環間隙 的英文怎麼說

中文拼音 [huánjiān]
環間隙 英文
czermak space
  • : Ⅰ名詞1 (環子) ring; hoop 2 (環節) link 3 (姓氏) a surname Ⅱ動詞(圍繞) surround; encircle;...
  • : 間Ⅰ名詞1 (中間) between; among 2 (一定的空間或時間里) with a definite time or space 3 (一間...
  • : 名詞1 (縫隙; 裂縫) crack; chink; crevice 2 (空閑) gap; interval 3 (漏洞; 機會) loophole; op...
  • 間隙 : (空隙) interval; gap; freedom; space; [機械工程] clearance; separation; stricture; clear; inter...
  1. Moreover, the octahedron voids would change to shallow orbicular pits and vanished at last if the etching time was prolonged. our results were contrasted to the result that the fpds are interstitial type defects concluded by takeno et al and support the views that the fpds are vacancy - type defects

    本次的實驗結果與takenold等人對fpds的研究結果大大相反,他們認為fpds的端部是一些型的位錯,而本實驗的實驗結果卻支持了fpd缺陷屬空位型缺陷的觀點。
  2. In this article, according to heat conduction theory, elastic creep theory and finite element theory, the temperature field and creep stress field in the arch dam during construction and operation are simulated and analyzed by means of three dimensional finite element relocating mesh method, and the distribution law of the temperature field and creep stress field in the arch dam during construction and operation are systematically studied, and according to the construction process of concrete arch dam, the effect of lamination placement, construction interval, elastic modulus change, thermal insulation change, surrounding temperature change, concrete creep and autogenous volume change on thermal stress in the arch dam are also considered

    論文根據熱傳導理論、彈性徐變理論及有限元理論,用三維有限元浮動網格法對拱壩施工期和運行期溫度場、徐變應力場進行了全過程模擬分析,較為系統的研究了混凝土拱壩施工期和運行期溫度場、徐變應力場的分佈規律,在分析中按照混凝土拱壩施工過程,考慮了混凝土分層澆築、施工、彈模變化、絕熱溫升過程、境溫度的變化、混凝土徐變、自生體積變形等因素對壩體溫度應力的影響。
  3. By using a counter and an operation microprocessor, this paper analyses the measuring method and designs an instrument of edm sinking process in discharge state. this instrument takes samples of voltage, current signal and strong and weak of high frequency signals of detecting voltage amplitude, translates them into various time pulses in discharging state. and a counting unit turns these pulses into digital signals, then send them to a microprocessor. finally various discharge time percentages are sent to the control tache

    通過采樣電火花加工放電的電壓、電流信號和檢測電壓幅值上的高頻信號的強弱,得出反映放電狀態的各種時脈沖,利用計數器分別對其計數,再送給單片機運算處理,輸出控制節所需的各種放電狀態時百分數。
  4. Abstract : by using a counter and an operation microprocessor, this paper analyses the measuring method and designs an instrument of edm sinking process in discharge state. this instrument takes samples of voltage, current signal and strong and weak of high frequency signals of detecting voltage amplitude, translates them into various time pulses in discharging state. and a counting unit turns these pulses into digital signals, then send them to a microprocessor. finally various discharge time percentages are sent to the control tache

    文摘:通過采樣電火花加工放電的電壓、電流信號和檢測電壓幅值上的高頻信號的強弱,得出反映放電狀態的各種時脈沖,利用計數器分別對其計數,再送給單片機運算處理,輸出控制節所需的各種放電狀態時百分數。
  5. In this paper, the measurement system of the piston ring end gap based on the computer vision is studied by using the theory of the computer vision, the theory of the image processing and the mathematics knowledge

    本論文中利用計算機視覺理論、圖像處理理論和數學知識,研究了基於計算機視覺的活塞閉口測量系統。
  6. Emtric exhibits good oxidation stability even under the conditions of elevated temperatures at the spark gap and exposure to air found in emtric process

    Emtric具有極佳的抗氧化性,使得它在放電的高溫與曝氣境下,仍能保持穩定。
  7. Model xjq has following features : ( 1 ) dummy bottom is adopted, making the recycling capacity of the recycling cylinder is 2. 5times of the tand. ( 2 ) the stator is a cylinder in structure with its inner wall being vertically ribbed, and slots are placed, leading to better cutting lffect to the slurry. ( 3 ) due to low immerging depth of the rotator, low rurning speed of the impeller, and wide space between the impeller and stator, wearing is low and power consumption greatly reduced. ( 4 ) it is spontaneously aerated

    Xjq型浮選機為仿維姆科型,該機主要有以下幾個特點: ( 1 )採用了假底,循簡可使循量達到槽容積的2 . 5倍; ( 2 )定子結構為圓筒型,內壁設有立筋條和長孔,對礦漿的前切作用好; ( 3 )轉子浸沒深度淺,葉輪轉速低,葉輪和定子大,所以其磨損輕,動力消耗大大減少; ( 4 )可自吸空氣。
  8. In the upper jurassic to tertiary, there is the alkali diagenetic ambient, in which the inter - pore fluid is inherited from the buried syngenetic water, i. e., alkali saline

    上侏羅紀至第三系為堿性成巖境,流體繼承了封存同生水特徵,為堿性鹽鹵水。
  9. Analyze item by item the position of unintact cycle, the running clearance of unintact cycle, locking - deform, datum dimension regulating, repeatly install, power voltage wave and marking running etc. at the same time, we give the calculating formula to calculating the running marking random error, and use it to calculate the system error of big diameter measure instrument - - datum dimension frame error, gyro - wheel diameter error, error caused by circumstance temperature, error caused by backing distance, angle error, delay error of data collecting circuit, lathe main shaft running error, workpiece install partial error

    對不完整圓的位置、不完整圓的轉動、鎖緊變形、基準尺調整、重復安裝、電源電壓波動、標記轉動等隨機誤差進行了逐項分析,並給出轉動標記隨機誤差的計算公式。對大直徑測量儀的系統誤差?基準尺尺架誤差、滾輪直徑誤差、境溫度引起的誤差、後退距離引起的誤差、角度誤差、數據採集電路延時誤差、車床主軸回轉誤差、工件安裝偏心誤差分別進行了計算,最後對誤差進行合成。
  10. Carbon ramming material is used on the spacer, the bottom of blast furnace and some other parts of the blast furnace

    高爐爐底墊層、爐底和爐缸行碳塊與爐殼,爐底水冷管以上到爐底鋼板。
  11. According to the experimental parameters of mpt, the main performance parameters of different propellants have been given by engineering performance computation under designed and working states, which has great importance for the experimental research and the future work. 2. for helium and argon, the factors which influence on mpt ' s vacuum steady work have been discussed such as the material of microwave tie - in, the distance between the probe and inner - conductor, the position of the inner - conductor, the input power of microwave, the mass flowrate of propellant and the vacuum pressure of environment, and the influence has been discussed of the microwave power and the mass flowrate of propellant on the pressure of the resonance cavity, thrust, reflected power and the temperature of the resonance cavity

    論文的工作和新見解主要包括: 1在設計狀態和工作狀態下,根據mpt的實驗參數,對mpt使用不同工質時的性能進行了工程估算,這對mpt現階段的實驗研究和今後的研究有重要的指導意義; 2對于he 、 ar推進工質,討論微波的接頭材料、探針與內導體的、內導體的位置、微波的輸入功率、工質的質量流量以及境真空度對mpt真空啟動和穩定工作的影響,並探討微波的輸入功率、工質的質量流量對諧振腔壓強、推力、反射功率以及諧振腔溫度的影響; 3對于n _ 2 、 h _ 2 、 nh _ 3 、 h _ 2o推進工質,主要討論與he 、 ar工質不同的特性,並從長遠的眼光和工程應用的角度,認為其可行性不容置疑,潛在優勢不可忽略,是未來mpt應用的主流推進工質。
  12. To solve these problems, this paper gives the gap sensor ’ s fault model, finds out the weaknesses, and designs a bit fault detecting system which is tested by experiment, improving the maintenance efficiency

    本文對傳感器進行故障建模,找到傳感器中的薄弱節,針對這些薄弱節設計了傳感器的bit故障檢測系統,最後通過實驗對系統進行了測試,提高了維護的效率。
  13. The derivation of the leakage flow rate formula of the special annular clearance between the piston and cylinder under condition of variable viscosity in the axial piston pumps was carried out. at same time, considering the questions of the eccentricity and the variable sealing length of piston friction pair, the modified coefficient of the calculation formula of the flow - rate of the leakage was given

    在變粘度、柱塞偏心以及變密封長度條件下,對軸向柱塞泵中柱塞與缸孔之的特殊圓的泄漏流量公式進行推導,得到了該計算公式的修正系數; 6
  14. Firstly, the temperature varies in a large range in the place where the gap sensor works, so this paper analyzes the temperature drift of gap sensor, and finds out that the main reasons which result in temperature drift are the resistance of detecting coil and demodulating circuit parameters. to resolve this problem, a practical design of detecting coil is given, and a compensative measure considering the detecting coil and demodulation circuit is proposed to improve the temperature stability of gap sensor

    首先,針對傳感器工作境溫度變化較大的情況,本文對傳感器溫度漂移現象進行了分析,認為檢測線圈電阻和檢波電路參數變化是造成傳感器溫漂的主要原因,建立了檢測線圈的數學模型,提出了檢測線圈和檢波電路綜合補償方法,解決了傳感器的輸出信號溫度穩定性的問題。
  15. In this article, according to heat conduction theory and finite element theory, the temperature field in the arch dam during construction and operation are simulated and analyzed by means of three dimensional finite element relocating mesh method, and the distribution law of the temperature field in the arch dam during construction and operation are systematically studied, and according to the construction process of concrete arch dam, the effect of lamination placement, construction interval, thermal insulation change, surrounding temperature change and water storage on temperature field in the arch dam are also considered

    論文根據熱傳導理論及有限元理論,用三維有限元浮動網格法對施工期和運行期溫度場進行了全過程模擬分析,較為系統的研究了混凝土拱壩施工期和運行期溫度場分佈規律,在分析中按照混凝土拱壩施工過程,考慮了混凝土分層澆築、施工、絕熱溫升過程及壩體材料分區、水庫分期蓄水和境溫度變化等因素對壩體溫度場的影響。
  16. Meanwhile it retains evenness on lift force to prevent leakage of residue that is caused by installation clearance error or changes in welding criteria, flow off molten iron as well as break - over welding, so that the ideal fosion depth and finishment have been fulfilled

    在需原動力的條件下,該機利用彈性夾角變化,隨著筒體轉動,使墊層焊劑始終緊貼筒體外側向焊接區,並保持托力均勻防止因裝配誤差或焊接規范變化而引起漏渣,鐵水下淌及焊穿現象,達到理想的熔深度和光潔度。
  17. In theoretical study, through analyzing operational characteristics of traffic flow in roundabout and studying the acceptable gap influence on delay and different arrival distributions effect to the capacity, the paper brings forward the experiment methods to study the capacity of roundabout by using the simulation technology

    在理論研究方面,就形交叉口交通流運行特性進行了分析,並深入地研究了可接受對延誤的影響以及車頭時距分佈對通行能力的影響,提出了利用模擬技術研究形交叉口通行能力的實驗方法。
  18. In view of the problems in the design of the large andmedium - sized indoor substations built by guangzhou power bureau in recent years, points for attention in the design of indoor substations are expounded in terms of ventilation, cable channel, reservation of hangers and space for transportation and installation, ground wire, lighting for the whole substation, etc

    僅僅推力頭軸、孔存在時,推力頭其它零件製造質量與安裝質量達到設計要求,是不會影響精確徑向定位的.爾王莊泵站9機組出現的鍵與平鍵斷裂情況,可能不是由軸、孔過大引起,而是其它尚未查明的原因
  19. The result of the calculation for tip clearance is reasonable when it is compared with theory. two ways are put forward for convention of dimension of the turbine components from high temperature to low one, which is related with tip clearance, a simple example is used to illuminate that the two ways are useful, using the method of design optimization, axiisk and a blade of a certain turhine is analysed, it showes that the method of design optimization is feasible to be used for convertion of dimension of the turbine components. finally, ansys software is used to analyzed the variation of tip clearance with the method of cyclic symmetry analysis when engine works under the conditions of temperature and rotational speed, am using a new method to deal with thermal contact resistance in the calculation

    本文完善了計算渦輪葉尖的簡化演算法程序,增加了程序的計算功能,並將其應用於某高壓渦輪進行葉尖分析,所得結果與理論結果進行了對比,得出修改後的程序用於葉尖計算是合理的;同時提出了與葉尖相關的渦輪典型部件的冷、熱態的尺寸兩種換算方法,使用優化設計的方法進行了實例分析,說明了所提出的計算方法是可行的;最後應用ansys有限元軟體利用循對稱的方法分析了某型發動機高壓渦輪在溫度場及離心力作用下的葉尖在發動機工作過程中變化情況,並分析了計算中的接觸熱阻的處理問題。
  20. Cassini entered orbit shortly after midnight wednesday etd ( 0400 gmt thursday ) after threading a gap between two of saturn ' s rings

    卡西尼號周3午夜預定發射時剛過就穿過了土星的2個外環間隙進入軌道
分享友人