環周張力 的英文怎麼說

中文拼音 [huánzhōuzhāng]
環周張力 英文
hootension
  • : Ⅰ名詞1 (環子) ring; hoop 2 (環節) link 3 (姓氏) a surname Ⅱ動詞(圍繞) surround; encircle;...
  • : Ⅰ名詞1 (圈子; 周圍) circumference; periphery; circuit 2 (星期) week 3 [電學] (周波的簡稱) c...
  • : Ⅰ動詞1 [書面語] (給弓或樂器上弦) fix (a bowstring); string (a musical instrument) 2 (分開;...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  1. The district is one of the districts in baoding city, which is located in the north - east of the city and near the state road 107, the looping road east circling road north circling road pass through the district, so the traffic is convinent. because the urban area of the city is enlarged, the urban village is formed, the infrustructure for life around the urban village is perfect, but the village itself is poor to live, so the land is not used effectivly, the transformation of the urban village is necessary

    境簡介:北市區是保定市三區之一,位於保定市區東北部,毗臨107國道高速公路引路,東外北外縱橫轄區,形成四通八達的交通優勢,路緣經濟開發潛巨大。隨著城區的擴,形成了部分城中村,盡管圍生活服務設施完備,但居住境落後,土地資源沒有很好的得到高效利用,因此需要進行改造再度開發取得更高效益。
  2. Aiming at main project of the xiaoxihu bridge, a low pylon cable - stayed bridge, based on the existing theory and method of the bridge construction controlling theory, using the basic function of " ansys ", farther exploitation was done on concrete elasticity and creep calculating distinguishingly, nonlinearity analysis theory was used to construct the space model, the main beam, string pylon and abutment were simulated by the beam elements which was considered the shearing effect. which is worthy of considering that using the geometric non - linear truss elements to simulate the stayed - cable, form traveler is modeled as structure elements and participate in stress analysis. four stages are used to model the construction stage, which are : ( 1 ) the erection of form traveler ; ( 2 ) placing the segmental concrete ; ( 3 ) jacking the tendons ; ( 4 ) tensioning the stay cables

    針對建設中的小西湖矮塔斜拉橋的主體工程,結合已有的橋梁施工控制的理論和方法,利用大型通用計算軟體ansys的基本功能,並著重在混凝土彈性計算及徐變計算方面做了相應的二次開發,採用非線性分析理論並建立了空間結構模型、用考慮剪切作用的梁單元模擬主梁、索塔和橋墩;用可考慮幾何非線性的桁元模擬斜拉索、施工掛藍作為結構單元進行拆裝,參與受計算,整個施工過程按施工循期分為若干階段,每個階段又分為四個工況,即:空掛藍就位、澆築完畢階段混凝土、拉預應鋼筋和拉斜拉索。
分享友人