  1. Due to exceedingly flat arched vault of the flat tunnel with outsized span and renewed stress allocation in surrounding rock after excavation, which would inevitably induce some excessively large load on the base of arch, therefore, larger load - bearing capability in the is " foundation is a must. on the other hand, smooth face explosion must be applied to excavation of the arch base to further ensure the integrity and continuity of country rock around tunnel

    特大跨超淺埋隧拱部結構過于扁平,挖后發生二次應力分佈,拱腳處的應力過大,要求有較大的地基承載力,拱腳挖時必須採用光面,保證圍巖的完整性和不受擾動,挖后及時封閉,防止該處積水軟化圍巖。
  2. With the rapid development of road and communication of city, the harm effect that the blast vibration induced by building mass undergrounds or tunnels and digging blast underground structures act on the ground environment, are increasingly remarkable

    隨著路、城市交通事業的迅速發展,大量地鐵、隧的修築,淺埋地下結構的,由此而導致的振動對地面設施,特別是對城市地面建築的危害效應越來越顯著。
  3. An experimental research on notching wet beach of the yellow river with the short - delay blasting is made for eliminating the risk that the main river channel is often threatened by some horizontal and slanting streams occurred on the downstream of the river and solving the problems from the bend cut - off for river channel harnessing, water way dredging and the siltation of the water diversion outlets along the channel

    摘要為了利用解決黃河下遊河經常出現的橫河和料河威脅河安全的險情以及河整治中的裁彎取直、疏浚航和河引水口淤積的問題,在黃河濕灘上進行了微差槽試驗研究。
  4. This paper is based on the construction of jiangbei airport station of the chongqing no. 3 light railway, the control demolition applied to shallow covered and large foundation pit excavation under urban complicated condition is introduced

    摘要以重慶輕軌三號線江北機場站為例,介紹了城市復雜環境條件下淺埋隧、大基坑挖控制施工方法。
  5. ( 2 ) if the tunnel is constructed by blasting method, the shock vave from blasting endangers the safety and stabilization of existing tunnel structure

    ( 2 ) 、對于鄰近隧礦山法施工,產生的沖擊波會危及既有隧襯砌結構安全及穩定。
  6. In order to break through the traditional technology and the conception of equipment design, suggest to use bunchy phase deep hole or big diameter deep hole in laneway to realize the exploding of high step on opencast working ; digging with big contain forklift to realize the continuous transportation of dragline - mobile convolution crusher - belt transportation machine, therefore form a new technology system that be propitious to increase collectivity technique and economic benefit

    為突基於常規工藝和設備配套的設計理念,推薦採用束狀階段深孔或在巷中採用大直徑深孔的方法實現露天採的高臺階穿作業;採用大斗容索鏟下挖作業實現自工作面始的索斗鏟移動式旋迴碎機帶式輸送機的連續運輸工藝,從而形成有利於提高露天采設計總體技術經濟效果的新的工藝技術系統。
  7. The text message appeal was made using police direct, a system developed by the police information technology organisation after the july 7 london bombings to spread information rapidly

    據報,在該案獲中發揮重大作用的「文本式報文」電子信息平臺,是去年7月7日倫敦炸案發生以後設的,用於向簽約公眾快速發布緊急信息。
  8. Coulthard was convicted of burgling churches in 2003, and used lock picks and surgical scissors hidden in an empty camera case he used to disguise himself as a tourist. the text message appeal was made using police direct, a system developed by the police information technology organisation after the july 7 london bombings to spread information rapidly

    據報,在該案獲中發揮重大作用的「文本式報文」電子信息平臺,是去年7月7日倫敦炸案發生以後設的,用於向簽約公眾快速發布緊急信息。
  9. In the demolition designing, using different demolition parameters according to the different external conditions with adopting a series of comprehensive shock absorption steps, the influence of excavation demolition on the outside construction is decreased to the least degree

    設計中,根據點周圍不同的外部環境,採取了不同的參數,並採用了一系列綜合減震措施,對隧及基坑周圍建築物的影響降低到很小程度。
  10. Under the effect of instantaneous blasting shock wave, the reliability of lining is affected. the influence on existing tunnel relates to amount of dynamite, tunnel space, area of vvok face and rigidity of round rock

    沖擊波的瞬間作用下,既有隧襯砌安全性將受到影響,裝藥量、隧間距、挖面面積、圍巖軟硬程度都與沖擊對既有隧的影響有關。
  11. Smooth blasting techniques for excavation of the tunnel in guiyang project

    大石山隧光面挖技術
  12. Optimum design for construction management by limiting the period of survey, drilling, loading and exploding, ventilating and transporting is intensively studied and the applicability of boosting the speed of construction by well organization of space, manpower and machine is fully illustrated

    論文重點闡述了通過縮短測量劃線、鉆眼、裝藥、通風排煙、裝碴運輸作業時間,達到快速施工組織設計優化的目的,說明了採用鉆法施工充分利用隧空間,合理配備人力、機械,隧挖施工進度得到提高的可行性。
  13. This system installs below the bank savings counters, and when the armor - glass screen during suffering violence destruction, working personnel is according to moving the switch, can in one second many time the rapid bullet is case bulletproof together and the iron and steel guarded against blowing up shields

    該系統安裝在銀行儲蓄櫃臺下面,當防彈玻璃遭到暴力壞時,工作人員按動關,能在一秒多的時間內迅速彈起一防彈、防的鋼鐵屏障。
  14. Depend on the precise blast design with small error and strictly controlling the explosive consumption, they controll blasting construction for rock availably, complete the excavation for rock cuttings of broaden and rebuilding project for city roads successfully, and obtain well social benefit and economical benefit

    通過續密的微差設計,嚴格控制裝藥量,有效地控制了巖石施工,成功地完成了城市路拓寬工程的巖石路塹邊坡挖工程。
  15. No safety pillars shall be mined without authorization and no dangerous methods, such as water bursting, blasting and breaking through roadways, which may threaten the production safety of adjacent coal mines shall be adopted

    采礦作業不得擅自采保安煤柱,不得採用可能危及相鄰煤礦生產安全的決水、、貫通巷等危險方法。
  16. Construction of flat tunnel of large span at extra - shallow depth must be conducted on the principle that advance grouting should be strictly performed before excavation and length of pull at one time should be short, together with reinforced support, immediate closing and constant monitoring and surveying. that preceding pilot tunnels, large - volume excavation divided into small ones, excavation of flank before that of center, upper before lower, arch before wall etc is a good method which could effectively reduce surface subsidence and its adverse effect on adjacent buildings, in addition, some other measures are also taken to lessen blast - induced vibration in the ground and surrounding structures. in a word, all means and steps mentioned above have already proved effective and practicable in practice

    軟弱大跨超淺埋扁平隧必須按「管超前,嚴注漿,多分部、短挖、強支護、快封閉,勤量測」的施工原則進行施工,採用「眼鏡超前,化大為小,先側后中,先上後下,先拱后墻」的施工方法控制地表沉降和對周邊建築物的影響;採用「多分部,化大為小,短進尺,密布眼,弱裝藥,設減振槽」 ,控制振動,經過實踐證明,這些方法都是行之有效的。
  17. In this paper, based on upwards problems, the monitoring methods and monitoring systems of blast vibration are stated, and the wansongling tunnel blast engineering is taken as the subject investigated, the influence that the blast vibration by this tunnel digging act on the ground buildings and underground construction were monitored, and a great lot monitoring data were obtained, which established the practical base for this paper

    基於以上問題,本文簡述了振動的監測方法及監測系統,並以萬松嶺隧為研究對象,對其施工振動對地表建築及地下工程施工的影響進行了監測,獲得了大量的監測數據,為論文的研究奠定了實踐基礎。
  18. Controlled quarry blasting for dam - filling materials in spillway at gongbo gorge hydropower station

    公伯峽水電站溢洪壩料控制
  19. Study on dynamics effect caused by blasting construction by numerical simulation for tunnels with small spacing

    小間距隧挖動力效應數值模擬研究
  20. Numerical simulation of tunnel excavation by blasting under the influence of karst cavities

    溶洞對隧挖影響的數值模擬研究