牛尾田 的英文怎麼說

中文拼音 [niúwěitián]
牛尾田 英文
ushioda
  • : 名詞1. (哺乳動物) cattle; ox 2. (姓氏) a surname
  • : Ⅰ名詞1. (田地) field; farmland; cropland; land 2. (姓氏) a surname Ⅱ動詞[書面語] (打獵) hunt
  • 牛尾 : oxtail牛尾湯 oxtail soup
  1. San tin highway ( south bound ) near chainage 44. 30 ( ngau tam mei )

    公路(南行)鄰近路段44 . 30號(
  2. Six of them flow into tolo harbour : these are the shing mun river in sha tin, the lam tsuen and tai po rivers in tai po town centre, and tai po kau stream, shan liu stream and tung tze stream in the tai po rural area. another three flow into port shelter in sai kung : the ho chung river, sha kok mei stream and tai chung hau stream. the final one, tseng lan shue stream, flows into junk bay near tseung kwan o

    這些河溪全部注入香港東部海域的內灣,其中有六條流入吐露港:包括沙的城門河大埔市區的林村河及大埔河大埔郊區的大埔?溪山寮溪及洞梓溪,其餘有三條河溪則流入西貢海:包括蠔涌河沙角溪及大涌口溪,另外井欄樹溪是流入將軍澳灣的唯一河溪。
  3. Yuen long, kam tin, ngau tam mei and tin shui wai drainage improvements, stage 1, phase 2b - kam tin

    元朗錦及天水圍雨水排放系統改善計劃第1階段第2b期-錦
  4. Roads ( works, use and compensation ) ordinance ( chapter 370 ) ( notice under section 8 ( 2 ) ) - - pwp item no. 92cd yuen long, kam tin, ngau tam mei and tin shui wai drainage improvement, stage 1, phase 2b - - tam tin ( works package d ) road works ancillary to the proposed drainage improvement works in cheung po, ma on kong, yuen kong san tsuen and tin sam tsuen areas

    道路(工程、使用及補償)條例(第370章) (根據第8 ( 2 )條規定所發的公告) - -工務計劃項目第92cd號元朗、錦及天水圍雨水排放系統改善工程第1階段第2b期? ?錦(工程組合d )擬建的長莆、馬鞍崗、元崗新村及心村地區排水改善工程? ?附屬道路工程
  5. Roads works, use and compensation ordinance chapter 370 - notice under section 8 pwp item no. 92cd yuen long, kam tin, ngau tam mei and tin shui wai drainage improvement, stage 1, phase 2b - kam tin works package d road works ancillary to the proposed drainage improvement works in cheung po, ma on kong, yuen kong san tsuen and tin sam tsuen areas

    道路(工程、使用及補償)條例(第370章) - - (根據第8 ( 2 )條規定所發的公告)工務計劃項目第92cd號元朗、錦及天水圍雨水排放系統改善工程第1階段第2b期- -錦(工程組合d )擬建的長莆、馬鞍崗、元崗新村及心村地區排水改善工程- -附屬道路工程
  6. Roads ( works, use and compensation ) ordinance ( chapter 370 ) - - ( notice under section 8 ( 2 ) ) pwp item no. 92cd yuen long, kam tin, ngau tam mei and tin shui wai drainage improvement, stage 1, phase 2b - - kam tin ( works package d ) road works ancillary to the proposed drainage improvement works in cheung po, ma on kong, yuen kong san tsuen and tin sam tsuen areas

    道路(工程、使用及補償)條例(第370章) - - (根據第8 ( 2 )條規定所發的公告)工務計劃項目第92cd號元朗、錦及天水圍雨水排放系統改善工程第1階段第2b期- -錦(工程組合d )擬建的長莆、馬鞍崗、元崗新村及心村地區排水改善工程- -附屬道路工程
  7. Roads works, use and compensation ordinance chapter 370 notice under section 8 - pwp item no. 92cd yuen long, kam tin, ngau tam mei and tin shui wai drainage improvement, stage 1, phase 2b - tam tin works package d road works ancillary to the proposed drainage improvement works in cheung po, ma on kong, yuen kong san tsuen and tin sam tsuen areas

    道路(工程、使用及補償)條例(第370章) (根據第8 ( 2 )條規定所發的公告) - -工務計劃項目第92cd號元朗、錦及天水圍雨水排放系統改善工程第1階段第2b期? ?錦(工程組合d )擬建的長莆、馬鞍崗、元崗新村及心村地區排水改善工程? ?附屬道路工程
  8. Design work for another 24 kilometres of new river channels are under way, including the upper reaches of kam tin river, ngau tam mei drainage channel and san tin drainage channel

    另外,包括錦河上游、河道及新河道共約長24公里的新河道設計工作,也進行得如火如荼。
  9. The fairview park nullah was graded bad in 2005, mainly because its catchment area has been reduced after water from ngau tam mei began to be diverted into the kam tin river in 2002

    2005年,錦銹花園明渠的水質等級被評為惡劣,主要是因為2002年的河水改道至錦河引致流量減低。
  10. Today, kwun tong line is 15. 8 km long between the 2 terminal stations at yau ma tei and tiu keng leng with 13 intermediate stations ; namely mong kok, prince edward, shek kip mei, kowloon tong, lok fu, wong tai sin, diamond hill, choi hung, kowloon bay, ngau tau kok, kwun tong, lam tin and yau tong

    目前,觀塘線由油麻地終點站至調景嶺終點站長15 . 8公里,共有13個中途站,分別為旺角太子石峽九塘樂富黃大仙鉆石山彩虹九灣頭角觀塘藍和油塘。
  11. The main drainage channels at ngau tam mei and the upper reaches of the kam tin river near kam tin san tsuen have been substantially completed and the flood risk around the areas has been relieved

    和錦河上游近錦新村的主要排水渠工程已大致完成,該區的水浸風險已大大減低。
  12. Village flood protection for yuen long, kam tin and ngau tam mei, north west new territories - stage 2

    新界西北部元朗錦的鄉村防洪工程第ii階段
  13. Upgrading works for the secondary channels and the urban drainage improvement works are scheduled to commence at end 2001

    及錦的排水渠上游部份改善工程仍在進行中。
  14. Nol would connect west rail at kam sheung road to the new lok ma chau boundary crossing and kwu tung station, both to be completed under the spur line project, through au tau, ngau tam mei and san tin

    北環線將會由西鐵錦上路站經凹頭及新,連接新落馬洲過境通道及古洞車站,這兩個項目將于落馬洲支線項目下完成。
分享友人