環形隔片 的英文怎麼說

中文拼音 [huánxíngpiān]
環形隔片 英文
ring spacer
  • : Ⅰ名詞1 (環子) ring; hoop 2 (環節) link 3 (姓氏) a surname Ⅱ動詞(圍繞) surround; encircle;...
  • : partitionseparate
  • : 片構詞成分。
  • 環形 : annular; ringlike; ring form; bight; annularity環形癌 annular carcinoma; 環形電路 [訊] loop circu...
  1. The pattern of shoujinliao ' s climatic design : first, it talks about shoujinliao ' s ventilation, analyses every stale belong to each compose of space appeared in shoujinliao. sum up that ventilation system is made up by draught and wind route, by showing data and photograph, then, it talks about shoujinliao ' s methods of sunshade and heat insulation, that is, sunshade of concentrated, sunshade of small yard, sunshade of eaves, sunshade of balcony. heat insulation of outward wall, clay tiled roof and composition neatly

    著重分析手巾寮結合氣候的模式,首先談及手巾寮建築通風經驗,深入分析各種空間高低組合情況下手巾寮的通風情況,藉助調研資料和實景照對通風系統中通風口和風道的合理安排進行介紹;其次是手巾寮其他氣候經驗,如遮陽方式主要體現在連房密集遮陽、小天井遮陽、檐下灰空間遮陽、陽臺遮陽等,又如熱途徑有墻體熱、灰泥苫背瓦屋面熱及規整熱,再如綠化水體的降溫措施,上升到境高度看待建築,探討手巾寮組織天井綠化、利用街巷綠化、配合周邊水域的建造經驗。
  2. Application of the mf method normally involves construction of an intermediate column at every 4 meters. on a crossover section, which serves as a passage for train change directions, intermediate columns placed at 4 - meter intervals would block the route of a turning train. therefore, a solution must be found to the problem of location of intermediate columns on crossover sections

    (四)轉轍段( crossover )處以多圓潛盾工法施作之可能性,由於轉轍段系為提供電聯車換軌功能之處,兩軌道間不能有任何障礙物,而多圓隧道間每四米即需中間柱,于設計上有何解決之道。
分享友人