現場驗收 的英文怎麼說

中文拼音 [xiànchǎngyànshōu]
現場驗收 英文
site acceptance test
  • : Ⅰ名詞1 (現在; 此刻) present; now; current; existing 2 (現款) cash; ready money Ⅱ副詞(臨時; ...
  • : 場Ⅰ名詞1 (平坦的空地 多用來翻曬糧食 碾軋穀物) a level open space; threshing ground 2 [方言] (...
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • : Ⅰ動詞1 (把攤開的或分散的事物聚集、合攏) put away; take in 2 (收取) collect 3 (收割) harvest...
  • 現場 : 1. (出事地點) scene 2. (工作地點) site; spot; on-site; work field
  • 驗收 : check and accept; check before acceptance; check upon delivery; acceptance check; control reception
  1. Small power hydraulic turbines. field acceptance test

    小功率液壓渦輪機.現場驗收
  2. We analyse the dispersion of stock returns and have the tests of serial correlation. the results show that the trading mechanism has a significant effect on a number of characteristics of stock returns. first, the distribution of open - to - open returns has greater variance than that of close - to - close returns. second. the serial correlation pattern is quite different in the two return series. the open - to - open returns have negative autocorrelation coefficient, but the close - to - close returns is positive. further, employing an arma ( 1, 1 ) model we find that in the opening. returns exhibit higher residual noise and stronger dependence on past returns, reflecting stronger deviations from the random - walk form of the market efficiency hypothesis

    主要表為:一,開盤益序列比益序列具有更大的方差。二,兩種益序列的序列相關形式不同,開盤益序列表為負相關,而益序列表為正相關。而且我們通過arma ( 1 , 1 )模型的進一步檢,發開盤益序列比益序列具有更大的殘差,更依賴于過去的益序列,也更偏離於市有效的隨機遊走形式的假設。
  3. In order to guarantee our client ' s first sample to be accepted, our engineers often visit the client ' s plant before we start to make the pattern

    為了使客戶的樣件一次合格,我們的工程師經常在模具製造前訪問客戶的工廠,考察客戶的鑄造生產和設備的特徵,以便向客戶提供有針對性的方案和建議。
  4. A complete solution provided by schneider electric on this project, schneider electric provided the low voltage switchboard, alarm monitoring system, control consoles, emergency engine telegraphy system, general alarm system and fire alarm system and some auxiliaries as a complete package including the design, manufacturing, engineering, factory accept test ( fat ), site commissioning and sea trial

    在該項目中,施耐德電氣公司提供了低壓配電板、報警監測系統、監控臺和駕控臺、應急車鐘、通用報警系統和火警系統,以及其它一些輔助設備等的完整總包,它包括了設計、製造、工程、工廠調試和海上試航。
  5. This paper mainly research how to take full advantage of various quality tools, including work - site management 5s, traditional seven quality tools, process capacity analysis, poor quality cost analysis and more complicated statistics factorial experiment and variance analysis, to lower products cost and improve revenue through process deviation reduction, process cycle time reduction or process output improvement

    該論文主要研究如何運用各種質量持續改進工具:管理5s法、傳統的七種質量工具、過程工序能力分析、質量成本分析法以及較復雜的統計學知識因素試和方差分析持續降低過程偏差,減少過程周期時間或增加過程產出,從而降低產品成本,增加入。
  6. This paper presents a study and analysis of project management organization ' s set up, progress control, quality control, safety control, capital control, bidding management and construction spot management, risk management etc. and on the basis of the study and analysis, a set of strategic plan about project management appropriate for beijing huamao center is worked out

    本文從投資方工程項目管理的角度對北京華貿中心工程項目建設管理模式、組織機構的設立、工程工期控制、質量控制、安全控制、投資控制、工程招投標管理、合同管理、信息管理、施工管理、竣工及項目后評價管理、風險管理等方面作了較深入的研究、分析,制定出一整套適合本工程項目特點及市定位的工程項目的建設管理策劃方案。
  7. Code for construction and acceptance of field equipment, industrial pipe welding engineering

    設備.工業管道焊接工程施工及規范
  8. Code for construction and acceptance of welding works of on - site equipment and industrial pipeline

    設備工業管道焊接工程施工及規范
  9. Contractor assigns to be principal of client on the project, who must guarantee there is at least one principal who is on worksite to direct construction until completion approved during the project construction

    承包人指定為本工程承包人的負責人,在本工程施工期間,承包人必須保證至少有一個負責人在指揮施工直至完畢。
  10. While the lectures gave a detailed description of forage production and decision - making with farm production economics, demonstrations on the farm and at the research stations focused on practical skills in forage production, including tours of forage variety farm for farmers to choose from and observation of seeding, irrigation, forage harvesting, silage production, grassland management and breeding of sheep, beef cattle and milk cow

    研習班教學活動的後半部分側重於通過農和研究站上的演示來向學員們介紹生產實踐經方面的知識。這些演示活動包括參觀供農民選擇的品種示範田和觀看播種灌溉牧草獲青貯飼料生產草管理以及羊肉牛和奶牛的生產。
  11. This dissertation is on the basis of iran steam and developing project for 12 units in five power plants. this project is epc project ( i. e. engineering, procurement, construction ) and includes the finance and local manufacture. the value of this project is huge and the works related to this project are very complicate

    本案例基於伊朗蒸汽發電機組項目,該項目是對5個電廠的12臺機組的系統設計、土建、設備采購、設備組裝、設備試車、現場驗收和買方人員培訓等工作,即epc (工程、采購、土建) ;該項目還涉及到項目融資和地方製造。
  12. Field acceptance tests of storage pumps

    蓄水泵的現場驗收
  13. Field acceptance tests to determine the hydraulic performance of hydraulic turbines, storage pumps and pump - turbines

    測定水輪機蓄能泵和水泵-水輪機水力性能的現場驗收
  14. Studied the cluster and background reduction algorithm and, proposed an enhanced adaptive step average method based on the amplitude of a - scan signal ; 2. improved the gpr data acquisition and processing software, some utilities have been added such as position wheel control program, data format translation etc. ; 3. implemented 3d targets imaging using mixed programming of matlab and visual c + + ; 4

    本文的主要工作如下: 1 .研究了探地雷達回波信號雜波及背景去除演算法,改進了一種基於a - scan信號強度的自適應滑動平均法; 2 .改進並完善了探地雷達數據採集處理軟體,加入了定位輪控制數據採集、數據格式轉換、目標距離測定等程序; 3 .研究了探地雷達目標成像演算法,利用動態鏈接庫技術實了在脫離matlab環境下在visualc + +編寫的程序中調用matlab程序對目標進行三維成像的功能; 4 .參加外及項目
  15. Organize preparations of proposals in terms of project regarding technical changes

    組織公司技改工程的方案編制,施工管理組織,以及工程的相關工作。
  16. Acoustics. determination of sound insulation performances of enclosures. part 2 : measurements in situ for acceptance and verification purposes

    聲學.密封罩隔音性能測定.第2部分:現場驗收證測量
  17. Based on the regulation of ccs, the paper is mainly devoted to completing the set of instruction through collecting the relative practical experience from many senior surveyors, and consulting qc / qa and designing experts in corresponding manufacturers, meanwhile, referring to china vessel standards ( cb ), china national standards ( gb ), international standards ( iso ) and iacs " unified requirements ( w24 ) as well as some regulations and instruction drawn up by other ones of the members of iacs such as lr

    但是,中國船級社並沒有一套系統的、可操作性的檢程序來指導船師實施檢。本文,以ccs的規范為基礎,集了多位資深船師和相關生產企業的設計及qc專家的意見,並參考了lr 、 dnv 、 nk 、 bv等iacs理事會員船級社的規范和須知,以及有關的船標、國標。
  18. Site acceptance shall mean the final acceptance of the equipment carried out by the purchaser at purchaser ' s facility in accordance with the acceptance test manual

    現場驗收是指買方按照手冊對買方設施上安裝的設備所的最後
  19. ( c ) corporation shall advise the purchaser promptly of any anticipated or actual delay affecting delivery or site acceptance together with any relevant detailed information and the anticipated extent of any such delay

    公司須及時將估計或實際推遲交貨或現場驗收的消息以及有關細節和估計的延誤的期限通知買方。
  20. Party a and party b shall make full endeavors to fulfill this contract with the stipulated period. the schedule of various activities is attached at appendix 4

    現場驗收應在本合同生效日後2周內進行,此項的時間按本合同第6條延長。
分享友人