物料計劃 的英文怎麼說

中文拼音 [liàohuà]
物料計劃 英文
material planning
  • : 名詞1 (東西) thing; matter; object 2 (指自己以外的人或與己相對的環境) other people; the outsi...
  • : 名詞1 (材料; 原料) material; stuff 2 (喂牲口用的穀物) feed; fodder 3 (料器) glassware 4 (...
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • : 劃動詞1 (撥水前進) paddle; row 2 (合算) be to one s profit; pay 3 (用尖銳的東西在別的東西上...
  • 物料 : item,material,part
  • 計劃 : 1 (工作、行動以前預先擬定的內容和步驟) plan; project; programme; device; devisal; design 2 (做...
  1. A head chef must be an expert not only in cooking itself, but also in planning, purchasing, and supervising other kitchen personnel.

    一個廚師長不僅應該是烹飪專家,而且在制定,采購和監督其他炊事員工作方面也應該是行家。
  2. Secondly, the paper brings out problems which are need to be solved as emphases by analyzing objectively the plant ' s cost control actuality, the existing problems and its reasons. the analysis indicates that because of high dependence on planned economy, exterior factors seriously restricting the reasonable price of fuel, the electrovalence being made by exterior, the deficiency of its interior mechanism and the big random of cost control, the enthusiasm that the plant manages and controls cost independently is badly hurt. thirdly, aiming at these leading problems, applying the present cost control theory and the main cost control methods of electricity enterprises both home and abroad, the paper designs and evaluates its cost control project at these aspects of productive technology, management, logistic control, financial management and the manpower cost, and lodges corresponding cost control project of every tache

    論文首先對當今國內外成本控制理論研究現狀和應用現狀進行了分析,包括成本性態分析、成本控制內容分析及成本控製程序與方法的分析,為論文研究打好了理論基礎;其次客觀全面地分析了永昌電廠成本控制的現狀和存在問題及其產生原因,其中包括經濟色彩濃厚、外部因素嚴重製約燃成本的合理配比、電價確定權在外,它嚴重挫傷企業成本管理與控制的自主積極性,也包括企業內部機制不全、成本控制的隨意性大等問題,這為本論文提出了需要重點解決的問題;然後針對永昌電廠在成本控制方面存在的主要問題,應用當今國內外成本控制的主要理論和發電企業成本控制主要方法,從生產技術、生產管理、流控制、資金管理及人工成本等方面對永昌電廠成本控制方案進行了相對全面的設和評價,提出相關環節的成本控制方案。
  3. Monitor and direct material planner on jit material pulling

    監控和指導物料計劃員實施jit拉動。
  4. Arrange production schedule and material plan. distribute the production capacity and material

    生產安排,物料計劃,生產能力與分配。
  5. Be responsible for all purchasing activities related to material planning and ordering, order confirmation following up, on time delivery scheduling / statistics, quality and quantity issue coordination, payment following up, lead the annual performance of suppliers, review new supplier ' s evaluation and purchasing system data maintenance, smooth purchasing job, so to fulfill production requirements

    負責所有采購相關事務,包括物料計劃及訂購,訂單確認跟蹤,按時交貨及統,供應商交貨之品質及數量異常問題協調,付款跟蹤,主導對供應商進行年度評估,參與新供應商評估以及采購系統數據的維護,確保采購作業順利進行,滿足生產需求
  6. Bachelor degree or above in mechanical engineering or business management or equivalent. above 3 year purchasing experience or sourcing experience in mechanical industry

    大學本科以上機械製造或管理相關專業畢業, 3年以上機械產品製造行業采購經驗,熟悉物料計劃,供應商管理過程。
  7. There must be a strict management and accounting system and also a definite material accounting area

    五有嚴密之管理及帳制度,並算區。
  8. In the paper, the methods how to manage the raw material fields is devoted. accord to the wuhan iron and steel ( group ) co. industrial port " s level, with operation research, physical distribution, computer technology how to deal with transport, loading or unloading stockpiling advance an idea. in the paper, the raw material fields " physical distribution system is departed to three part : optimum burden, the best line, loading and unloading advance, step by range and step by level, its can be implement so as to improve the product ' s competition ability

    本課題的研究內容主要是原場混勻配及作業線系統優化,它包括配的選擇及作業線選擇、場的貨位及貯量的合理配置等幾項的綜合優化,是一個比較大的流系統的規。主要以武鋼工業港原場為例證展開研究的。配的優化是以可以降低成本並保證成份控制為目標進行線性規的。
  9. Lead, manage, and direct all mp & l operators ( plant site ) to meet mp & l objectives, including analysis customer ' s requirement, material planning, and production schedule, packaging design, shipping management, receiving and dispatching goods, physical control of stock, inventory control, outside warehousing management, transportation management

    領導,管理並指導公司流庫管理員工作,達到流管理的要求,包括分析客戶需求,制定物料計劃,制定生產排程,包裝設,發貨管理,運輸管理,收發貨,庫存控制,外庫管理,實保管的目標。
  10. According to company procedure, managing long term po, training and monitor material planner for material pulling, controlling raw material inventory

    為確保生產過程正常運行,根據公司文件,管理公司長周期訂單,培訓和監控物料計劃員實施拉動,控制原材庫存。
  11. " those two countries, if they pursue their biofuel plans as they are on the table now, they will definitely be in the red zone in water terms, " she said

    "這兩個國家,如果他們像現在中那樣追求自己的生,他們無疑會在水的問題上進入一個紅色危險區域, "她說
  12. Setting and maintain qad and pmp parameter on material plan

    設置和維護qad和pmp系統物料計劃參數。
  13. Mncs ' working experience in materials planning and inventory control

    具有大型跨國公司物料計劃及庫存管理相關工作經驗。
  14. Manage stamping production, inspect, warehouse, material plan, and other relevant activity about production

    統管沖壓生產,生產線上檢驗,倉庫和物料計劃,與生產相關的活動。
  15. In the discussion of the material management improving projects and control, this thesis mainly had the detailed discussion on the material management control emphasis, the amelioration of supplier management, cost checking project, material stocking control, material planning management, material spot management. furthermore, it deepened into the enterprise inner control, material quality and cost

    管理改進方案與控制策略的論述中主要從管理控制的重點、供應商管理改進、成本核算方案改進、采購控制改進、物料計劃管理改進、現場管理改進等方面進行了詳細論述,並對管理問題的研究深入到企業的內部控制、質量、成本等各主要方面。
  16. To provide the material plan in timely and accurate, provide the reasonable wo. to production department

    職位職責: 1 .根據相關信息,及時準確提供物料計劃;向生產部提供合理提供工單。
  17. Proactively support the new product introductions, ensuring all material is procured on time to meet the training, pre - production and launch needs

    支持新產品轉移,保證物料計劃滿足產品更新換代的需要。
  18. Associate degree or above in related technical discipline. 2 years working experience in logistics / warehousing / import & export / planing

    理工科大專以上學歷, 2年以上流、倉儲、進出口、物料計劃等工作經驗。
  19. Associate degree or above in related technical discipline. 2 years working experience in logistics / warehousing / import & export / planning

    理工科大專以上學歷, 2年以上流、倉儲、進出口、物料計劃等工作經驗。
  20. Associate degree or above in related technical discipline is preferred. 2 years working experience in logistics / warehousing / import & export / planing is a plus

    理工科大專以上學歷優先, 2年以上流、倉儲、進出口、物料計劃等工作經驗優先。
分享友人