現場作業 的英文怎麼說

中文拼音 [xiànchǎngzuò]
現場作業 英文
field operation
  • : Ⅰ名詞1 (現在; 此刻) present; now; current; existing 2 (現款) cash; ready money Ⅱ副詞(臨時; ...
  • : 場Ⅰ名詞1 (平坦的空地 多用來翻曬糧食 碾軋穀物) a level open space; threshing ground 2 [方言] (...
  • : Ⅰ名詞1 (行業) line of business; trade; industry 2 (職業) occupation; profession; employment; ...
  • 現場 : 1. (出事地點) scene 2. (工作地點) site; spot; on-site; work field
  1. The structure and the construction method of a new type of fascine are introduced herein, of which the advantages are as the follows. ( 1 ) the shortages of the complicated construction process and low construction progress with low efficiency are overcome. ( 2 ) the fascine cage can be industrially made, so as to reduce the working procedure in site. ( 3 ) the heavy construction equipments can be used for the mechanical construction of the single large size fascine cage with high construction speed and intensity. ( 4 ) it is favorable to the environment protection as the amount of the fascine material being decreased

    摘要介紹了新型埽工籠埽的結構形式、施工方法,其優點為: ( 1 )克服傳統埽工施工工序復雜、速度慢、效率低的缺點; ( 2 )籠埽可工廠化生產,減少現場作業工序和面后移; ( 3 )充分利用大型施工機械進行大體積單個籠埽結合機械化施工,埽速度快、強度高; ( 4 )減少柳料用量,利於環境保護。
  2. Following notebook computer being used broadly in field detectiong, peripheral which have usb interface are prepotent more and more. the ultrasonc flaw detector we ' re designing will be connect with notebook computer in field detection, so we elect usb interface to accomplish transmission between detector and pc. the article not only introduces basic knowledge about usb briefly and gives detailed develop process of usb peripheral and flow diagrams of usb controller, but also operating against our device ' s functions, gives develop process of device driver and important api function being used. in addition, an exclusive interface being used to control and display is designed

    我們所設計的探傷儀外置盒在現場作業時是與筆記本電腦相連接的,因此選用usb介面來實數據在探傷儀外置盒與pc機間的傳輸。這里簡單的介紹了有關usb介面的基礎知識,給出了探傷儀usb介面的詳細開發過程及usb控制器的程序流程圖,並且針對于本儀器要實的功能,給出了pc機端的設備驅動程序開發過程及關鍵的api函數調用程序。此外這里還設計了一個專用的控制及顯示界面。
  3. Secondly, paper introduces the composition structure and the manufacture craft characteristic of airplanes, describes the structure and the main assembly process and the assembly characteristic of the n # fuel tank section, points out the assembly accuracy control of the n # fuel tank section. thirdly, paper analyses in detail problems which exist in the current riveted assembly of the n # fuel tank section, proposes the improve measures against the existent problems. finally, paper forecasts in theory the positive effect that the new plan will bring, introduces the practical result after approval test, analyses the differences of both

    具體做了以下幾方面工:第一,詳細闡述了工研究的基本原理;第二,介紹了飛機的組成結構、飛機製造工藝的特點、 n #油箱段的主要結構、 n #油箱段的主要裝配過程、 n #油箱段的裝配特點和n #油箱段的裝配準確度的控制方法;第三,具體分析了n #油箱段鉚接裝配生產線中存在的問題,針對存在的問題,提出了具體的改進建議,並形成了新的改進方案;第四,從理論上預測了新方案將會帶來的積極效果,介紹了新方案在試驗驗證的實際結果,並對兩者之間存在的差異進行了對比分析與研究。
  4. The analysis of the main reasons that the department of the transportation, the locomotive, the circuit, the electricity and the carriage cause the accidents of delaying the train, put forward to the prevention measures. 6. with the safety turbulence situation of chengdu railroad branch, analyzing the safety managements in team management, the staff and workers labor discipline, the on - the - spot control, the staff and workers duty, the equipment quality and the construction safety, the deeply analyzing existing troubles of safety management institution, working out the counter measures of chengdu railroad branch to improve the safety managements and realize the controlling situation

    分析鐵路運輸、西南交通大學工程碩士研究生學位論文第頁機務、工務、電務、車輛等部門造成延誤列車事故的主要原因,提出預防措施; 6 、針對成都分局安全生產形勢動蕩不穩,分析成都分局安全生產中班組管理、職工「兩違」 、現場作業卡控、職工崗位責任制、行車設備質量以及施工安全方面的狀,深刻剖析安全管理機制方面存在的問題,就實成都分局安全生產有序可控進行對策研究。
  5. All contractors ' equipment when first arriving at the site must be inspected by the construction manager or his nominee and carry current state certification if required

    所有承包商設備首次抵達時,必須通過施工經理或其指定人的檢查。並且,如果需要還需要檢查承包商所有的證書。
  6. This paper summarized the present situations of application and study of computers in the aspects of felling - area management and planning, forest - road net arid wood transporation, timber yard operation, and forest lumbering auxiliary management and decision - making, etc., it dealt with the developmental tendency of computer application to forest lumbering engineering in view of the appeared new technology in the computer application to forest lumbering engineering, and it raised the views on the existing problems of computer application to forest lumbering engineering and views on their countermeasures

    摘要歸納總結了計算機在伐區經營與規劃、林道網與木材運輸、貯木、森林采運輔助管理與決策等方面應用研究的狀,針對森林采運工程計算機應用出的新技術,論述了森林采運工程計算機應用研究的發展趨勢,並對我國森林采運工程計算機應用存在的問題與對策提出了看法。
  7. Establish lifting operation management procedure, implement technical standard and equipment operating / repair procedure of lifting operation and management, ensure lifting management and field work be in control

    建立起重管理技術檔案,執行賽科技術標準及設備檢修規程,確保起重管理及現場作業處于受控狀態。
  8. Live working. required insulation level and related air distances. calculation method

    現場作業.額定絕緣水準和相關空中距離.計算方法
  9. Why can t a production worker set up his own machine

    為何現場作業員不能設定自己的機器?
  10. Provide on - job - training for new operators, technicians and field

    對新的員、技術員和現場作業員進行在崗培訓。
  11. Provide on - job - training for new operators , technicians and field

    對新的員、技術員和現場作業員進行在崗培訓。
  12. Workers become experts

    現場作業員成為專家。
  13. Back up operators in technics and resources and help them to improve

    從技術上和資源供給方面支持人員,並幫助提高現場作業人員的能力。
  14. Workmanship on building sites - code of practice for concrete work - sitework with in situ and precast concrete

    建築工地操工藝.混凝土實用規程.現場作業和預制混凝土
  15. One union said it was on fear ( unfair ) to other workers that telecommuters did not have to travel to the office

    其中一個工會組織稱與遠程辦公者相比,對那些到辦公現場作業的員工來說就很不公平。
  16. Noticed the characteristics of the operation system, the indexes about investment, funding, marketing, profit are not included in the appraisal index system

    根據現場作業的特點,本文舍棄了有關投資、融資、營銷、利潤核算的指標。
  17. Based on and conserve experience, the repair rules and methods are given for speed - lift switch being used, which may build the strengthen project, stabilities the technically predicament, and prolong the repair period

    根據現場作業特點和養護經驗,確定了提速道岔上道使用后的維修原則和辦法。
  18. Through training and information availability, the person doing the job knows enough that he needs minimal supervision. a team of workers is given access to information about incoming orders. members then create their own production schedule

    透過訓練和可利用的資訊,現場作業人員充分知道其需要即少的監督,工小組依據所得到的指令來取得資訊,成員則設計自己的生產排程。
  19. Popularization application of dmm can decrease engineering building cycle, warrant construct and ornamental engineering quality, prompt technology progress of building construction, and alleviate labor fatigue of workers at present, cut down raw material loss, promote construction environment and reinforce environmental protection, which is truly environmental protection building material

    干拌砂漿推廣應用有利於縮短工程建設周期,保證砌築工程及裝修工程質量,促進建築施工的技術進步,減輕現場作業工人的勞動強度,減少原材料浪費,改善施工環境及促進全球環境保護,是一種真正的「綠色環保建材」 。
  20. Some new performance appraisal methods are used in china and other countries, but most of them aim at the whole enterprise " performance. the problem how to evaluate the performance of operation system and bring it into the management system of enterprise are still remained in suspense

    近年來國內外出了一些新的績效評價方法,但多是針對企整體績效的評價而進行的,而如何評價現場作業系統的績效,如何把現場作業系統的績效評價與管理納入企管理這個大系統,還是一個懸而未解的課題。
分享友人