爆破的巖石 的英文怎麼說

中文拼音 [bàodeyándàn]
爆破的巖石 英文
shot rock
  • : 動詞1. (猛然破裂或迸出) explode; burst 2. (放在滾油里快炒) quick-fry
  • : Ⅰ動詞1 (完整的東西受到損傷) be broken; be damaged 2 (使損壞) break; break down; damage 3 (使...
  • : 4次方是 The fourth power of 2 is direction
  • : 名詞1. (巖石) rock 2. (巖峰) cliff; crag
  • : 石量詞(容量單位, 十斗為一石) dan, a unit of dry measure for grain (= l00 sheng)
  • 爆破 : blow up; blast; burst; demolish (by explosives); detonate; explode; dynamite
  1. Blasting effects on rock damnification and its control

    損傷影響及損傷控制研究
  2. Sonic wave analysis on uncoupled explosive - charging structure for damnification of hole wall rock

    不耦合裝藥對孔壁損傷聲波分析
  3. There are certain difficulties in studying the failure process of frangible materials such as concrete, rock, etc which are caused by dynamic loads such as collision, earthquake, exploding, etc by those current exited numerical methods like finite element method etc. so in order to solve such a problem we should introduce certain new numerical analysis method

    現存一些數值方法如有限元法等在研究混凝土、等脆性材料在沖擊、、地震等動荷載作用下壞過程問題中存在著一定困難。因此,對於此類問題需要新數值分析方法。
  4. As the increase of domestic high - rise buildings, more and more deep foundation trench supporting constructions have come into existence. among the general geographical condition of the urban district in qingdao, most of regions, which mainly consist of strong de composed rocks, are in quite good condition. except for the sandy soil and oozy soil along sea sides. but the development of rock cracks and breaking zones and unstable lamprophyre still exist, so blasting is needed during constructions of foundation trench. blasting have bad influence on the stability of slopes. moreover. the slope - liding has happened for several times, so the engineering project of foundation trench attracts more attention of people

    隨著國內高層建築發展,深基坑支護工程越來越多,綜合青島市區地質狀況,除海邊有砂性土及淤泥軟土外,大部分地域土條件相對較好,多以強風化為主,但裂隙發育,間或有斷裂帶和穩定性極差煌斑穿插其中,基坑施工時需要施工,對邊坡穩定造成了不利影響,加之連續出現幾次滑坡失穩事件,基坑支護工程越來越引起了各方面重視。
  5. It also expounds the advantages of mixed loading explosive exploding. at the same time, the lateral and bottom fractural range of bench shooting in deep - hole of rock are tested, analyzed and calculated

    同時對產生應力波、生氣體對影響也作了介紹,並分析了力學性質與可性之間關系。
  6. According to the stress wave theory on explosive exploding propagating in the rock, it builds up mathematical model of fractural ranges in the rock, and carry out actual calculation and analysis on fractural range of bench shooting in deep - hole. as a result of calculation, the lateral and bottom fractural range are about 1. 9m

    根據炸藥炸在中傳播應力波理論,建立裂范圍數學模型,並對深孔梯段裂范圍進行了實行計算分析,計算結果為:混裝乳化炸藥深孔梯段側向底部裂范圍為1 . 9m 。
  7. Application of staged burn - cut in shaft blasting in limestone

    分層分段直眼掏槽在井筒應用研究
  8. In numerical simulation, the elastic zone is only considered and the effect of blasting waves on the rock medium, after attenuating through crushing zone and ruptured zone, becomes an input load

    數值模擬僅考慮彈性區域,炸波對介質作用經粉碎區、裂區衰減后成為輸入荷載。
  9. 1. setting a measure device on the drilling machines, a new method of gaining the characters of rock and soil from the blasting drilling is gotten, which is economic and accurate and from which the characters of different parts of the blasting hole are got accurately

    取得主要成果如下: ( 1 )在鉆孔機械上附加一測量鉆孔鉆進速度裝置,通過在土施工現場直接從鉆孔鉆進過程來實時獲取炮孔不同部位性質。
  10. ( 2 ) based on the existing damage model of rock blasting and the theory of rock damage and fracture, a new damage model for rock blasting has been founded

    ( 2 )在分析現有損傷模型和損傷斷裂理論基礎上,建立了新損傷模型。
  11. Pressure decouple effect of eccentric decouple charge blasting is researched according to cement mortar model testing, meanwhile comparable testing of smooth blasting of eccentric and centric charge is researched on rock with sonic velocity evaluation in this paper

    摘要通過水泥沙漿模型試驗研究了偏心不耦合裝藥偏心效應,同時在塊體上通過聲速評價對比試驗,研究了藥柱偏心和同心光面
  12. Depend on the precise blast design with small error and strictly controlling the explosive consumption, they controll blasting construction for rock availably, complete the excavation for rock cuttings of broaden and rebuilding project for city roads successfully, and obtain well social benefit and economical benefit

    通過續密微差設計,嚴格控制裝藥量,有效地控制了施工,成功地完成了城市道路拓寬工程路塹邊坡開挖工程。
  13. Combining longshou waterpower station project the mechanism of rock excavation explosion and production test method are studied more completely

    本文結合龍首水電站工程,較全面地研究了開挖機理及生產試驗方法。
  14. The effect of blast quake, the rule of slope failure and the controlling technique were made up as a whole in this paper to research. the main research foucs on : first, investigation of in site engineering geology and hydrological geology ; second, blast design and in site measurement : on the basis of the first stage work, considering special rock condition, blast design, blast test and measurement in site were made in the same time. the propagation rule of blast wave in the process of rock excavation, blast quake space and the effect of blast on rock slope were studyed

    本論文將開挖震動效應和邊坡體火穩壞規律及其控制技術作為一個整體進行研究,主要研究內容包括:現場工程地質水文地質調查研究;方案設計和現場測試:在現場工程地質水文地質調查研究基礎上,結合特定條件下條件進行方案設計,同時進行現場試驗和監測,研究路塹開挖過程中產生地震波傳播規律、振動場及質邊坡影響。
  15. The expert system ' s engineering database has the data of the correlative physical - mechanical property of rock, parameters of industrial explosive, blasting accessories and drilling machine

    在該系統中建立了存儲工程實例數據與相關物理力學性質、工業炸藥參數、起器材參數和鑿機參數工程數據庫。
  16. A new method of gaining the characters of rock and soil from the blasting drilling is studied, which is different from general methods and more economic and accurate than them. and a new rock classification is discussed, which involves fuzzy integrated judge method and the affecting factors of drilling

    為更好地進行後期設計如炸藥與優化匹配等,本文綜合考慮各種影響鉆機鉆孔速度因素,首次提出了採用模糊綜合評判方法對鉆孔中獲取其性質進行分級。
  17. If this method is adopted, the work of geologic prospecting can be reduced before blasting construction, which saves a lot of engineering expense. and on the other hand, this method is more accurate than general ones, which is in favor of blasting construction and can reduce the mistakes and the accidents that are unwanted

    這種方法,一方面可以減少地質勘查工作,節約工程開支;另一方面從鉆孔過程中可以獲得每個炮孔不同部位性質,比常用方法更精確,更有利於施工,減少施工中不必要失誤和事故。
  18. ( 5 ) based on the structure of dyna - 2d program in which rock and bedded composite rock blasting damage principal model was embedded, number simulation of the rock blasting process is realized, which proves built model accurate and reasonable 。

    ( 5 )將建立損傷本構模型和層狀復合體本構模型嵌入dyna - 2d程序框架,對損傷壞過程進行了數值模擬,其結果驗證了理論模型正確性和合理性。
  19. On the basis of theory of fracturing mechanics and damage mechanics, the mechanism of damage and fracture by explosion load has been analyzed and studied deeply. and the calculation of blasting damage in rock is explored further by using the combination of the current model for blasting damage and the simulating blasting experiment

    本文利用斷裂力學和損傷力學理論對炸作用下損傷斷裂機理進行了深入分析和研究,並採用現有損傷模型和損傷模擬試驗相結合方法,對體在作用下產生損傷計算進行了新探索。
  20. And in order to acquire the best blasting effect, the optimizing method of blasting parameters based on fuzzy neural network is discussed in this paper, which considers rock characters, explosive characters and blasting requirements. the products of this paper are list as follows

    最優結果不僅僅在於炸藥與優化匹配,同時還受參數等影響,本文引入模糊神經網路方法,綜合考慮性質、炸藥性能、要求等,對參數進行優化設計,提出了基於模糊神經網路參數優化方法。
分享友人