爆鉆隧道 的英文怎麼說

中文拼音 [bàozhēnsuìdào]
爆鉆隧道 英文
drill-and-blast tunnel
  • : 動詞1. (猛然破裂或迸出) explode; burst 2. (放在滾油里快炒) quick-fry
  • : 鉆Ⅰ名詞1. (打眼用的工具) drill; auger 2. (指鉆石) diamond; jewel Ⅱ動詞(用尖物在另一物體上轉動) drill; bore
  • : Ⅰ名詞1. (隧道; 地道) tunnel; underground pass2. [書面語] (道路) road3. (郊外的地方) suburbsⅡ動詞[書面語] (旋轉) turn
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • 隧道 : tunnel; tunneling; tunnelling; chunnel; drive
  1. The controlling parameters for smooth blasting in qin - ling zhongnanshan tunnel project are optimized according to the fundamental principle of smooth blasting, considering the minimal resistance, coefficient of embrasure density, coefficient of non - coupling, density of dynamite and rate of exploding. the efficiency of this method has been analyzed and justified by the high speed and good quality of the project

    根據光面破的基本原理,從最小抵抗線、眼密集系數、不耦合系數、線裝藥密度、破進尺等幾個方面確定秦嶺終南山光面破主要參數的選取,分析了該設計在施工中的運用取得的成效,提高了施工進度,同時也保證了施工質量。
  2. Drill and blast method of tunnel excavation on hard rock

    硬巖地鐵法開挖結合盾構法襯砌的施工技術
  3. Comprehensive water control measures for river - crossing tunnel construction by drilling and blasting method

    法施工過江防治水綜合措施
  4. An overview of research on reasonable cover thickness for underwater tunnel by drill - blasting method

    水下法施工合理覆蓋層厚度的研究評述
  5. A new rapid procedure for drilling explosion construction is put forward and its application in qin - ling zhongnanshan highway tunnel project is discussed in this thesis

    論文結合秦嶺終南山公路的施工,進行了法快速施工技術的探討。
  6. Based on the project of the chenglingji tunnel acres the changjiang river, with adopting the drill - blasting method of constructing, the construction characteristics, construction principle, key construction technology and safety measures are introduced

    摘要結合城陵磯長江穿越工程的工程實例,介紹了在越江法施工中,越江工程的施工特點報和施工原則、關鍵施工技術以及安全措施。
  7. Optimum design for construction management by limiting the period of survey, drilling, loading and exploding, ventilating and transporting is intensively studied and the applicability of boosting the speed of construction by well organization of space, manpower and machine is fully illustrated

    論文重點闡述了通過縮短測量劃線、眼、裝藥破、通風排煙、裝碴運輸作業時間,達到快速施工組織設計優化的目的,說明了採用法施工充分利用空間,合理配備人力、機械,開挖施工進度得到提高的可行性。
  8. The application of natm tunnel method in zhongxian wuhan gas transmission pipeline crossing

    在忠武輸氣管穿越中的應用
  9. Water control measures for drilling and blasting construction of tunnel cutting through yangtze river

    法施工長江穿越的防水措施
  10. Technology comparison between tri - arm rock drilling jumbo and hand rock breaker used in drilling and blasting construction of luofeng tunnel

    蘿峰三臂鑿巖臺車與手持式鑿巖機法掘進施工技術比較
  11. Bases research of by bore - exploding way built tunnel, discover the tunnel lining thickness and tunnel lining inner figure accord with normal school

    根據研究發現在法修築的中,二次襯砌混凝土結構的襯砌厚度和內輪廓的統計規律符合正態分佈。
  12. Through the demolition construction design of huang guo shu, just cross the 4a scenic resort of our country, we explore the construction method to fit for sensitive environment and west carst region

    摘要通過對穿越國家4a級風景名勝區的黃果樹施工設計,探索在環境影響要求極高的地區及西部巖溶地區適宜的施工方法。
分享友人