simmering and alteration in the deep heated water reservoir

    北衙地區熱水角礫和熱水溶可分為4種類型和次,即地表相發沉積作用形成的沉積凝灰角礫、熱水沉積鮞狀灰與鈣華膠結角礫;與近地表洞穴沉積和垮塌作用有關的熱水沉積礫和汽射流角礫;與熱水通道相蝕裂和角礫化作用有關的網路狀灰角礫筒和熱水隱角礫筒;深部相熱水浸煮蝕變灰
  7. ( 4 ) by use of dynamic strain testing, the ultrasonic wave, bedded composite rock damage and fracture mechanisms and the fragmentation process during blasting have been experimentally studied

    ( 4 )運用超動態應變測試技術、超聲波檢測儀對狀復合體的損傷壞機理和壞過程進行了實驗研究。
  8. The one side of some hillside limestone quarry is high bedded rock slope, so the stability of this slope is a primary problem of mine safety, and the earthquake effect caused by blasting is one of great factors influencing slope stability

    摘要某山坡露天石灰石礦的一側為順質高邊坡,其穩定性是礦山安全的主要問題,而影響邊坡穩定的主要因素之一是地震效應。
  9. It is shown how control of the melting of the coating on aluminum particles in a mining explosive helps control the split of the total energy released into shock energy, that supports the detonating shock wave and heave energy, that heaves the overburden off the ore body

    並在此基礎上,對含鋁礦用硝胺乳化炸藥中的鋁粉反應過程進行了理論分析,認為鋁粉的吸熱和放熱反應過程對總能量分配為沖擊波能(用於支持轟波以及)以及拋擲能(用於拋擲)的比例影響明顯。
  10. The ground base of the newly added chute in 4 tailings reservoir at dexing copper mine is characterised by thick weathered layer, loose structure, fractured zone and landslip mass accumulation. as a result, the ground has a great subsidence and inefficient carrying capacity. in view of this, the grouting technology was adopted to reinforce the chute ground base. the on - site testing shows that the subsidence of the chute has been efficiently controlled and the carrying capacity of the ground base improved so that the stability requirement has been met

    潘洛鐵礦主要使用的采礦方法是淺眼落礦的全面法和留礦全面法. 23礦體160m以上礦段上部為氧化礦和風化,形成擠壓和鬆散石覆蓋下的放礦條件.介紹了無底柱分段崩落法在該礦體開采中的應用.實際使用獲得的各項技術經濟指標還比較理想
  11. In the light of the low - lying pile cap foundations designed for main piers no. 2 and no. 3 of tianluo bridge on wenzhou - fuzhou railway. this paper describes the ways to resolve the construction problems of the foundations in deep water in sea and at seabed that is steep and without overburden, using the construction techniques of underwater rock blasting, steel cofferdam floating, positioning, bottom sealing and manual pile digging

    摘要針對溫福鐵路田螺大橋2號、 3號主墩設計上採用低樁承臺基礎情況,介紹運用水下,浮運鋼圍堰就位、封底、人工挖孔樁等施工技術解決海上深水、河床陡峭且無覆蓋的基礎施工難題。
  12. Experimental results for the three gorges right hydro station blasting, project are analyzed. a series of data are evaluated by means of analytic hierarchy process so that the optimal plan is obtained, which includes optional parameters, aic technology

    接著通過對三峽右岸電站試驗的結果進行分析和整理,取得了一系列的數據,運用次分析法對這些數據進行處理,得到最優方案。
  13. Under the consideration of the engineering geological condition of dahuashui hydropower station, the pre - splitting blasting technology and reasonable construction method are adopted for the excavation of the dam foundation in accordance with the analysis on the rock strata therein, in which the design of the blasting parameters and powder charging structure as well as the angle control and the height of the excavating steps are particularly determined, and then better splitting effect is got for the slope excavation and the quality requirement of the construction is satisfied as well

    摘要結合大花水水電站大壩工程地質條件,通過分析具體情況,採用預裂施工技術,合理施工方法進行壩基開挖,並對參數和裝藥結構的設計,鉆孔的角度控制和梯段高度精心確定,使該邊坡開挖預裂取得良好的效果,保證了壩基開挖的質量要求。
  14. Concerning the construction of the shallow cover and the special shallow cover in the tunnel under the special geology conditions, the principle of " to stabilize the slopes with protecting arch ; to strengthen the earth with the pipe - shield support grouting ; to dig a hole shallowly ; to blast slightly ; to use strong supporting structure. " has been adopted to enter the tunnel safely ; in terms of the broken belt, the effective actions such as the pipe - shield support grouting, strengthening the surrounding rock in advance with advanced bolt and steel grids, and so on, are taken to pass the poor conditioned part smoothly

    對于特殊地質中的淺理、特淺埋進洞的施工,堅持「護拱穩定邊仰坡,大管棚注漿加固土體,淺打眼、弱、強支護」的原則,做到安全進洞;對于斷碎帶,則採取了管棚注漿,超前錨桿預先加固圍並結合鋼格柵支撐等有力措施,順利通過了不良地段。
  15. Design technique and construction method of pile rock blasting of high - rise building foundation

    建築基樁設計與施工技術
  16. In this paper, some problems existed in a large - scale blasting with double - stage and multiple - row chambers, which were found during excavating and transporting broken rock, is introduced, the main reasons for the unsatisfactory blasting effect at the place between upper stage chambers and lower stage chambers are analyzed, the influencing effect of blasting of the upper stage chamber to blasting of the lower chamber is discussed, and some principles that should be obeyed in designing large double - stage and multiple - row chambers blasting

    摘要介紹了某萬噸級特大型雙多排藥室碴清運中發現的問題,分析了山體中部上、下藥室之間局部質量差的主要原因,探討了上藥室對下藥室的影響作用機理,並初步提出了大型雙多排藥室設計應遵循的原則。
  17. The main research work include : rock split in advance by the blasting ; the rock objection explored wit ultra sonic and quality evaluation ; a new technique of excavation of a protection layer once time ; deep hole steps explosion test research ; blasting material lest ; the blasting technique research of underground engineering

    主要研究工作有:預裂試驗研究;聲波體探傷及質量評價;保護一次開挖新技術;深孔梯段試驗研究;材料試驗;地下工程開挖技術研究。
  18. Abstract : main construction points of qingfang hospital station on qingdao subway under the condition of hard surrounding rock are described. blasting control and vibration monitoring are stressedly introduced

    文摘:闡述了青島地下鐵道青紡醫院車站在堅硬中的施工要點,重點介紹了控制、震動監測等內容,對于城市硬質石條件下的地下工程具有借鑒意義。
  19. The main factors have been determined to be the depth and width of hole, the strength of surrounding rock, the types of detonator, the decoupling coefficient, burden and unit consumption form what has been discussed, the author make use of those major factors as standard of affection and studied bp neural networks " work principle, structure and defectiveness. a model of modified bp neural networks has been used to built model in order to identify selection and optimize of blasting in rock anchor beam. triumphant parameter design of blasting were selected as a example, in order to perform network of parameter design

    確定以炸藥類型、最小抵抗線、孔深、炮眼間距、不耦合系數、線裝藥量、石強度和體完整度為主要影響因素;把改進的bp演算法應用在參數優化設計中,建立以炸藥類型、最小抵抗線、炮孔深度、炮眼間距、線裝藥量、不耦合系數、石強度和體完整度為主要影響指標,選擇45例國內外成功的參數設計實例為樣本,利用bp神經網路進行參數優化設計,並通過現場保護臺修面試驗以及對其松動圈范圍進行聲波測試,其測試結果最優的方案其松動圈最小,這與神經網路進行參數優化設計的方案相吻合。
  20. ( 5 ) based on the structure of dyna - 2d program in which rock and bedded composite rock blasting damage principal model was embedded, number simulation of the rock blasting process is realized, which proves built model accurate and reasonable 。

    ( 5 )將建立的損傷本構模型和狀復合體本構模型嵌入dyna - 2d程序框架,對體的損傷壞過程進行了數值模擬,其結果驗證了理論模型的正確性和合理性。
分享友人