環境小組 的英文怎麼說

中文拼音 [huánjìngxiǎo]
環境小組 英文
environmental team
  • : Ⅰ名詞1 (環子) ring; hoop 2 (環節) link 3 (姓氏) a surname Ⅱ動詞(圍繞) surround; encircle;...
  • : 名詞1 (疆界; 邊界) border; boundary 2 (地方; 區域) place; area; territory 3 (境況; 境地) co...
  • : Ⅰ形容詞1 (體積、面積、數量、強度等不大) small; little; petty; minor 2 (年紀小的; 年幼的) youn...
  • : Ⅰ名詞1 (由不多的人員組成的單位) group 2 (姓氏) a surname Ⅱ動詞(組織) organize; form Ⅲ量詞(...
  • 環境 : environment; surroundings; circumstances; ambient; closeness; ambience; ambiance; atmosphere
  • 小組 : group
  1. We spearheaded the implementation of a wide range of environmental hygiene improvement measures as part of the team clean operation

    本署率先落實多項?生改善措施,以配合「全城清潔策劃」的工作。
  2. The regulation showed : land use diversity and combination types of land use were increased from suburb to distant suburb plain and half coteau. the opposition trend was presented on the change of the concentration index of land use. as distant suburb coteau was controlled by the background of mountain, the land use diversity index was minimum and the concentration index was maximum

    北京市土地利用格局的區域差異呈現如下規律:土地利用多樣性和土地利用合類型數由近郊向遠郊平原、遠郊半山區依次遞增;土地利用的集中程度則剛好相反;遠郊山區由於受大背景山地控制,土地利用多樣性在各區中是最的,而集中程度則是最大的。
  3. The results show that : 1 ) though the water environment of nanyisan is more muddy than others, algal can still grow ; 2 ) the composition and rock type of the algal limestone are complex, the main rock types include lettuce - like stromatolites, algal reef, digitate stromatolies, wave - like stromatolites and so on ; 3 ) the deposits of algal limestones were formed in low - energy peritidal to subtidal high - energy environment of lakeshore slopes, sliding under the action of gravity and some other factors and become slump mixosedimentite layers ; 4 ) the physical property of algal limestones layers is better than others ; 5 ) the genetic development of the sediment decides that the single deposit is small, distributive and thin - layed

    結果表明,南翼山藻灰巖沉積水體相對渾濁,但藻類仍能生長;該區藻灰巖巖石成及類型復雜,主要的藻灰巖巖石類型有包心菜狀疊層石、藻礁、指狀疊層石、水平波狀疊層石等;其主要為濱岸斜坡上低能潮上至高能潮下形成的沉積體,在重力等因素的作用下產生滑動或滑塌形成的微生物成因的滑塌混積巖;巖層物性好於其它巖層;藻灰巖層的成因決定了該地區單個沉積體規模、分散、層薄。
  4. For example : the designer often only pays close attention to the composition in the plan form, and ignore the user " s need, in other words, ignore the character of the residents " behavior and the important social, cultural and psychological influence of the living environment on resident " s life ; there are often strong contrast of firm and magnificent houses with extremely bad public open space environment ; either low volume rate or wasted land resource can always be found ; the doctrinaire cloning leads to the lack of character, distinction and beauty in housing design and construction

    例如:設計者往往僅關注平面形式的構圖,而忽視使用者的需要,即忽視居民的生活行為特徵與居住中社會文化心理等因素對居民生活的重要影響;區建設中常有住宅堅固氣派而外部公共空間極差的強烈反差;容積率過低、浪費土地資源的現象也時有發生;不加分辨的拿來主義導致社區團建設缺乏特色、個性和美感等。
  5. Dr kerry kirwan who is leading the team said, we have looked at the plastic covers and facias and looked at the ways we can minimise the environmental impact

    科萬博士是這個項目的負責人,他稱: 「我們已經對手機的塑料外殼和顯示屏進行了研究,還考慮了採用能夠盡量減少污染的方法。
  6. The organizing of space environment includes : organizing space in proper order, the field and security of space environment, the specific character of space environment. in the part of the plan and design of lawn, the function of lawn and the index of the plan, the technique of planning lawn were very important, so they were introduced in detail, children field and old peoples " field were welcomed, they were also introduced in detail

    居住區的室外空間織包括:室外空間的有序織、室外空間的領域性和安全性、室外空間的可識別性三方面;對于綠地的規劃設計,詳細介紹了綠地的作用、綠地規劃指標和區中各種綠地的規劃設計的內容和方法;兒童游戲場、老年人活動場地及品設施也是室外中必不可少的,對此,同樣詳細論述。
  7. 8 on completion of the decontamination works and before starting the proposed housing development at the project area, the permit holder shall submit the final soil quality report of the previously contaminated areas to the eia sub - committee of the advisory council on the environment for inspection

    在工程項目范圍完成除污工程后及在展開建議的建屋發展計劃之前,許可證持有人須向諮詢委員會委員會提交先前受污染地帶的最終土壤質素報告,以供查閱。
  8. 9 the permit holder shall submit to the director for approval, within 30 days of the award of decommissioning contract, a plan for additional site investigation for " low risk " areas including the hong kong aircraft engineering company ( haeco ) building as mentioned in section 7. 6. 2 and figure 8. 5 of the eia report

    在工程項目范圍完成除污工程后及在展開建議的建屋發展計劃之前,許可證持有人須向諮詢委員會委員會提交先前受污染地帶的最終土壤質素報告,以供查閱。
  9. Chapter 5 discusses partial environment in residence environment, that is, street environment, water environment, plant afforestation and gadget equipment, because these are the key and sensitive links in environmental self - organization development

    第五章討論了住區中的局部,即街道、水體、植物綠化、休閑娛樂場地和設施。因為這些是織發展中的關鍵、敏感節。
  10. 4 before starting the decontamination works using the sve / as system, the permit holder shall submit to the eia sub - committee of the advisory council on the environment, a report containing the results of the pilot test on the effectiveness of the sve / as system

    在利用土壤蒸氣抽取法空氣分佈法系統進行除污工程前,許可證持有人須向諮詢委員會委員會提交一份闡述測試土壤蒸氣抽取法空氣分佈法系統成效的型試驗性測試結果的報告。
  11. In the presence of impulsive noise, the two received signals are combinated, so the estimated impulse response of the channel is the eigenvector of its covariation matrix corresponding to the smallest eigenvalue, which can be realized adaptively using generalization of the normalized least mean - norm ( generalized nlmp ) algorithm

    該演算法在脈沖噪聲下,合兩個接收信號,使其共變矩陣最特徵值對應的特徵向量為通道的估計,並基於廣義歸一化最平均范數(廣義nlmp )方法自適應得到該特徵向量,從而獲得時延估計。
  12. At the same time, a series of development trend in organization structure innovation under the information environment has been put forward : flat model is the basis of organization structure optimization ; flexibility not only is beneficial to organization creation, innovation and accelerating reaction speed, but also strengthens organization ' s control centripetal force during the process of being operated continuously. it has rapid adjusting ability in time according to unexpected results of predictable change ; networking can not only decrease internal management cost and realize integration between supply chain and sale chain in worldwide, but also realize enterprise " s completely authorized managemen in order to promote substantial leap in enterprise economic benefit ; virtual model is centralizing limited resources on high additional value function and making low additional value virtual in order that the largest resource support can be obtained in the lowest cost and the whole organization is operated in the most effective way for adapting to market " s rapid change with high elasticity ; creating learning pattern in organization makes enterprise expand the width and depth of information being exchanged with the outer so as to keep enterprise in an unassailable position

    提出信息化織結構創新的一系列發展趨勢:扁平化是織結構優化的基礎;柔性化既有利於織的創造、革新、加快反應速度,又能使織在不斷磨合中加強控制的向心力,具有適時根據可預期的變化的意外結果迅速調整的能力;網路化不僅減少了內部管理成本、實現了企業全世界范圍內供應鏈與銷售節的整合,而且實現了企業充分授權式的管理,極大地促進了企業經濟效益,實現質的飛躍;虛擬化是將有限的資源集中在附加值高的功能上,而將附加值低的功能虛擬化,以最的代價獲得最大的資源支持,從而使整個織以最有效的方式運轉,以高彈性化來適應市場的快速變化;創建學習型織,使企業拓展了與外界進行信息交流的廣度和深度,使企業立於不敗之地。
  13. For china, they bring home the message of a recent united nations warning

    環境小組將聯合國最近發出的警告帶回了中國。
  14. 2 an environmental team shall be established prior to the commencement of construction of the projects

    在展開建造工程之前須先設立一個環境小組
  15. 1 an environmental team ( et ) shall be established before the commencement of construction of the project

    在展開建造工程之前須先成立一個環境小組
  16. Any proposed changes to the coral transplantation activities shall be justified by the environmental team and agreed by the director before implementation

    任何關于珊瑚移植活動的更改建議,在執行前須由環境小組提出充分的理由,並獲署長同意。
  17. The et leader shall be responsible for the implementation of the em & a programme in accordance with the em & a requirements as contained in the em & a manual

    環境小組長須按監察及審核手冊內載的監察及審核規定,負責有關監察及審核計劃的實施。
  18. During construction kcrc s own specialist environmental team has been monitoring and auditing contractors performance to ensure contractual obligations are met. an independent environmental checker was also appointed

    施工期間,九鐵的環境小組,一直監察和審核承建商的表現,確保承建商履行合約訂明的責任。
  19. 4 four copies of monthly em & a reports certified by the et leader, and verified by the ic ( e ) shall be submitted to the director within 10 working days from the end of the reporting month

    在須提交報告的月份結束后的10個工作天內,須向署長提交4份由環境小組長證明和獨立查核人核證的每月監察及審核報告。
  20. 3 four copies of the baseline monitoring report certified by the et leader, and verified by the ic ( e ) shall be submitted to the director before the commencement of any major construction works that would affect the monitoring results

    在任何會影響監測結果的大型建造工程展開前,須向署長提交4份由環境小組長證明和獨立查核人核證的基線監測報告。
分享友人