現場勘探工程 的英文怎麼說

中文拼音 [xiànchǎngkāntàngōngchéng]
現場勘探工程 英文
ground investigation field work
  • : Ⅰ名詞1 (現在; 此刻) present; now; current; existing 2 (現款) cash; ready money Ⅱ副詞(臨時; ...
  • : 場Ⅰ名詞1 (平坦的空地 多用來翻曬糧食 碾軋穀物) a level open space; threshing ground 2 [方言] (...
  • : Ⅰ動詞1 (試圖發現) try to find out; explore; sound 2 (看望) call on; visit; see 3 (向前伸出)...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 現場 : 1. (出事地點) scene 2. (工作地點) site; spot; on-site; work field
  1. The author mainly discussed the importance and some special notes in the proof - text of groundwork with other confreres, enhanced the owners and interelated departments ' recognition of the proof - text of groundwork, through a case study in shenyang city of liaoning province in northeast china

    摘要針對目前察市地基驗槽作存在的問題與不是,利用相關的技術規范並結合部分實例,討分析地基驗槽作的重點及地質異常的處理方法,歸納總結地基驗槽作出問題的原因,重申地基驗槽作的重要性,用以加強業主及相關部門對地基驗槽作的重視。
  2. Contractors on the list of approved suppliers of materials and specialist contractors for public works ground investigation field work group ii are invited to tender

    邀請名列公共認可材料供應商及專門承造商名冊上獲準承投的第ii組承造商承投這次招標項目。
  3. Contractors on the list of approved suppliers of materials and specialist contractors for public works under the category of ground investigation field work group ii are invited to tender

    邀請名列認可公共物料供應商及專門承建商名冊上獲準承投的第ii組承建商承投這次招標項目。
  4. According to the geological data which was gained by exploration investigation, establishing a geological model which can reflect rock mass characteristics ; with analyzing the internal and exterior factors synthetically, the deformation and possible failure mechanism and mode of the cut slopes was confirmed which combines with stereoic projection and other techniques ; the stabilities of the 14 high slopes are estimated synthetically by applicable design codes and guidelines. with the estimate result and some other analysis methods, the rock mass mechanical parameters of slope are identified ; as a results, 14 high slopes fall into 4 categories based on rockmass characteristics and discontinuities. the stability and deformation of some typical slopes was analyzed with distinct element method by udec ; the safety factor of some dangerous slopes are calculated by rigid limiting equilibrium method for comparison

    首先著重研究影響邊坡穩定性的內在因素,主要是通過地質、測量、觀測等手段取得研究區地質體的基礎地質資料,建立起能夠反映地質體結構特徵的地質模型;隨后綜合分析潛在的內外部影響因素,並結合赤平投影對邊坡可能的失穩模式或破壞機製作出判斷;運用已有巖體質量分類方法對沿線14個高陡邊坡穩定性進行初步的評價,並結合試驗研究、經驗判斷、類比等手段確定了坡體的巖體力學參數;根據穩定性初步評價結果將研究區14個高陡邊坡按開挖方式分為4大類,並利用離散元序udec對各類典型高陡邊坡進行了穩定性計算分析;對潛在危險邊坡利用剛體極限平衡法求出了不同況下的安全系數。
  5. Firstly, seismic exploring databases are the base of the management, so a detail description is provided which some databases achieved in the past ninth five - year plan must be imported and surface layer database are built newly instead of traditional mode of recording and storing the data. secondly, according to the idea of gis ( geographic information system ), some query and display techniques are discussed, for example, the technique of visualizing user interface, the technique of controlling the order of a map, and the technique of searching for the database based on a seismic line

    從技術發展的角度看,盡管通過技術革新和技術改造,地震野外採集採取了許多技術措施,例如,新的施藝,高性能的採集儀器,處理控制等,但目前的野外生產管理仍有沿用幾十年來傳統的管理方式的象,採用傳統的文檔、圖紙,手錄入這種管理方式,主觀性、隨意性較強,信息化度低,管理水平不高,大量的時間被浪費在數據、資料的管理和查找上,由於沒有較好的技術手段,缺乏科學性。
  6. Based on abroad consultations and studies on national and foreign related datum, mainly taking shenzhen luohu fracture zone for research object, and by means of analysis on locale monitoring datum analysis, laboratory routine rheopectic testing, finite element numerical simulation and appraisal of gis stability, a few of conclusions can be summarized as the following : ( 1 ) analyzing present and past geological reconnaissance datum and reports of stability appraisal in luohu jiancheng district and synthesizing a mass of crustal stress monitoring datum and huangbeiling faultage f8 monitoring datum, and combining closely with practical engineering activity in luohu district, characteristics of crustal stress distribution is deeply discussed, which has an important guiding meaning for studying region stability and underground structure safety in luohu district

    本文在廣泛查閱、研究國內外有關資料的基礎上,主要以深圳羅湖破碎帶為研究對象,通過實際監測資料分析、室內常規流變試驗、有限元數值模擬以及基於gis的穩定性評價,可以得到以下幾點結論: ( 1 )分析了羅湖建成區以前和今的地質察資料、穩定性評價報告,綜合大量的今地應力監測資料和黃貝嶺f8斷層監測資料,緊密結合羅湖建成區的實際活動,深入討了羅湖區的地應力分佈特徵,這對于研究羅湖地區區域穩定性和地下建築物的安全性具有重要的指導意義。
  7. Which often produces some unexpected problems, such as prolonging time limit of project, increasing engineering quantities and cost, etc. through test on the site, dynamic value analysis, finite element unit method, the paper researchs construction technology of in - situ pile, transfer theory, thickness of supporting layer of head slab and depth of pile in karst area, provides some important conclusions, directs effectively the design and construction of this kind of projects

    但因溶洞的分佈規律性差,手段難於事先查明它的準確位置及大小,因而常常給施帶來意想不到的問題:期延長、量增加及費用增加等。本文通過試驗、理論計算和有限單元分析,對巖溶地區鉆孔灌注樁的施藝、荷載傳遞機理、持力層頂板厚度及嵌巖深度等方面進行了較為系統的研究,得出了一些重要結論,有效地指導了該類的設計和施
  8. First, we research 3d data sets that formed during petroleum exploration and exploitation & direct volume rendering technique in 3d data sets visualization technique, and apply direct volume rendering technique to this field to achieve a better effect. it reappears oil distributions and parameter dynamic change intuitively and truly in course of petroleum exploration and exploitation, and assistant the working personnel of the certain field to analyze and design, having wide application foreground

    先研究了石油開發過中形成的三維數據以及三維數據可視化技術中的直接體繪制技術,把直接體繪制技術應用到該領域中達到了較好的效果,直觀、準確地再了油藏分佈以及石油開發過中的參數的動態變化,輔助相關領域作人員的分析、設計,具有廣泛應用前景。
分享友人