現場電纜 的英文怎麼說

中文拼音 [xiànchǎngdiàn]
現場電纜 英文
on-site cable
  • : Ⅰ名詞1 (現在; 此刻) present; now; current; existing 2 (現款) cash; ready money Ⅱ副詞(臨時; ...
  • : 場Ⅰ名詞1 (平坦的空地 多用來翻曬糧食 碾軋穀物) a level open space; threshing ground 2 [方言] (...
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : Ⅰ名1. (拴船用的鐵索或多股粗繩) cable; hawser; mooring rope 2. (擰成多股的似纜物) thick rope; cable Ⅱ動詞(用繩索拴船) cable
  • 現場 : 1. (出事地點) scene 2. (工作地點) site; spot; on-site; work field
  • 電纜 : cable; electric cable
  1. The composite material can be used in the in - situ fast insulation enwrapping of broken wire and cable as well as the in - situ fast repair of conveyor belt in mine

    該復合材料可用於煤礦井下安全快速包覆、運輸帶的安全快速修復。
  2. Pull all wires necessary for field connections, remote alarm functions, ac power and all other optional features

    拉出所有用於連接、遠程警報功能、交流源和所有其它選擇功能所必需連接的
  3. This article in detail elaborates supply power and breakdown type and the test methed, how to scientifically grasp the different breakdown electric cable meter test profile analysis as well as the breakdown localization method, and introduces how to solve the problems appeared in the scene test

    摘要介紹了供用企業中的各種故障類型和故障測試方法,對不同故障儀測試的波形進行了分析,闡述了故障點的定位和測試中通過波形判斷故障的方法。
  4. 2 if users require, the knowledge that our company trains relevant cables to lay, using, maintaining for users free, etc., get to instruct users how to construct correctly live

    2如果用戶要求,我公司免費為用戶培訓有關敷設使用維護等知識,到指導用戶正確施工。
  5. First, executing insulation and conductivity test for loop cable. then, pulsing simulation signal at place of local transmitter and output switch

    首先要對迴路進行絕緣和導通試驗, 2 )然後在變送器、發訊開關處加模擬工藝信號。
  6. Qualifying class 1e electric cables and field splices for nuclear power generating stations

    站用1e級質量鑒定和拼接
  7. Standard for qualifying class 1e electric cables and field splices for nuclear power generating stations

    站1e級質量鑒定和拼接標準
  8. The problem about neutral - point - grounding mode is an all - around technical problem which associated with not only power system reliability , insulation coordination , electromagnetic interference , but assault safety 。 in china , the neutral grounding modes of the 10kv net involved of none grounding, grounding by arc suppressing coils, resistance grounding or reactance grounding in the past 。 with the development of civic power network , low resistance grounding mode was used to restrain the over voltage, particularly in guangzhou, shanghai , beijing , and zhuhai etc. it was reported that the over - voltage level of low resistance grounding mode is lower than that of arc suppressing coil mode, but the operation carried out the other way 。 at substations in guangzhou and shanghai it was found that the low resistance grounding mode is successful 。 but in some areas , such as zhuhai , substations grounding with low resistance revealed some problems , including power supply reliability rapidly dropping , transmitting line often tripping ; and person safety being threatened 。 so interiorly the grounding mode selection of the 10kv network was disputed, which mainly focused on the fault form of 10kv net grounding, the apply area of suppressing arcing coil grounding mode, power supply reliability level of the two modes, person safety, communication interfere and the workload of maintenance

    爭議點主要是在10kv網接地故障的形式、消弧線圈接地的應用范圍、兩種運行方式供可靠性的高低、人身安全、通訊干擾和運行維護工作量等諸多方面。 11 17本論文就是針對以為主的城區10kv網中性點接地方式的選擇問題進行研究。論文首先對10kv網的中性點運行各種方式進行分析,比較各方式的特點,然後以重慶儲奇門變站10kv網的實際參數來建立數值計算模型,在考慮了網接地流變化、中性點阻取值大小、接地點接地阻值變化等多種影響因素的情況下,對中性點經消弧線圈接地和經小阻接地方式下網的過壓水平和接地點短路流大小進行了數值計算,其計算結果與科院所作試驗進行了比較。
  9. Railway fixed equipment and rolling stock. safety cablework and connection. part 3 : making in factory - quality supervising in factory and on place. setting up in position. maintenability criterion. guide

    鐵路固定設備和機車車輛.安全敷設和連接.第3部分:工廠製作.工廠和質量監測.位置設定.可維修性標準.導則
  10. The field ac voltage withstand test on 110kv power cables

    交聯交流耐壓試驗
  11. On - site ac voltage withstand test of high voltage xlpe power cable

    高壓交聯交流耐壓試驗
  12. Practice for field testing electric submersible pump cable

    潛水試驗規范
  13. Trend of on site high voltage testingfor xlpe power cables

    交聯聚乙烯高壓試驗動向
  14. Issues about the space conflict between excavated area and chimney site office and 11kv cable are under coordination

    關于開挖區域與煙囪辦公室相碰及業主移位問題正在協調中。
  15. Compressor panel testing mainly includes acculator axle temperature monitor, plc group. after connection of local cable and testing of detector charactertistic contour, testing vibration and site ? change monitor

    對其中的壓縮機盤主要是調速器、軸瓦溫度監視器、機組plc調試。至於振動、位移監視器調試,需待現場電纜連接後作探頭特性曲線測試后進行。
  16. In a batch of cables that are offered to the electric power system of guangxi, and mostly service conditions under 0 degrees centigrade in winter for the mountain area according to using the scene in 2001, our company technical staff is it suit serious ice formation, heavy tombarthite steel core aluminium that crosses over entangle in the line to design, pass the provincial - level appraisal

    年在為廣西供系統提供的一批中,根據使用為山區且冬季多為0以下使用條件,我公司技術人員設計適合重冰區大跨越的稀土鋼芯鋁絞線,並通過省級鑒定。
  17. This paper introduce, now in electrical system, the high - voltage tests include part - charge test for transformer, ac withstand voltage test for transformer, ac withstand voltage test for switch, ac withstand voltage test for hv cable, when the tests is on, the power sup - - ply will be too poor

    文中就當前力系統中的一些高壓測試所面臨的試驗源問題,這些試驗包括變壓器的局部放和交流耐壓試驗、高壓開關、高壓交聯、 gis等的交流耐壓試驗,提出採用新型變頻源對高壓設備進行測試。
  18. Our factory is located in the bank of hangzhou fuchun jiang river, the transportation is very convenient. our factory is established in 1991, we specialize in manufacturing the electrical equipments. now, we play a leading role in the same line. every year, we invest much money technical resarch. the major products of our factory is high speed braiding machine, rewinding machine and extruder for cables and wires. in china, more than 1000 factories use our product and every year our products are exported to overseas market. we hope we will create bright future together with our customers

    公司描述:我公司坐落在美麗的杭州富春江畔,交通十分方便.我廠建於1991年,專業生產專用設備.經過短短幾年發展.目前已經成為國內同行的領頭羊.我公司專業生產高速編織機,並絲機,擠出設備.每天我廠都投入大量資金進行技術革新,在已經形成5大系列30幾個品種,全國有一千多家工廠使用我司的設備.並有很多產品進入了國際市.本廠希望與各位客戶共創輝煌
  19. This article mainly discusses such problems as the content of construction statement for temporary power supply on construction site, structure and power supply system, method of calculating capacity and load of power system, selection of cable and wires, together with basic requirement for security measures of temporary power supply

    摘要闡述了建築工程施工臨時用組織設計編制的內容,供配系統的結構和設置、基本保護系統,系統中容量和負荷計算方法、選擇,以及臨時用氣防護措施的基本要求。
  20. Change of on - site withstand voltage electric test of xlpe power cable

    交聯聚乙烯氣耐壓試驗的轉變
分享友人